Back to bathroom remodel contractors
Art Of Construction Inc
- Based in
- So San Francisco
- On San Francisco permits
- Sep 2001 to Jun 2026
- Last 24 months
- 8 permits filed
160 permits since 2000: 139 completed, 2 in progress, 12 never finaled, 7 expired or cancelled.
Of the 12 never-finaled permits, 3 are 3 to 5 years old, 3 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
39 bathroom remodel permits: 32 completed, 1 in progress, 2 never finaled, 4 expired or cancelled. Typically 2 days from filing to permit and 256 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2025 | In progress issued Jan 2026 | 1874 Great Hy | enclose 120 sf below an e) floor above the rear of the bldg. new addition will included a full bath & study. e) wood stair at rear will be reconfigured. all windows & exterior doors will be replaced, all exterior siding will be replacedDetails
enclose 120 sf below an e) floor above the rear of the bldg. new addition will included a full bath & study. e) wood stair at rear will be reconfigured. all windows & exterior doors will be replaced, all exterior siding will be replaced | $363,000 |
| Jan 13, 2025 | Completed final sign-off Dec 2025 | 1529 Beach St | replacing existing windows and doors in kind, no change to opening, no change in location. kitchen and bath renovation. 5 windows face the street,setback all. others facing side yard or rear yard.Details
replacing existing windows and doors in kind, no change to opening, no change in location. kitchen and bath renovation. 5 windows face the street,setback all. others facing side yard or rear yard. | $150,000 |
| Jan 11, 2022 | Never finaled issued Jan 2022, no final | 1350 06th Av | remodel of kitchen, master bath and powder room. relocate (e) interior stairs. no wall alterations. replace exterior bedroom door with like size. add cabinets to living room.Details
remodel of kitchen, master bath and powder room. relocate (e) interior stairs. no wall alterations. replace exterior bedroom door with like size. add cabinets to living room. | $395,000 |
| Sep 22, 2021 | Completed final sign-off Jan 2022 | 815 24th Av | remodel 2 upstairs bathrooms - non structural. remove fixtures & tile install new shower tile and fixtures. h.e. lighting & vacancy sensorDetails
remodel 2 upstairs bathrooms - non structural. remove fixtures & tile install new shower tile and fixtures. h.e. lighting & vacancy sensor | $81,500 |
| Jun 29, 2021 | Expired or cancelled withdrawn May 2022 | 601 04th St | interior remodel of (e) unit: new kitchen cabinets, counter, appliances, relocate bathroom (new fixtures. demo some (e) cabinets & partiion. some new partitions. new (e) guardrail replacement at light/loft.Details
interior remodel of (e) unit: new kitchen cabinets, counter, appliances, relocate bathroom (new fixtures. demo some (e) cabinets & partiion. some new partitions. new (e) guardrail replacement at light/loft. | $30,000 |
| Jun 4, 2021 | Completed final sign-off Aug 2024 | 1232 Cortland Av | one kitchen & one bathroom remodel. new cabinets,flooring,and finishes. add outlets per code, add angel stop for ice maker. install 9 additional can lights. replace all existing angle stops. replace shower valve. install new baseboard & trim. non structuralDetails
one kitchen & one bathroom remodel. new cabinets,flooring,and finishes. add outlets per code, add angel stop for ice maker. install 9 additional can lights. replace all existing angle stops. replace shower valve. install new baseboard & trim. non structural | $20,000 |
| Jan 5, 2021 | Completed final sign-off Feb 2022 | 86 Elsie St | interior remodel: (n) bathrooms - renovated, stair reconfiguration & new closets. exterior: limited siding maintenance/repair, window replacement in kind & increase door opening not visible from street. no facade work. no work in public right of way. no changes to fixture count.Details
interior remodel: (n) bathrooms - renovated, stair reconfiguration & new closets. exterior: limited siding maintenance/repair, window replacement in kind & increase door opening not visible from street. no facade work. no work in public right of way. no changes to fixture count. | $100,000 |
| Mar 9, 2020 | Completed final sign-off May 2020 | 229 Granville Wy | remodeling at basement: 1 bathroom remodeling, change sliding door from 6'0 to 8'0 wide, rebuid stair to legal headroom. legalize family rom & office & bathroom at basement.Details
remodeling at basement: 1 bathroom remodeling, change sliding door from 6'0 to 8'0 wide, rebuid stair to legal headroom. legalize family rom & office & bathroom at basement. | $18,000 |
