Anne Hart Design Build
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Jan 2020
- Last 24 months
- 0 permits filed
20 permits since 2000: 13 completed, 7 never finaled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 196 days from filing to permit and 776 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 31, 2014 | Completed final sign-off Aug 2017 | 485 Douglass St | new deck from second floor at rear yard. new spiral stair from deck to rear yard below. replace windows at bdrm 1, 201 and bdrm 2, 202 with glazed patio doors, no change in opening size.Details
new deck from second floor at rear yard. new spiral stair from deck to rear yard below. replace windows at bdrm 1, 201 and bdrm 2, 202 with glazed patio doors, no change in opening size. | $17,500 |