Back to kitchen remodel contractors
Anthony Sachelli Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Apr 2026
- Last 24 months
- 1 permit filed
37 permits since 2000: 36 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 9 completed, 1 never finaled. Typically 0 days from filing to permit and 77 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 22, 2026 | Completed final sign-off May 2026 | 681 Paris St | to comply with nov##202650683, repair front stairs in-kind for dryrot, less than 50% paint siding, replace back door, recaulk tub/enclosure, vent kitchen hood/repair (e) installation, front stair visible from street. exhaust termination shall comply with cmc 502.2.1.Details
to comply with nov##202650683, repair front stairs in-kind for dryrot, less than 50% paint siding, replace back door, recaulk tub/enclosure, vent kitchen hood/repair (e) installation, front stair visible from street. exhaust termination shall comply with cmc 502.2.1. | $13,000 |
| Dec 28, 2023 | Completed final sign-off Oct 2024 | 135 San Aleso Av | interior kitchen remodel, replace in-kind rear patio door, add new skylight, 2 new casement windows at 2/f kitchen, new lighting, electrical, plumbing in area of work. replace hvac with new heat pump. dryrot repair as required at ne corner and south wall.Details
interior kitchen remodel, replace in-kind rear patio door, add new skylight, 2 new casement windows at 2/f kitchen, new lighting, electrical, plumbing in area of work. replace hvac with new heat pump. dryrot repair as required at ne corner and south wall. | $45,000 |
| Feb 8, 2023 | Completed final sign-off Apr 2023 | 253 Mangels Av | in-kind remodeling of 1 kitchen(s) in 2nd flDetails
in-kind remodeling of 1 kitchen(s) in 2nd fl | $35,000 |
| Dec 1, 2022 | Completed final sign-off Apr 2023 | 317 Surrey St | kitchen remodel in-kind.Details
kitchen remodel in-kind. | $80,000 |
| Jun 27, 2022 | Completed final sign-off Sep 2022 | 2911 23rd Av | dry rot repair to kitchen and sunroom and garage and roof. kitchen remodel in kind. add lights to sunroom and patio. install subpanel. reduce skylight. replace three windows and patio door in kitchen and sunroom, not visible from street due to dryrot.Details
dry rot repair to kitchen and sunroom and garage and roof. kitchen remodel in kind. add lights to sunroom and patio. install subpanel. reduce skylight. replace three windows and patio door in kitchen and sunroom, not visible from street due to dryrot. | $140,000 |
| Oct 14, 2021 | Completed final sign-off Mar 2022 | 2691 Green St | remodel powder room & kitchen pantry. remove living room fireplace.Details
remodel powder room & kitchen pantry. remove living room fireplace. | $87,000 |
| Jun 11, 2021 | Never finaled issued Jun 2021, no final | 1144 Cole St | replace kitchen cabinets, counter top. minor dry rot repair at rear - not visible from street. no moving walls, like for like.Details
replace kitchen cabinets, counter top. minor dry rot repair at rear - not visible from street. no moving walls, like for like. | $22,000 |
| May 23, 2019 | Completed final sign-off Aug 2019 | 66 Crestlake Dr | remodel kitchen.Details
remodel kitchen. | $70,000 |
| Oct 10, 2018 | Completed final sign-off Dec 2018 | 230 Lakeview Av | remodel kitchen. no change of (e) floor plan.Details
remodel kitchen. no change of (e) floor plan. | $61,516 |
| Sep 27, 2017 | Completed final sign-off Dec 2018 | 785 Golden Gate Av | unit 205: interior remodel of (e) kitchen & bathroom in place. no changes to rought plumbing or exterior envelope. lighting and electrical in the area of work. remove (e) non-load bearing partitions.Details
unit 205: interior remodel of (e) kitchen & bathroom in place. no changes to rought plumbing or exterior envelope. lighting and electrical in the area of work. remove (e) non-load bearing partitions. | $25,000 |