Anova Build Inc
- Based in
- Alameda
- On San Francisco permits
- Jul 2023 to May 2026
- Last 24 months
- 6 permits filed
12 permits since 2000: 10 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
1 stairs permit: 1 completed. Typically 0 days from filing to permit and 35 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 30, 2025 | Completed final sign-off Feb 2026 | 2485 46th Av | stairway system repair. remove and replace all rotted wood members with exterior grade lumber. all repairs will be performed in-kind, matching the existing stairway design and configuration. less than 50%.Details
stairway system repair. remove and replace all rotted wood members with exterior grade lumber. all repairs will be performed in-kind, matching the existing stairway design and configuration. less than 50%. | $15,000 |