Back to bathroom remodel contractors
Ariana Construction
- Based in
- Fremont
- On San Francisco permits
- Mar 2014 to Jun 2026
- Last 24 months
- 1 permit filed
48 permits since 2000: 38 completed, 2 in progress, 8 never finaled.
Of the 8 never-finaled permits, 4 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 9 completed, 1 never finaled. Typically 0 days from filing to permit and 71 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 6, 2019 | Completed final sign-off Jul 2019 | 348 Chenery St | kitchen remodel - cabinets, newtile, appliances, hood, can lights, move panel, light switches, electrical outlets. hallway bathroom remodel 0 like for like - replace tub, tile flooring, vanity, light, fan). master bath - toilet, tile, vanity & lights, fan, changing bath to tub.Details
kitchen remodel - cabinets, newtile, appliances, hood, can lights, move panel, light switches, electrical outlets. hallway bathroom remodel 0 like for like - replace tub, tile flooring, vanity, light, fan). master bath - toilet, tile, vanity & lights, fan, changing bath to tub. | $45,000 |
| Jul 18, 2018 | Completed final sign-off Aug 2018 | 2425 Market St | unit 6: (1) bathroom remodel, like-per-like, maintain accessible height & clearancesDetails
unit 6: (1) bathroom remodel, like-per-like, maintain accessible height & clearances | $12,876 |
| Jul 24, 2017 | Completed final sign-off Sep 2017 | 348 Church St | bathroom remodel like-per-likeDetails
bathroom remodel like-per-like | $12,841 |
| Jul 20, 2017 | Completed final sign-off Sep 2017 | 328 Thornton Av | bathroom remodel like for like. flooring & drywall paint.Details
bathroom remodel like for like. flooring & drywall paint. | $10,000 |
| Nov 2, 2015 | Completed final sign-off Dec 2015 | 1886 21st Av | bathroom remodel - like for like 6.5 x 9.5Details
bathroom remodel - like for like 6.5 x 9.5 | $18,000 |
| May 6, 2015 | Completed final sign-off Apr 2016 | 1591 Jackson St | bathroom and kitchen remodel, like for likeDetails
bathroom and kitchen remodel, like for like | $30,470 |
| Apr 21, 2015 | Completed final sign-off Jul 2015 | 325 Berry St | one bathroom remodel, like-for-like. compliance with maher ordinance no 155-13 not required.Details
one bathroom remodel, like-for-like. compliance with maher ordinance no 155-13 not required. | $10,000 |
| Dec 29, 2014 | Completed final sign-off May 2015 | 55 Red Rock Wy | kitchen and bath remodeling. no structural work to be done. no doors, windows, and walls under this scope.Details
kitchen and bath remodeling. no structural work to be done. no doors, windows, and walls under this scope. | $19,000 |
| Dec 16, 2014 | Completed final sign-off Oct 2015 | 1270 Vermont St | kitchen & bath remodeling. no walls to remove.Details
kitchen & bath remodeling. no walls to remove. | $22,640 |
| Mar 19, 2014 | Never finaled issued Mar 2014, no final | 751 Goettingen St | bathroom: instal faucet, shower pan, shower valve, toilet, new piping outlet detach & reset. replace in-kind. all (n) lights shall be hi efficcacy, provide (n) exhaust fan w/humid/stat, & vent to outside, min 3' from property line & building openings.Details
bathroom: instal faucet, shower pan, shower valve, toilet, new piping outlet detach & reset. replace in-kind. all (n) lights shall be hi efficcacy, provide (n) exhaust fan w/humid/stat, & vent to outside, min 3' from property line & building openings. | $8,775 |