Block 6763, lot 021
538 Congo St
- City’s use
- Single Family Residential
- Built
- 1917
- Stories
- 2
- Units
- 1
- Rooms
- 2 bedrooms, 2 bathrooms
- Building
- 1,370 sq ft
- Lot
- 3,400 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 2, 2017 | Never finaled issued Aug 2017, no final | 538 Congo St | street space permit - renewal of permit # 201507302919Details
street space permit - renewal of permit # 201507302919 | ||
| Mar 15, 2017 | Completed final sign-off Aug 2018 | 538 Congo St | Art Of Construction Inc | exploratory demo to confirm structural conditions in wall. remove 30 sq ft of decking at rear deck to dig pot hole in order to measure the depth of (e) footing at east elevation. remove 30 sq ft of main floor overhang soffit to confirm direction of floor framing. remove 50 sq ft of drywall in bsmtDetails
exploratory demo to confirm structural conditions in wall. remove 30 sq ft of decking at rear deck to dig pot hole in order to measure the depth of (e) footing at east elevation. remove 30 sq ft of main floor overhang soffit to confirm direction of floor framing. remove 50 sq ft of drywall in bsmt | $800 |
| Sep 9, 2015 | Completed final sign-off Jan 2016 | 538 Congo St | Art Of Construction Inc | remove existing laundry closet partition to open up; dry rot repair; relocate duct work into soffit. insulate exterior wall, drywall and paint. repair (e) concrete floor with topping compound.Details
remove existing laundry closet partition to open up; dry rot repair; relocate duct work into soffit. insulate exterior wall, drywall and paint. repair (e) concrete floor with topping compound. | $5,000 |
| Jul 30, 2015 | Completed final sign-off Aug 2018 | 538 Congo St | Art Of Construction Inc | new 2nd floor addition in existing house, 2 story vertical circulation plan basement to 2nd floor & full seismic upgrade.Details
new 2nd floor addition in existing house, 2 story vertical circulation plan basement to 2nd floor & full seismic upgrade. | $180,000 |
| Sep 14, 2010 | Completed final sign-off Feb 2011 | 538 Congo St | Renewal By Andersen | retro fitting 1 window in bathroom, same size and location, not visible from street, temp glass, no structural changesDetails
retro fitting 1 window in bathroom, same size and location, not visible from street, temp glass, no structural changes | $1,627 |
| Feb 2, 2006 | Completed final sign-off Mar 2006 | 538 Congo St | Home Works Inc/Kitchen Work Inc | replace 3 windows, kind for kind, not visible from street.Details
replace 3 windows, kind for kind, not visible from street. | $3,500 |
| Jun 20, 2005 | Completed final sign-off Aug 2005 | 538 Congo St | Home Works Inc/Kitchen Work Inc | replace 8 windows,size for size,wood to wood composite,visible from streetDetails
replace 8 windows,size for size,wood to wood composite,visible from street | $8,800 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Art Of Construction Inc (3), Home Works Inc/Kitchen Work Inc (2), Renewal By Andersen
- Engineers
- Tristan Warren
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.