Back to kitchen remodel contractors
Ariana Construction
- Based in
- Fremont
- On San Francisco permits
- Mar 2014 to Jun 2026
- Last 24 months
- 1 permit filed
48 permits since 2000: 38 completed, 2 in progress, 8 never finaled.
Of the 8 never-finaled permits, 4 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
36 kitchen remodel permits: 28 completed, 2 in progress, 6 never finaled. Typically 0 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 4, 2026 | In progress issued Jun 2026 | 1388 Gough St | unit 406: remove and preplace kitchen cabinets only, like for like.Details
unit 406: remove and preplace kitchen cabinets only, like for like. | $7,700 |
| Sep 10, 2024 | In progress issued Sep 2024 | 2578 46th Av | remove and replace kitchen cabinets only like for like. no structural work no change to layout. reuse existing appliances and fixtures; no other work.Details
remove and replace kitchen cabinets only like for like. no structural work no change to layout. reuse existing appliances and fixtures; no other work. | $4,000 |
| Feb 28, 2024 | Completed final sign-off Nov 2024 | 530 College Av | remove & replace kitchen cabinets like for like. no structural work. no change to floor layout. no change to wall layout.Details
remove & replace kitchen cabinets like for like. no structural work. no change to floor layout. no change to wall layout. | $5,882 |
| Mar 18, 2019 | Completed final sign-off Jul 2019 | 346 Chenery St | kitchen remodel which includes removing a load bear wall.Details
kitchen remodel which includes removing a load bear wall. | $35,000 |
| Mar 6, 2019 | Completed final sign-off Jul 2019 | 348 Chenery St | kitchen remodel - cabinets, newtile, appliances, hood, can lights, move panel, light switches, electrical outlets. hallway bathroom remodel 0 like for like - replace tub, tile flooring, vanity, light, fan). master bath - toilet, tile, vanity & lights, fan, changing bath to tub.Details
kitchen remodel - cabinets, newtile, appliances, hood, can lights, move panel, light switches, electrical outlets. hallway bathroom remodel 0 like for like - replace tub, tile flooring, vanity, light, fan). master bath - toilet, tile, vanity & lights, fan, changing bath to tub. | $45,000 |
| Nov 19, 2018 | Completed final sign-off Mar 2019 | 27 Edinburgh St | remodel kitchen, like for like, elctrical plumbing upgrades. drywall, iinstall cabinets, floor, paint, countertops.Details
remodel kitchen, like for like, elctrical plumbing upgrades. drywall, iinstall cabinets, floor, paint, countertops. | $20,000 |
| Sep 12, 2018 | Never finaled issued Sep 2018, no final | 120 Topeka Av | remodel kitchen in kind. bring electrical and plumbing to code.Details
remodel kitchen in kind. bring electrical and plumbing to code. | $20,000 |
| Jun 14, 2018 | Never finaled issued Jun 2018, no final | 4096 17th St | kitchen cabinets remodeling, upgrade switches and plugs in the kitchen only. in kindDetails
kitchen cabinets remodeling, upgrade switches and plugs in the kitchen only. in kind | $30,000 |
| May 10, 2018 | Completed final sign-off Sep 2018 | 3521 Pierce St | kitchen remodeling like for like, electrical, plumbing cabinet floor drywall, paint. no structural work - no wall modification.Details
kitchen remodeling like for like, electrical, plumbing cabinet floor drywall, paint. no structural work - no wall modification. | $20,000 |
| Jan 29, 2018 | Completed final sign-off Jun 2018 | 1099 23rd St | kitchen remodel like for like. ele/p;m, drywall paint cabinets. no alteration at wall window and door maher naDetails
kitchen remodel like for like. ele/p;m, drywall paint cabinets. no alteration at wall window and door maher na | $1,840 |
| Dec 14, 2017 | Completed final sign-off Jan 2019 | 1021 Excelsior Av | kitchen remodel, like for like. plumbing, electrical, up grade service 125amp, cabinets, appliances, flooring, drywall, paint, insulation.Details
kitchen remodel, like for like. plumbing, electrical, up grade service 125amp, cabinets, appliances, flooring, drywall, paint, insulation. | $18,785 |
| Oct 19, 2017 | Completed final sign-off Apr 2018 | 3845 21st St | kitchen remodel likefor like electrical appliances drywall, paint cabinet, countertop, lighting switch and outlet. finish plumbing. no change in wall and opening layout.Details
kitchen remodel likefor like electrical appliances drywall, paint cabinet, countertop, lighting switch and outlet. finish plumbing. no change in wall and opening layout. | $18,945 |
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 1998 Broadway | #402 - kitchen remodel ;; like for like. cabinet, floor stay appliance electrical plumbing and paint.Details
#402 - kitchen remodel ;; like for like. cabinet, floor stay appliance electrical plumbing and paint. | $18,985 |
| Sep 5, 2017 | Completed final sign-off Feb 2018 | 4958 17th St | kitchen remodel, like per like.Details
kitchen remodel, like per like. | $19,895 |
| Jul 24, 2017 | Completed final sign-off Dec 2017 | 1001 Geneva Av | kitchen remodel like-per-likeDetails
kitchen remodel like-per-like | $11,846 |
