Anova Build Inc
- Based in
- Alameda
- On San Francisco permits
- Jul 2023 to May 2026
- Last 24 months
- 6 permits filed
12 permits since 2000: 10 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | In progress issued May 2026 | 145 Lomita Av | remodel in kind, remodel 3 bathrooms and 1 kitchen, install new vanities, bathtub, walk in shower tiles, light fixtures, and exhaust fans. install a new subpanel in the hallway. replace the existing cainetry, countertops and sink in the small room next to the kitchen on 2nd floor, replace carpetDetails
remodel in kind, remodel 3 bathrooms and 1 kitchen, install new vanities, bathtub, walk in shower tiles, light fixtures, and exhaust fans. install a new subpanel in the hallway. replace the existing cainetry, countertops and sink in the small room next to the kitchen on 2nd floor, replace carpet | $52,200 |
| Apr 6, 2026 | In progress issued Apr 2026 | 1882 41st Av | 1/f: remodel bathroom & convert family room to kitchennete per plan. repair and replace floor drain at rear yard.Details
1/f: remodel bathroom & convert family room to kitchennete per plan. repair and replace floor drain at rear yard. | $37,500 |
| Dec 30, 2025 | Completed final sign-off Feb 2026 | 2485 46th Av | stairway system repair. remove and replace all rotted wood members with exterior grade lumber. all repairs will be performed in-kind, matching the existing stairway design and configuration. less than 50%.Details
stairway system repair. remove and replace all rotted wood members with exterior grade lumber. all repairs will be performed in-kind, matching the existing stairway design and configuration. less than 50%. | $15,000 |
| Jul 28, 2025 | Completed final sign-off Sep 2025 | 2642 25th Av | demo the rotten plywood stud, subfloor board and floor joists in the breakfast nook area. install new plywoods stud subfloor boards and floor joists for the damage area. replace (e) baseboards with new ones, install new drywall, prime and paint. (breakfast nook area) in kind.Details
demo the rotten plywood stud, subfloor board and floor joists in the breakfast nook area. install new plywoods stud subfloor boards and floor joists for the damage area. replace (e) baseboards with new ones, install new drywall, prime and paint. (breakfast nook area) in kind. | $8,000 |
| Dec 20, 2024 | Completed final sign-off Feb 2025 | 2400 Geary Bl | 1) run new circuits for electric heaters to be installed in 2 bedrooms. 2) install new laminate flooring over the existing flooring.Details
1) run new circuits for electric heaters to be installed in 2 bedrooms. 2) install new laminate flooring over the existing flooring. | $8,000 |
| Oct 10, 2024 | Completed final sign-off Jan 2025 | 1150 Clay St | remodel kitchen, like for like replacement. no layout change. removel bath, like for like replacement, no layout change. add subpanel in kitchen sep permitDetails
remodel kitchen, like for like replacement. no layout change. removel bath, like for like replacement, no layout change. add subpanel in kitchen sep permit | $26,000 |
| Sep 30, 2024 | Completed final sign-off Dec 2024 | 900 Columbus Av | revision to pa 202307051508 add concrete rebar detail per inspector requestDetails
revision to pa 202307051508 add concrete rebar detail per inspector request | |
| Sep 27, 2024 | Completed final sign-off Aug 2025 | 1553 Leavenworth St | for 1553a. interior remodel for a ground floor unit: new second bath, refresh existing kitchen and bath, replace unit doors and hardware, new insulation, dropped ceiling and finisher, replace electrical and lighting, new hot water heater and space conditioning combination unit,upgrade elcetricalDetails
for 1553a. interior remodel for a ground floor unit: new second bath, refresh existing kitchen and bath, replace unit doors and hardware, new insulation, dropped ceiling and finisher, replace electrical and lighting, new hot water heater and space conditioning combination unit,upgrade elcetrical | $85,000 |
| Jul 26, 2024 | Completed final sign-off Dec 2024 | 2485 46th Av | remove about 75 sq ft of stucco located on 2nd floor exterior hallway to assess the condition of the wood members. make repair if necessary (inkind framing). apply stucco in the same location after the assessment.Details
remove about 75 sq ft of stucco located on 2nd floor exterior hallway to assess the condition of the wood members. make repair if necessary (inkind framing). apply stucco in the same location after the assessment. | $6,000 |
| May 23, 2024 | Completed final sign-off Aug 2024 | 77 Dow Pl | remodel 1 full bath and 1 half bath. replace overhead fan, light fixture, mirror, counter top, sink and toilet paint existing vanity upgrade to gfci outlet in the powder room replace light fixture mirror, and counter top, sink and faucet, replace single with double gang outlet, paintDetails
remodel 1 full bath and 1 half bath. replace overhead fan, light fixture, mirror, counter top, sink and toilet paint existing vanity upgrade to gfci outlet in the powder room replace light fixture mirror, and counter top, sink and faucet, replace single with double gang outlet, paint | $13,000 |
| Jul 5, 2023 | Completed final sign-off Dec 2024 | 910 Columbus Av | to comply w/ accessible business program abe# 201912129762, request for technical infeasibility, no proposed work.Details
to comply w/ accessible business program abe# 201912129762, request for technical infeasibility, no proposed work. | |
| Jul 5, 2023 | Completed final sign-off Dec 2024 | 900 Columbus Av | to compy w/the accessible business entrance program abe# 201912129761, new exterior accessible ramp to entrance door.Details
to compy w/the accessible business entrance program abe# 201912129761, new exterior accessible ramp to entrance door. | $8,000 |