Gates Renovation Inc
- Based in
- San Francisco
- On San Francisco permits
- Jul 2002 to Dec 2009
- Last 24 months
- 0 permits filed
38 permits since 2000: 34 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2009 | Completed final sign-off Jan 2010 | 625 Dolores St | install 2" underground dedicated water line for fire sprinkler system. fire sprinkler system installed under app# 2009 0306 4951Details
install 2" underground dedicated water line for fire sprinkler system. fire sprinkler system installed under app# 2009 0306 4951 | $2,000 |
| Aug 6, 2009 | Completed final sign-off Dec 2009 | 2254 Pacific Av | remodel existing kitchen: new cabinets & new fixtures. upgrade plumbing & electrical.Details
remodel existing kitchen: new cabinets & new fixtures. upgrade plumbing & electrical. | $32,000 |
| Jun 25, 2009 | Completed final sign-off Jan 2010 | 870 32nd Av | replace windows at front facade with new double paned low-e alum. clad windows. transoms to remain.Details
replace windows at front facade with new double paned low-e alum. clad windows. transoms to remain. | $3,500 |
| Jun 22, 2009 | Completed final sign-off Jan 2010 | 870 32nd Av | renovation of (e) 1st/grg floor for new guest rm, full bath and exercise rm. remove wall btn kitchen and sun rm; new master bath , reno of children's bath, infill light well, new windows at front and rear of bldg.Details
renovation of (e) 1st/grg floor for new guest rm, full bath and exercise rm. remove wall btn kitchen and sun rm; new master bath , reno of children's bath, infill light well, new windows at front and rear of bldg. | $75,000 |
| Jun 17, 2009 | Completed final sign-off Dec 2009 | 2254 Pacific Av | demo existing kitchen, upgrade existing electrical service to building bring new sub panel to upper unit, upgrade upper unit electrical to bedrooms no structural. no lighting work.Details
demo existing kitchen, upgrade existing electrical service to building bring new sub panel to upper unit, upgrade upper unit electrical to bedrooms no structural. no lighting work. | $15,000 |
| Oct 31, 2008 | Completed final sign-off Jul 2009 | 2308 Filbert St | addition of a 3/4 bath in space previously occupied by walk-in closetDetails
addition of a 3/4 bath in space previously occupied by walk-in closet | $12,000 |
| Sep 17, 2008 | Completed final sign-off Dec 2008 | 1020 Union St | work @ unit# 1 only. remodel existing 3/4 bath. new fixtures, shower pan, tile, other finishes.Details
work @ unit# 1 only. remodel existing 3/4 bath. new fixtures, shower pan, tile, other finishes. | $12,000 |
| Sep 17, 2008 | Completed final sign-off Jul 2009 | 2308 Filbert St | remodel existing 1 kitchen, 1 bath at existing locations. new electrical, plumbing, finishes & fixtures. no new wall, windows or doors.Details
remodel existing 1 kitchen, 1 bath at existing locations. new electrical, plumbing, finishes & fixtures. no new wall, windows or doors. | $70,000 |
| Jun 20, 2008 | Completed final sign-off May 2009 | 1250 Jones St | work @ unit# 603 only. remodel (e) kitchen & bath. new cabinets, tile, fixtures & appliances. updated plumbing & electrical. lighting has to meet title 24.Details
work @ unit# 603 only. remodel (e) kitchen & bath. new cabinets, tile, fixtures & appliances. updated plumbing & electrical. lighting has to meet title 24. | $98,000 |
| Mar 20, 2008 | Completed final sign-off Mar 2008 | 566 08th Av | renew permit application # 200708311472 for final inspection onlyDetails
renew permit application # 200708311472 for final inspection only | |
| Nov 8, 2007 | Completed final sign-off Feb 2008 | 215 Juanita Wy | kitchen remodel. new cabinets & appliances & lighting. lighting will comply with title 24.Details
kitchen remodel. new cabinets & appliances & lighting. lighting will comply with title 24. | $30,000 |
| Sep 14, 2007 | Expired or cancelled expired Nov 2018 | 3702 22nd St | stair reapir at front , less than 50%Details
stair reapir at front , less than 50% | $7,500 |
| Aug 31, 2007 | Expired or cancelled expired Mar 2008 | 566 08th Av | repair and/or raplace 2nd floordeck landing & stairs,less 50%, no change to size or location of existing, deck & stairs and joist hangers, replace dryrot, reinforse hand rails & posts to cope. replace in kind.Details
repair and/or raplace 2nd floordeck landing & stairs,less 50%, no change to size or location of existing, deck & stairs and joist hangers, replace dryrot, reinforse hand rails & posts to cope. replace in kind. | $5,000 |