| Jul 11, 2017 | Completed final sign-off Nov 2017 | 222 Precita Av | kitchen remodel like for like. rewire kitchen outlets, switches, led lights, drywall and new cabinetDetails
kitchen remodel like for like. rewire kitchen outlets, switches, led lights, drywall and new cabinet | $21,500 |
| Mar 31, 2017 | Completed final sign-off Sep 2017 | 2318 Santiago St | kitchen remodel like-per-likeDetails
kitchen remodel like-per-like | $12,846 |
| Jun 2, 2016 | Never finaled issued Aug 2016, no final | 449 Panorama Dr | demo existing kitchen, install new cabinets, lighting, skylight, switches, outlets, plumbing, range hood. remove non loadbearing wall create passthrough in another wall.Details
demo existing kitchen, install new cabinets, lighting, skylight, switches, outlets, plumbing, range hood. remove non loadbearing wall create passthrough in another wall. | $20,000 |
| May 16, 2016 | Never finaled issued May 2016, no final | 32 Sanchez St | kitchen remodel . no walls moved, removed added or infilled. all (e) layouts to remain unchanged.Details
kitchen remodel . no walls moved, removed added or infilled. all (e) layouts to remain unchanged. | $18,000 |
| May 6, 2015 | Completed final sign-off Apr 2016 | 1591 Jackson St | bathroom and kitchen remodel, like for likeDetails
bathroom and kitchen remodel, like for like | $30,470 |
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 1930 Hayes St | kitchen remodeling only cabinet installation 10x9 (90 sq.ft.)Details
kitchen remodeling only cabinet installation 10x9 (90 sq.ft.) | $21,520 |
| Dec 29, 2014 | Completed final sign-off May 2015 | 55 Red Rock Wy | kitchen and bath remodeling. no structural work to be done. no doors, windows, and walls under this scope.Details
kitchen and bath remodeling. no structural work to be done. no doors, windows, and walls under this scope. | $19,000 |
| Dec 16, 2014 | Completed final sign-off Oct 2015 | 1270 Vermont St | kitchen & bath remodeling. no walls to remove.Details
kitchen & bath remodeling. no walls to remove. | $22,640 |
| Dec 16, 2014 | Completed final sign-off Jan 2016 | 209 Theresa St | kitchen remodeling in the rear unit. no walls to remove.Details
kitchen remodeling in the rear unit. no walls to remove. | $16,965 |
| Nov 20, 2014 | Completed final sign-off Dec 2014 | 362 Sanchez St | one kitchen remodel. non-structural.Details
one kitchen remodel. non-structural. | $9,000 |
| Oct 1, 2014 | Completed final sign-off Jun 2015 | 314 Victoria St | remodel kitchen, - plumbing electrical , cabinet and countertop; to comply with cec150.0(k)3Details
remodel kitchen, - plumbing electrical , cabinet and countertop; to comply with cec150.0(k)3 | $10,227 |
| Aug 15, 2014 | Completed final sign-off Jan 2015 | 614 San Bruno Av | one kitchen remodeling, electrical and plumbing. no alteration of walls, window and door. n/a maher ordinance 3 155-13Details
one kitchen remodeling, electrical and plumbing. no alteration of walls, window and door. n/a maher ordinance 3 155-13 | $16,575 |
| Jul 7, 2014 | Completed final sign-off Jun 2015 | 65 Beaumont Av | kitchen remodel. no change in wallsDetails
kitchen remodel. no change in walls | $16,576 |
| Jul 7, 2014 | Completed final sign-off Jun 2015 | 445 Ortega St | kitchen remodel. no change in wallsDetails
kitchen remodel. no change in walls | $18,000 |
| May 28, 2014 | Completed final sign-off Sep 2014 | 84 Geneva Av | kitchen remodel like per likeDetails
kitchen remodel like per like | $16,890 |
| May 27, 2014 | Completed final sign-off Oct 2014 | 1579 44th Av | 1)kitchen remodeling like for like. lighting and control per ceg 150. 2)installing 2 windows in kitchen. not visible from street.Details
1)kitchen remodeling like for like. lighting and control per ceg 150. 2)installing 2 windows in kitchen. not visible from street. | $16,585 |
| May 27, 2014 | Completed final sign-off Aug 2014 | 945 Corbett Av | kitchen remodeling like per like. only at unit #208. lighting and control per ceg 150 kDetails
kitchen remodeling like per like. only at unit #208. lighting and control per ceg 150 k | $9,895 |
| May 8, 2014 | Completed final sign-off Jan 2015 | 2011 Thomas Av | remodel kitchen cabinets.Details
remodel kitchen cabinets. | $13,675 |
| Apr 22, 2014 | Completed final sign-off Aug 2014 | 373 Lombard St | kitchen remodel, plumbing, electrical (like for like)Details
kitchen remodel, plumbing, electrical (like for like) | $13,500 |
| Apr 21, 2014 | Completed final sign-off Jul 2014 | 720 Fell St | kitchen remodeling like per like, no walls moved, removed or added. all fixture layouts to remain the same.Details
kitchen remodeling like per like, no walls moved, removed or added. all fixture layouts to remain the same. | $13,560 |
| Apr 1, 2014 | Completed final sign-off May 2014 | 175 Red Rock Wy | kitchen remodel. new cabinet, new counter. no change in wall & opening layout. min 50% wall frame to be high efficacy lighting. connect to (e) duct.Details
kitchen remodel. new cabinet, new counter. no change in wall & opening layout. min 50% wall frame to be high efficacy lighting. connect to (e) duct. | $12,000 |