Anne Hart Design Build
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Jan 2020
- Last 24 months
- 0 permits filed
20 permits since 2000: 13 completed, 7 never finaled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 3 completed, 2 never finaled. Typically 32 days from filing to permit and 776 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2019 | Never finaled issued Apr 2019, no final | 82 06th Av | new rear exterior stair connecting existing roof deck on 2nd fl to rear yard in conformance of sf planning code section 136 (a)(14)Details
new rear exterior stair connecting existing roof deck on 2nd fl to rear yard in conformance of sf planning code section 136 (a)(14) | $26,500 |
| May 8, 2018 | Never finaled issued May 2018, no final | 318 Moraga St | to comply with nov 201860121. revision to permit 2016-0316-2181 update exterior to finish to plaster updated window/door product/sizes. update exterior rear stairs. updated entry and landscaping. add wash bin at 3rd floor. updated footing design, column locations & beam sizingDetails
to comply with nov 201860121. revision to permit 2016-0316-2181 update exterior to finish to plaster updated window/door product/sizes. update exterior rear stairs. updated entry and landscaping. add wash bin at 3rd floor. updated footing design, column locations & beam sizing | $30,000 |
| Mar 16, 2016 | Completed final sign-off Aug 2019 | 318 Moraga St | replace (e) exterior entry stair with new 1st floor entrance, horizontal addition @ (e) stair. update 2nd floor bay window. window locations minor dormers @ property rear over bathroom & kitchen. all floors upgrade m.e.p. new windows & doors. repair (e) exterior finishes. remove alum siding.Details
replace (e) exterior entry stair with new 1st floor entrance, horizontal addition @ (e) stair. update 2nd floor bay window. window locations minor dormers @ property rear over bathroom & kitchen. all floors upgrade m.e.p. new windows & doors. repair (e) exterior finishes. remove alum siding. | $405,000 |
| Dec 31, 2014 | Completed final sign-off Aug 2017 | 485 Douglass St | new deck from second floor at rear yard. new spiral stair from deck to rear yard below. replace windows at bdrm 1, 201 and bdrm 2, 202 with glazed patio doors, no change in opening size.Details
new deck from second floor at rear yard. new spiral stair from deck to rear yard below. replace windows at bdrm 1, 201 and bdrm 2, 202 with glazed patio doors, no change in opening size. | $17,500 |
| Nov 20, 2014 | Completed final sign-off May 2016 | 485 Douglass St | 2/f: remodel kitchen & bathroom, replace rear bedroom windows. remodel 1/f to add a new master bedroom, a new bathroom, a laundry room & reconfigure existing interior stair. infill (e) lightwell, new conc. patio & planters, (n) furnace & water heater.Details
2/f: remodel kitchen & bathroom, replace rear bedroom windows. remodel 1/f to add a new master bedroom, a new bathroom, a laundry room & reconfigure existing interior stair. infill (e) lightwell, new conc. patio & planters, (n) furnace & water heater. | $265,000 |