Back to kitchen remodel contractors
Arrow Construction & Remodeling
- Based in
- Novato
- On San Francisco permits
- Feb 2010 to May 2026
- Last 24 months
- 3 permits filed
22 permits since 2000: 16 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 354 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 6, 2025 | In progress issued Jun 2025 | 2750 Vallejo St | interior cosmetic remodel: kitchen, primary bathroom, powder room and relocating wet bar at the top flDetails
interior cosmetic remodel: kitchen, primary bathroom, powder room and relocating wet bar at the top fl | $450,000 |
| Jan 10, 2022 | Completed final sign-off Jul 2022 | 2614 Jackson St | replace kitchen cabinets, counter top & appliances. no wall to be altered or moved, no structural to be touched. same layout on new kitchen cabinets. remodel in kind.Details
replace kitchen cabinets, counter top & appliances. no wall to be altered or moved, no structural to be touched. same layout on new kitchen cabinets. remodel in kind. | $50,000 |
| Jun 11, 2021 | Completed final sign-off Jul 2024 | 663 Marina Bl | remodel of (e) kitchen.Details
remodel of (e) kitchen. | $240,000 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 1973 Filbert St | interior remodel of existing kitchen, family room, pantry, master bathroom, master closets, and bar with new lighting at areas of work. no exterior or structural work.Details
interior remodel of existing kitchen, family room, pantry, master bathroom, master closets, and bar with new lighting at areas of work. no exterior or structural work. | $185,000 |
| Jun 11, 2014 | Completed final sign-off Jun 2015 | 765 Market St | interior remodel: non structural, kitchen and bathroom remodel with new fixtures & finishes, no bearing walls removal.Details
interior remodel: non structural, kitchen and bathroom remodel with new fixtures & finishes, no bearing walls removal. | $165,000 |
| Feb 20, 2014 | Completed final sign-off Jul 2014 | 415 Edna St | kitchen renovation in rectory. replace cabinetry, appliances. upgrade electrical to current building codeDetails
kitchen renovation in rectory. replace cabinetry, appliances. upgrade electrical to current building code | $10,000 |
| Mar 29, 2010 | Completed final sign-off Mar 2011 | 170 Pacific Av | replace appliances in kitchen. new stove needs gas vs. electricity. run new gas line & rewire from 220 to 110 for new stoveDetails
replace appliances in kitchen. new stove needs gas vs. electricity. run new gas line & rewire from 220 to 110 for new stove | $20,000 |