| Aug 29, 2007 | Completed final sign-off Feb 2008 | 129 Commonwealth Av | remodel extg kchn - new cabinets, counter tops, flooring.51% wattage lumens to be flourescent. revision to app #200706154115Details
remodel extg kchn - new cabinets, counter tops, flooring.51% wattage lumens to be flourescent. revision to app #200706154115 | $50,000 |
| Jun 15, 2007 | Never finaled issued Jun 2007, no final | 129 Commonwealth Av | remodel (e) master suite, replace (e0 island in kitchen/family room, remove storage room in family room. remodel (e) 3-fixture bath to 4-fixture . reconfigure walk in closet. electrical work associated with island brought uop to current code.Details
remodel (e) master suite, replace (e0 island in kitchen/family room, remove storage room in family room. remodel (e) 3-fixture bath to 4-fixture . reconfigure walk in closet. electrical work associated with island brought uop to current code. | $120,000 |
| Mar 16, 2007 | Completed final sign-off Jul 2007 | 1115 Greenwich St | work to be done at unit 1115 greenwich only) remodel library to match trim in living, dining rooms, refinish floors, add grounded outlets, new cabinetry, remove h2o lines in wall as needed.Details
work to be done at unit 1115 greenwich only) remodel library to match trim in living, dining rooms, refinish floors, add grounded outlets, new cabinetry, remove h2o lines in wall as needed. | $27,000 |
| Sep 7, 2006 | Completed final sign-off May 2007 | 1543 Willard St | remodel of (1) kitchen, powder room, 2 bathrooms, closets, re partition, non structural work, non bearing closet walls to be removed.Details
remodel of (1) kitchen, powder room, 2 bathrooms, closets, re partition, non structural work, non bearing closet walls to be removed. | $83,000 |
| Aug 1, 2006 | Completed final sign-off Apr 2007 | 1020 Union St | remodel existing kitchen and master bathroom. replace master bedroom ceiling. no structural changes, work to unit 1Details
remodel existing kitchen and master bathroom. replace master bedroom ceiling. no structural changes, work to unit 1 | $70,000 |
| Jul 13, 2006 | Completed final sign-off Sep 2007 | 275 Jersey St | removal of non-structural elements in both units (ie. cabinets, fixtures, etc). 2 kitchens & 2 bathrooms will remain useable. pending new remodel plans.Details
removal of non-structural elements in both units (ie. cabinets, fixtures, etc). 2 kitchens & 2 bathrooms will remain useable. pending new remodel plans. | $1,500 |
| Jul 5, 2006 | Completed final sign-off Oct 2006 | 32 Clayton St | remodel split bathroom by adding a sink. replacing tub, sink, toilet, flooring in the other bathroom. no structural work. lighting changes to comply with title 24.Details
remodel split bathroom by adding a sink. replacing tub, sink, toilet, flooring in the other bathroom. no structural work. lighting changes to comply with title 24. | $32,000 |
| Apr 20, 2006 | Completed final sign-off Dec 2006 | 1080 Chestnut St | remodel (e) kitchen, master bath + 1/2 bath. replace flooring , plumbing fixtures, new cabinets. replace tub with walk in shower. sprinklers under sep permit if needed. kitchen + bath all flourescent only. other rooms/non air tight recessed cans okay.Details
remodel (e) kitchen, master bath + 1/2 bath. replace flooring , plumbing fixtures, new cabinets. replace tub with walk in shower. sprinklers under sep permit if needed. kitchen + bath all flourescent only. other rooms/non air tight recessed cans okay. | $83,000 |
| Apr 13, 2006 | Completed final sign-off May 2006 | 566 08th Av | replace drain in garage /alley. tie into sewer at sidewalk.Details
replace drain in garage /alley. tie into sewer at sidewalk. | $5,000 |
| Mar 23, 2006 | Completed final sign-off May 2006 | 2108 California St | (work performed in unit# 2110 only.) remove doors from passage ways between entry, living room, dining room & kitchen. replace casing with dry wall, fill-in corners with archways. (remove doors from a total of 3 passageways) no structural work.Details
(work performed in unit# 2110 only.) remove doors from passage ways between entry, living room, dining room & kitchen. replace casing with dry wall, fill-in corners with archways. (remove doors from a total of 3 passageways) no structural work. | $2,000 |
