Anova Build Inc

Contractor license
1113396
State license record
Based in
Alameda
On San Francisco permits
Jul 2023 to May 2026
Last 24 months
6 permits filed

12 permits since 2000: 10 completed, 2 in progress.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Stairs permits

AllStairs 1Kitchen remodel 4Bathroom remodel 5

1 stairs permit: 1 completed. Typically 0 days from filing to permit and 35 days from permit to final inspection.

FiledOutcomeAddressWork described on the permitDeclared cost
Dec 30, 2025Completed
final sign-off Feb 2026
2485 46th Avstairway system repair. remove and replace all rotted wood members with exterior grade lumber. all repairs will be performed in-kind, matching the existing stairway design and configuration. less than 50%.
Details
Permit
202512302991
Status
complete
Filed
Dec 30, 2025
Permit issued
Dec 30, 2025
Final sign-off
Feb 3, 2026
Declared cost
$15,000
Address
2485 46th Av

stairway system repair. remove and replace all rotted wood members with exterior grade lumber. all repairs will be performed in-kind, matching the existing stairway design and configuration. less than 50%.

Open the permit page

$15,000