| Jan 21, 2020 | Completed final sign-off May 2020 | 229 Granville Wy | remodel (1) bathroom, like for like, (1) sink, (1) toilet, shower pan system. installing new lighting, exhaust fan, and cabinetry, new tiling. no modifications or removal of any wallsDetails
remodel (1) bathroom, like for like, (1) sink, (1) toilet, shower pan system. installing new lighting, exhaust fan, and cabinetry, new tiling. no modifications or removal of any walls | $33,539 |
| Nov 14, 2019 | Completed final sign-off Jun 2022 | 1032 Broadway | revision to pa 2019-0326-6241 interior remodel to (e) residence including kitchen and bathrooms, and reconfigured floor plan. no exterior changes. no increase habitable area or conditioned volumeDetails
revision to pa 2019-0326-6241 interior remodel to (e) residence including kitchen and bathrooms, and reconfigured floor plan. no exterior changes. no increase habitable area or conditioned volume | $300,000 |
| Apr 5, 2019 | Completed final sign-off Jul 2020 | 31 Mullen Av | interior remodel with 1 new window, 1 new french door at 1st flr rear, relocate (e) bathroom at 1st flr, new internal stair, new wall at media room - bedroomDetails
interior remodel with 1 new window, 1 new french door at 1st flr rear, relocate (e) bathroom at 1st flr, new internal stair, new wall at media room - bedroom | $75,000 |
| Mar 26, 2019 | Expired or cancelled expired Jan 2023 | 1032 Broadway | interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maherDetails
interior renovation of extg living and dining room to repair water damage. removing one set of stairs, removal of 2 wood burning fire places. reface extg kitchen cabinets. reconfiguring 2 bathrooms upstairs. new led lighting in modified areas. no change to exterior. n/a for maher | $100,000 |
| Sep 27, 2018 | Completed final sign-off Jan 2019 | 51 Shawnee Av | kitchen remodel. remodel bathroom - tile shower, new fixtures. replacing 7 windows at rear & light well. u factor max. .32 same size.Details
kitchen remodel. remodel bathroom - tile shower, new fixtures. replacing 7 windows at rear & light well. u factor max. .32 same size. | $63,500 |
| Jul 27, 2018 | Completed final sign-off May 2019 | 140 Commonwealth Av | remodel (2) bathrooms, (2) kitchenttes/bars, in-kind; new plumbing/electrical fixtures throughout; new tile/cabinetry; replace (6) windows non-street facing in-kind; no wall additions/relocations, no structural workDetails
remodel (2) bathrooms, (2) kitchenttes/bars, in-kind; new plumbing/electrical fixtures throughout; new tile/cabinetry; replace (6) windows non-street facing in-kind; no wall additions/relocations, no structural work | $115,000 |
| Jun 13, 2018 | Completed final sign-off Dec 2019 | 187 15th Av | added window to orginal permit 201612235811, window located in new master bath (upper) not visible from the streetDetails
added window to orginal permit 201612235811, window located in new master bath (upper) not visible from the street | $800 |
| Feb 23, 2018 | Completed final sign-off Sep 2018 | 1487 Greenwich St | remodel: demo/replace like-for-like, kitchen - new appliances, cabinetry, counter top. install (n) ceiling canlights & gfci outlets per code. master & guest bath. install (n) plumbing fixtures gfci outlets & electrical fixtures per code. new shower pan and new tub. (1) kitchen. (2) bathrooms.Details
remodel: demo/replace like-for-like, kitchen - new appliances, cabinetry, counter top. install (n) ceiling canlights & gfci outlets per code. master & guest bath. install (n) plumbing fixtures gfci outlets & electrical fixtures per code. new shower pan and new tub. (1) kitchen. (2) bathrooms. | $82,000 |
| Aug 30, 2017 | Completed final sign-off Aug 2018 | 1723 29th Av | interior renovation to include new bedroom, bathroom, media room and laundry area in garage level, relocate internal stair, minor alteration around entry area. no alter facade or bldg envelope. no alteration of facade/building envelopeDetails
interior renovation to include new bedroom, bathroom, media room and laundry area in garage level, relocate internal stair, minor alteration around entry area. no alter facade or bldg envelope. no alteration of facade/building envelope | $80,000 |
| Apr 6, 2017 | Completed final sign-off Aug 2020 | 554 Liberty St | horizontal addition & interior remodel to (e) sfr. addition of a bedroom & bathroom @ ground floor. addition of 1 bedroom & 2 bathrooms @ 2nd floor. replace (e) windows in kind. new deck @ rear yard.Details
horizontal addition & interior remodel to (e) sfr. addition of a bedroom & bathroom @ ground floor. addition of 1 bedroom & 2 bathrooms @ 2nd floor. replace (e) windows in kind. new deck @ rear yard. | $200,000 |