| Mar 9, 2006 | Completed final sign-off Mar 2006 | 2136 Steiner St | remove dry wall, lath & plaster & cabinets from walls & ceilings of upper unit & garage to prepare for major remodel that includes seismic strengthing will submit soon.Details
remove dry wall, lath & plaster & cabinets from walls & ceilings of upper unit & garage to prepare for major remodel that includes seismic strengthing will submit soon. | $1,500 |
| Feb 23, 2006 | Completed final sign-off May 2006 | 1200 California St | remodel (e) bathroom-new tile, cabinets, plumbing + electrical fixtures non structural.Details
remodel (e) bathroom-new tile, cabinets, plumbing + electrical fixtures non structural. | $18,000 |
| Jan 23, 2006 | Completed final sign-off May 2006 | 1267 Noe St | remodel (e) kitchen with same layout. new cabinets, fixtures, flooring & countertops. new lighting. all new lighting to be flourecent.Details
remodel (e) kitchen with same layout. new cabinets, fixtures, flooring & countertops. new lighting. all new lighting to be flourecent. | $22,000 |
| Jan 5, 2006 | Completed final sign-off Apr 2006 | 2724 Baker St | re-stucco lower half of facade/paint exterior and common stairwell/install intercom and new light fixtures in common area/fill in plant cut outs against house in sidewalk/re-pour concrete on sidewalkDetails
re-stucco lower half of facade/paint exterior and common stairwell/install intercom and new light fixtures in common area/fill in plant cut outs against house in sidewalk/re-pour concrete on sidewalk | $8,500 |
| Oct 19, 2005 | Completed final sign-off Feb 2006 | 1080 Chestnut St | install new tile and vanity in master bthrm in unit 10b no lighting workDetails
install new tile and vanity in master bthrm in unit 10b no lighting work | $2,500 |
| Mar 25, 2005 | Completed final sign-off Sep 2005 | 585 Ortega St | remodel existing bath on 2nd floor, kitchen on 1st flr,replace cabinets, countertop,appliances, fixtDetails
remodel existing bath on 2nd floor, kitchen on 1st flr,replace cabinets, countertop,appliances, fixt | $40,000 |
| Sep 17, 2004 | Completed final sign-off Nov 2004 | 1998 Broadway | install new cabinets and appliances in kchn/install new tile and vanity in 3 bthrm in #605Details
install new cabinets and appliances in kchn/install new tile and vanity in 3 bthrm in #605 | $10,000 |
| Mar 15, 2004 | Completed final sign-off Jul 2004 | 3825 Cesar Chavez St | voluntary foundation upgrade/sister new 2x8 joists to extg 2x6/add new joistsDetails
voluntary foundation upgrade/sister new 2x8 joists to extg 2x6/add new joists | $24,000 |
| Feb 3, 2004 | Completed final sign-off Jun 2004 | 627 Dolores St | move partition wall between 2 rooms, renovate kitchen with new cabinet appliancesDetails
move partition wall between 2 rooms, renovate kitchen with new cabinet appliances | $3,000 |
| Dec 8, 2003 | Completed final sign-off Jan 2004 | 88 Whitney St | install fold-down attic stairs. install plywood in attic for storage. install hardwood flooring &Details
install fold-down attic stairs. install plywood in attic for storage. install hardwood flooring & | $3,300 |
| Nov 17, 2003 | Completed final sign-off Nov 2003 | 39 Deming St | repair dry-rot below bay-replace rim joists reattach deck ledger board.Details
repair dry-rot below bay-replace rim joists reattach deck ledger board. | $1,000 |
| Nov 12, 2003 | Expired or cancelled expired May 2004 | 39 Tingley St | repair dryrot below bay. replace rim joists,reattach deck ledger board.Details
repair dryrot below bay. replace rim joists,reattach deck ledger board. | $1,000 |
| Sep 30, 2003 | Completed final sign-off Dec 2003 | 39 Tingley St | repair front, exterior stair in kind, repair work in less tha 50%Details
repair front, exterior stair in kind, repair work in less tha 50% | $2,000 |
| Jul 28, 2003 | Completed final sign-off Dec 2003 | 84 Whitney St | alterations to (e) house & rear addition. rev#200112135202.minor revisions to bathrooms, kitchen layDetails
alterations to (e) house & rear addition. rev#200112135202.minor revisions to bathrooms, kitchen lay | $1,000 |
| Jul 17, 2002 | Completed final sign-off Sep 2002 | 45 Deming St | rmv exist porch rf due to wtr damage. wood frame plantr box/stair run w 5 risers,wd prch overhng,pavDetails
rmv exist porch rf due to wtr damage. wood frame plantr box/stair run w 5 risers,wd prch overhng,pav | $7,100 |