Block 0567, lot 038
1998 Broadway
- City’s use
- Single Family Residential
- Built
- 1964
- Stories
- 1
- Units
- 1
- Rooms
- 1 bedroom, 2 bathrooms
- Building
- 1,035 sq ft
- Zoning
- RM2
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
14 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 26, 2019 | Never finaled issued Mar 2019, no final | 1998 Broadway | Etna Enterprises | street spaceDetails
street space | |
| Sep 14, 2017 | Never finaled issued Sep 2017, no final | 1998 Broadway | Ariana Construction | #402 - kitchen remodel ;; like for like. cabinet, floor stay appliance electrical plumbing and paint.Details
#402 - kitchen remodel ;; like for like. cabinet, floor stay appliance electrical plumbing and paint. | $18,985 |
| May 14, 2013 | Completed final sign-off May 2013 | 1998 Broadway | Fisher Development Inc | to obtain final inspection for work approved under pa#201002226912. all work is complete.Details
to obtain final inspection for work approved under pa#201002226912. all work is complete. | |
| Jul 25, 2012 | Completed final sign-off Oct 2012 | 1998 Broadway | Gil Construction & Assoc Inc. | remove and replace 12 areas of shetrock 8'x8' for garbage chute @ common area 5/8 type x gypsum required.Details
remove and replace 12 areas of shetrock 8'x8' for garbage chute @ common area 5/8 type x gypsum required. | $9,600 |
| Aug 1, 2008 | Never finaled issued Aug 2008, no final | 1998 Broadway | street space & sidewalk permit only.Details
street space & sidewalk permit only. | ||
| Mar 14, 2008 | Completed final sign-off Apr 2008 | 1998 Broadway | remove a portion of the wall between the kitchen and living rm in unit# 707 on the 7th floor allow more natural light into the kitchen.Details
remove a portion of the wall between the kitchen and living rm in unit# 707 on the 7th floor allow more natural light into the kitchen. | $2,500 | |
| Dec 6, 2007 | Expired or cancelled expired Jul 2009 | 1998 Broadway | Flmc Development Corp Dba Adamo Campagna | work @ unit# 1106 only. replace in kind. 1 kitchen & 2 bathrooms. replace kitchen with new cabinets & new appliances. add lighting & bring up to code electrically. replace 2 bathrooms with new tile & bring electrical & plumging up to code.Details
work @ unit# 1106 only. replace in kind. 1 kitchen & 2 bathrooms. replace kitchen with new cabinets & new appliances. add lighting & bring up to code electrically. replace 2 bathrooms with new tile & bring electrical & plumging up to code. | $30,000 |
| Nov 8, 2007 | Expired or cancelled cancelled Jan 2026 | 1998 Broadway | addition of 2 smoke detectors,3 heat detectors and 3 manual alarms to the existing system in garage levels 1,2 and 3.Details
addition of 2 smoke detectors,3 heat detectors and 3 manual alarms to the existing system in garage levels 1,2 and 3. | $9,000 | |
| Aug 27, 2007 | Never finaled issued Aug 2007, no final | 1998 Broadway | Standardconstr/Standardroof | reroofingDetails
reroofing | $22,800 |
| Sep 17, 2004 | Completed final sign-off Nov 2004 | 1998 Broadway | Gates Renovation Inc | install new cabinets and appliances in kchn/install new tile and vanity in 3 bthrm in #605Details
install new cabinets and appliances in kchn/install new tile and vanity in 3 bthrm in #605 | $10,000 |
| Jul 20, 2004 | Completed final sign-off Aug 2004 | 1998 Broadway | Carson Construction | repalce tile, plumbing fixture, cabinety and update outlet @ 6th fl in all 3 bathrooms in structureDetails
repalce tile, plumbing fixture, cabinety and update outlet @ 6th fl in all 3 bathrooms in structure | $35,000 |
| Aug 20, 2003 | Expired or cancelled expired Jan 2007 | 1998 Broadway | Metropolitan Electrical Construction | life safety upgrade for elevator equipment (1) smsoke in lobby ist floor for alt. recallDetails
life safety upgrade for elevator equipment (1) smsoke in lobby ist floor for alt. recall | $3,255 |
| Nov 25, 2002 | Completed final sign-off Feb 2003 | 1998 Broadway | Michael Wines Construction | install fire panel and fill sheetrock holes in hallwaysDetails
install fire panel and fill sheetrock holes in hallways | $4,500 |
| Jul 17, 2001 | Completed final sign-off May 2002 | 1998 Broadway | interior alterations to existing condominium in high rise bldg. no structural work. remodel kitchen,Details
interior alterations to existing condominium in high rise bldg. no structural work. remodel kitchen, | $45,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.