| Dec 23, 2016 | Completed final sign-off Dec 2019 | 187 15th Av | 3 level rear addition & interior remodel (kitchen, dining, master suite, bath) partial lower level conversion to living space with lowered slab (family room, guest bedroom, bath, laundry) increase from 3 bedroom / 1.5 baths to 4 bedrooms / 3.5 bath home.Details
3 level rear addition & interior remodel (kitchen, dining, master suite, bath) partial lower level conversion to living space with lowered slab (family room, guest bedroom, bath, laundry) increase from 3 bedroom / 1.5 baths to 4 bedrooms / 3.5 bath home. | $425,000 |
| Oct 6, 2016 | Completed final sign-off May 2017 | 956 Elizabeth St | interior remodel to convert (e) 1/2 bath to full bath and replace door w/windowDetails
interior remodel to convert (e) 1/2 bath to full bath and replace door w/window | $17,500 |
| Sep 7, 2016 | Completed final sign-off Mar 2017 | 3 Lupine Av | interior remodel of kitchen, master bathroom, dress room and master bedrom. structural work associated with removal of interior walls.Details
interior remodel of kitchen, master bathroom, dress room and master bedrom. structural work associated with removal of interior walls. | $150,000 |
| Jul 26, 2016 | Completed final sign-off May 2017 | 956 Elizabeth St | remodel 2 bathrooms. replace 2 windows like for like. not visible from street. install a new bathroom plumbing & electrical fixts per ca code requirements. new hardie backerfor walls. no change to layout, walls, doors or openings.Details
remodel 2 bathrooms. replace 2 windows like for like. not visible from street. install a new bathroom plumbing & electrical fixts per ca code requirements. new hardie backerfor walls. no change to layout, walls, doors or openings. | $25,000 |
| Apr 26, 2016 | Completed final sign-off Oct 2016 | 1487 Greenwich St | demo master bathroom& guest bathroom. install new toilets (2) vanity sinks with faucets (2), light fan combos, (2) shower pans (1), tub (1) shower valves, shower heads, gfci electrical receptacles per code,Details
demo master bathroom& guest bathroom. install new toilets (2) vanity sinks with faucets (2), light fan combos, (2) shower pans (1), tub (1) shower valves, shower heads, gfci electrical receptacles per code, | $42,300 |
| Apr 7, 2016 | Completed final sign-off Sep 2016 | 3725 Folsom St | update kitchen cabinets, create open concept for kitchen, dining, and living rm. expand existing master bath into existing closetsDetails
update kitchen cabinets, create open concept for kitchen, dining, and living rm. expand existing master bath into existing closets | $45,000 |
| Jan 12, 2016 | Completed final sign-off May 2016 | 1191 Noe St | demo (e) laundry room floor and exterior door, demo bathroom and remove (2) windows. install (n) tile flooring & nu heat system in laundry and bathroom. replace exterior door and (2) windows in bathroom (like for like). install new tub, toilet, sink and faucet as well as new ceiling fan, lightsDetails
demo (e) laundry room floor and exterior door, demo bathroom and remove (2) windows. install (n) tile flooring & nu heat system in laundry and bathroom. replace exterior door and (2) windows in bathroom (like for like). install new tub, toilet, sink and faucet as well as new ceiling fan, lights | $21,200 |
| Oct 22, 2015 | Completed final sign-off May 2022 | 935 Diamond St | horizontal addition to an (e) single family residence. addition of two new dormers. replacing (e) windows in kind and re-cladding (e) exterior entry stairs. 2 new bathrooms to be added.Details
horizontal addition to an (e) single family residence. addition of two new dormers. replacing (e) windows in kind and re-cladding (e) exterior entry stairs. 2 new bathrooms to be added. | $200,000 |
| Sep 29, 2015 | Completed final sign-off May 2016 | 410 Pacific Av | demo of (e) interior offices, build 2 new ada bathrooms, install new handrails on (e) stairs, paint interior. install new flooring throughout re duct (e) hvac system. add 4 skylightsDetails
demo of (e) interior offices, build 2 new ada bathrooms, install new handrails on (e) stairs, paint interior. install new flooring throughout re duct (e) hvac system. add 4 skylights | $250,000 |
| May 4, 2015 | Completed final sign-off Aug 2015 | 1115 Fell St | apt #3: new kitchen cabinets & floor. new bathroom floor, electrical & plumbing. two walls to be moved in kitchen. structural work. all fire rated assemblies to be maintained. new window in kitchen - in kind. new hardwood in hall, kitchen & living room. reframe kitchen ceilingDetails
