Back to bathroom remodel contractors
Arrow Construction & Remodeling
- Based in
- Novato
- On San Francisco permits
- Feb 2010 to May 2026
- Last 24 months
- 3 permits filed
22 permits since 2000: 16 completed, 2 in progress, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
7 bathroom remodel permits: 3 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 364 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 13, 2026 | In progress issued May 2026 | 2750 Vallejo St | repair 4 shower pans that are damaged and leaking. total of 4 bathrooms. all work like for like.Details
repair 4 shower pans that are damaged and leaking. total of 4 bathrooms. all work like for like. | $125,250 |
| Jul 22, 2025 | Completed final sign-off Mar 2026 | 2614 Jackson St | cosmetic renovation of three bathrooms. no walls will be moved or altered.Details
cosmetic renovation of three bathrooms. no walls will be moved or altered. | $175,000 |
| Jun 6, 2025 | In progress issued Jun 2025 | 2750 Vallejo St | interior cosmetic remodel: kitchen, primary bathroom, powder room and relocating wet bar at the top flDetails
interior cosmetic remodel: kitchen, primary bathroom, powder room and relocating wet bar at the top fl | $450,000 |
| Dec 15, 2020 | Completed final sign-off Jul 2024 | 663 Marina Bl | remodel of existing master bathroom and wardrobe. relocate existing non-structural interior wall in that area.Details
remodel of existing master bathroom and wardrobe. relocate existing non-structural interior wall in that area. | $180,000 |
| Jul 13, 2020 | Never finaled issued Jul 2020, no final | 1973 Filbert St | interior remodel of existing kitchen, family room, pantry, master bathroom, master closets, and bar with new lighting at areas of work. no exterior or structural work.Details
interior remodel of existing kitchen, family room, pantry, master bathroom, master closets, and bar with new lighting at areas of work. no exterior or structural work. | $185,000 |
| Nov 13, 2014 | Expired or cancelled expired Feb 2017 | 1501 Filbert St | interior remodel: master bath remodel, no structural work to be done, new plumbing fixtures & cabinetry, also new tile work as per plans, exh fan @ bathrm to remain, (e) led lights to remainDetails
interior remodel: master bath remodel, no structural work to be done, new plumbing fixtures & cabinetry, also new tile work as per plans, exh fan @ bathrm to remain, (e) led lights to remain | $50,000 |
| Jun 11, 2014 | Completed final sign-off Jun 2015 | 765 Market St | interior remodel: non structural, kitchen and bathroom remodel with new fixtures & finishes, no bearing walls removal.Details
interior remodel: non structural, kitchen and bathroom remodel with new fixtures & finishes, no bearing walls removal. | $165,000 |