Back to bathroom remodel contractors
Anova Build Inc
- Based in
- Alameda
- On San Francisco permits
- Jul 2023 to May 2026
- Last 24 months
- 6 permits filed
12 permits since 2000: 10 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 3 completed, 2 in progress. Typically 0 days from filing to permit and 96 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | In progress issued May 2026 | 145 Lomita Av | remodel in kind, remodel 3 bathrooms and 1 kitchen, install new vanities, bathtub, walk in shower tiles, light fixtures, and exhaust fans. install a new subpanel in the hallway. replace the existing cainetry, countertops and sink in the small room next to the kitchen on 2nd floor, replace carpetDetails
remodel in kind, remodel 3 bathrooms and 1 kitchen, install new vanities, bathtub, walk in shower tiles, light fixtures, and exhaust fans. install a new subpanel in the hallway. replace the existing cainetry, countertops and sink in the small room next to the kitchen on 2nd floor, replace carpet | $52,200 |
| Apr 6, 2026 | In progress issued Apr 2026 | 1882 41st Av | 1/f: remodel bathroom & convert family room to kitchennete per plan. repair and replace floor drain at rear yard.Details
1/f: remodel bathroom & convert family room to kitchennete per plan. repair and replace floor drain at rear yard. | $37,500 |
| Oct 10, 2024 | Completed final sign-off Jan 2025 | 1150 Clay St | remodel kitchen, like for like replacement. no layout change. removel bath, like for like replacement, no layout change. add subpanel in kitchen sep permitDetails
remodel kitchen, like for like replacement. no layout change. removel bath, like for like replacement, no layout change. add subpanel in kitchen sep permit | $26,000 |
| Sep 27, 2024 | Completed final sign-off Aug 2025 | 1553 Leavenworth St | for 1553a. interior remodel for a ground floor unit: new second bath, refresh existing kitchen and bath, replace unit doors and hardware, new insulation, dropped ceiling and finisher, replace electrical and lighting, new hot water heater and space conditioning combination unit,upgrade elcetricalDetails
for 1553a. interior remodel for a ground floor unit: new second bath, refresh existing kitchen and bath, replace unit doors and hardware, new insulation, dropped ceiling and finisher, replace electrical and lighting, new hot water heater and space conditioning combination unit,upgrade elcetrical | $85,000 |
| May 23, 2024 | Completed final sign-off Aug 2024 | 77 Dow Pl | remodel 1 full bath and 1 half bath. replace overhead fan, light fixture, mirror, counter top, sink and toilet paint existing vanity upgrade to gfci outlet in the powder room replace light fixture mirror, and counter top, sink and faucet, replace single with double gang outlet, paintDetails
remodel 1 full bath and 1 half bath. replace overhead fan, light fixture, mirror, counter top, sink and toilet paint existing vanity upgrade to gfci outlet in the powder room replace light fixture mirror, and counter top, sink and faucet, replace single with double gang outlet, paint | $13,000 |