apt #3: new kitchen cabinets & floor. new bathroom floor, electrical & plumbing. two walls to be moved in kitchen. structural work. all fire rated assemblies to be maintained. new window in kitchen - in kind. new hardwood in hall, kitchen & living room. reframe kitchen ceiling | $30,000 |
| Dec 13, 2013 | Never finaled issued Dec 2013, no final | 1154 Stanyan St | remove 4x post, add 2 4x4 post and 2x square x 1' deep footing with 3- #4 rebar each way total of 2 footings. in bathroomDetails
remove 4x post, add 2 4x4 post and 2x square x 1' deep footing with 3- #4 rebar each way total of 2 footings. in bathroom | |
| Dec 2, 2013 | Completed final sign-off Jul 2017 | 382 Texas St | renovating & expanding (e) single family dwelling which will include expanding into the front & rear of the (e) structure & adding a partial upper floor. replace (e) windows/door & deck & interior kitchen/bath remodeling.Details
renovating & expanding (e) single family dwelling which will include expanding into the front & rear of the (e) structure & adding a partial upper floor. replace (e) windows/door & deck & interior kitchen/bath remodeling. | $445,000 |
| Nov 27, 2013 | Completed final sign-off Oct 2014 | 1154 Stanyan St | remodel gr fl bathroom. move toilet, install tub, new lights, wall fixture, switches, remove door, install window. sheetrock, tile, paint. ref pa#2011.0517.6177Details
remodel gr fl bathroom. move toilet, install tub, new lights, wall fixture, switches, remove door, install window. sheetrock, tile, paint. ref pa#2011.0517.6177 | $30,000 |
| Oct 13, 2011 | Completed final sign-off Apr 2012 | 558 Munich St | interior renovation on level one (1st floor) is creating new living space at rear garage level to include one bedroom, bathroom & laundry area, modify internal stairwell to code.Details
interior renovation on level one (1st floor) is creating new living space at rear garage level to include one bedroom, bathroom & laundry area, modify internal stairwell to code. | $53,000 |
| Mar 8, 2011 | Completed final sign-off May 2011 | 187 15th Av | replace 13 windows with retrofit windows, vinyl in back, wood in front. remodel bathroom. no framing changes, will replace pressure valve in shower.Details
replace 13 windows with retrofit windows, vinyl in back, wood in front. remodel bathroom. no framing changes, will replace pressure valve in shower. | $25,000 |
| Oct 4, 2010 | Completed final sign-off Feb 2012 | 631 Ofarrell St | kitchen and bathroom remodel. no structural. no doors/windows/walls under this permitDetails
kitchen and bathroom remodel. no structural. no doors/windows/walls under this permit | $20,000 |
| Jun 15, 2010 | Completed final sign-off Apr 2011 | 55 Mullen Av | new rear windows, doors and siding. interrio alterations incl. wall removal, remoedl bath on 2dn floor.Details
new rear windows, doors and siding. interrio alterations incl. wall removal, remoedl bath on 2dn floor. | $75,000 |
| Nov 18, 2008 | Expired or cancelled expired Jan 2010 | 198 Church St | exploratory demo for plumbing repair at bathroom (no other work)Details
exploratory demo for plumbing repair at bathroom (no other work) | $5,000 |
| Sep 5, 2007 | Expired or cancelled expired Apr 2009 | 900 Ashbury St | interior remodel@unit#2/ remodel kitchen-1st floor/two bathrooms 2nd floor/add new headers @ 1st and 2nd floor/reconfigure non-load bearing partitions/replace in kind windoows @ street face/create new window openings @ rear.Details
interior remodel@unit#2/ remodel kitchen-1st floor/two bathrooms 2nd floor/add new headers @ 1st and 2nd floor/reconfigure non-load bearing partitions/replace in kind windoows @ street face/create new window openings @ rear. | $127,500 |
| Feb 23, 2006 | Completed final sign-off Apr 2007 | 1039 Cole St | horizontal extension at upper level of a new family room(190 sf)over an extg kchn minor interior remodel including 1 bathrooms and creation of a new powder room on main level (addition of 10 sf)deck at rear is replaced with new enlarged deck.Details
horizontal extension at upper level of a new family room(190 sf)over an extg kchn minor interior remodel including 1 bathrooms and creation of a new powder room on main level (addition of 10 sf)deck at rear is replaced with new enlarged deck. | $95,000 |
| May 30, 2003 | Completed final sign-off Oct 2003 | 1848 Pine St | remodel master suite includes (e) bathroom, reconstruct sitting room to create wardrobe area,Details
remodel master suite includes (e) bathroom, reconstruct sitting room to create wardrobe area, | $150,000 |