Back to bathroom remodel contractors
Anthony Sachelli Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Jul 2014 to Apr 2026
- Last 24 months
- 1 permit filed
37 permits since 2000: 36 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 7 completed. Typically 0 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2019 | Completed final sign-off Mar 2020 | 348 Church St | remodel interior of owner's condo. replace countertops, fixtures, flooring. remodel bathroom. no changesDetails
remodel interior of owner's condo. replace countertops, fixtures, flooring. remodel bathroom. no changes | $49,888 |
| Oct 3, 2018 | Completed final sign-off Dec 2018 | 785 Golden Gate Av | revision to 201709279747. remove notation for e bath vent fan to remain. request that e operable window in bath be allowed for ventilation in lieu of mech fanDetails
revision to 201709279747. remove notation for e bath vent fan to remain. request that e operable window in bath be allowed for ventilation in lieu of mech fan | |
| Sep 27, 2017 | Completed final sign-off Dec 2018 | 785 Golden Gate Av | unit 205: interior remodel of (e) kitchen & bathroom in place. no changes to rought plumbing or exterior envelope. lighting and electrical in the area of work. remove (e) non-load bearing partitions.Details
unit 205: interior remodel of (e) kitchen & bathroom in place. no changes to rought plumbing or exterior envelope. lighting and electrical in the area of work. remove (e) non-load bearing partitions. | $25,000 |
| Aug 1, 2017 | Completed final sign-off Feb 2018 | 512 College Av | replace (4) windows facing backyard. not visible from street. downstairs bath. re-tile shower, perform minor dryrot repair to stucco at rear wall, repair in kind. same size, same location, max u fator 0.32Details
replace (4) windows facing backyard. not visible from street. downstairs bath. re-tile shower, perform minor dryrot repair to stucco at rear wall, repair in kind. same size, same location, max u fator 0.32 | $45,000 |
| Mar 9, 2017 | Completed final sign-off May 2017 | 200 Anderson St | amend pa# 201702088905. remodel bathroom, repair dryrot, move existing plumbing into walls where possible. replace window, no walls to be relocated.Details
amend pa# 201702088905. remodel bathroom, repair dryrot, move existing plumbing into walls where possible. replace window, no walls to be relocated. | $25,000 |
| Mar 26, 2015 | Completed final sign-off Jul 2015 | 230 Lakeview Av | interior remodle of (e) ground floor bathroom & bathroom. replace (e) plumbing fixtures & lighting in bathroom. replace rear sliding glass door with (n) patio doors. replace rear bathroom window. max u factor 0.32Details
interior remodle of (e) ground floor bathroom & bathroom. replace (e) plumbing fixtures & lighting in bathroom. replace rear sliding glass door with (n) patio doors. replace rear bathroom window. max u factor 0.32 | $21,500 |
| Aug 28, 2014 | Completed final sign-off Oct 2014 | 1531 Oak St | remodel bathroom, moving plumbing fixtures, and changing window with like.Details
remodel bathroom, moving plumbing fixtures, and changing window with like. | $20,000 |