Back to bathroom remodel contractors
Anne Hart Design Build
- Based in
- San Francisco
- On San Francisco permits
- May 2007 to Jan 2020
- Last 24 months
- 0 permits filed
20 permits since 2000: 13 completed, 7 never finaled.
Of the 7 never-finaled permits, 3 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 never finaled. Typically 20 days from filing to permit and 218 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 19, 2016 | Completed final sign-off Nov 2016 | 180 Bocana St | remove existing beam at ceilingof lower unit. remove exisitng non-load bearing in lower unit, replace w/new load bearing wall. new fixtures & finishes in kitchen & bathroom.Details
remove existing beam at ceilingof lower unit. remove exisitng non-load bearing in lower unit, replace w/new load bearing wall. new fixtures & finishes in kitchen & bathroom. | $129,000 |
| Mar 16, 2016 | Completed final sign-off Aug 2019 | 318 Moraga St | replace (e) exterior entry stair with new 1st floor entrance, horizontal addition @ (e) stair. update 2nd floor bay window. window locations minor dormers @ property rear over bathroom & kitchen. all floors upgrade m.e.p. new windows & doors. repair (e) exterior finishes. remove alum siding.Details
replace (e) exterior entry stair with new 1st floor entrance, horizontal addition @ (e) stair. update 2nd floor bay window. window locations minor dormers @ property rear over bathroom & kitchen. all floors upgrade m.e.p. new windows & doors. repair (e) exterior finishes. remove alum siding. | $405,000 |
| Nov 20, 2014 | Completed final sign-off May 2016 | 485 Douglass St | 2/f: remodel kitchen & bathroom, replace rear bedroom windows. remodel 1/f to add a new master bedroom, a new bathroom, a laundry room & reconfigure existing interior stair. infill (e) lightwell, new conc. patio & planters, (n) furnace & water heater.Details
2/f: remodel kitchen & bathroom, replace rear bedroom windows. remodel 1/f to add a new master bedroom, a new bathroom, a laundry room & reconfigure existing interior stair. infill (e) lightwell, new conc. patio & planters, (n) furnace & water heater. | $265,000 |
| May 22, 2014 | Never finaled issued Jun 2014, no final | 775 37th Av | 1)remove section of extg bearing wall on middle level. 2)new kitchen fixtures/cabinets/finishes on middle level. 3)new bathroom fixtures/cabinets/ finishes on top level per plan.Details
1)remove section of extg bearing wall on middle level. 2)new kitchen fixtures/cabinets/finishes on middle level. 3)new bathroom fixtures/cabinets/ finishes on top level per plan. | $15,000 |
| Apr 5, 2010 | Completed final sign-off Jun 2010 | 322 28th St | remodel e toilet, tub, sink, vanity, window and drywall. upgrade all electric to bath per sf codes. high eff or occupancy sensor. uprade plumbing. new drywall, tub, tile,vanity, toilet, new fiberglass windows in kind. solar tube (12" max) ufactor .40 maxDetails
remodel e toilet, tub, sink, vanity, window and drywall. upgrade all electric to bath per sf codes. high eff or occupancy sensor. uprade plumbing. new drywall, tub, tile,vanity, toilet, new fiberglass windows in kind. solar tube (12" max) ufactor .40 max | $40,000 |
| Mar 4, 2008 | Completed final sign-off Oct 2008 | 1360 Goettingen St | demo/re-configure kitchen & bathrm in same space build. new kitchen & bath to include all new appliances, cabinets, plumbing, electrical, fixtures. remove (e) window and (e) door & replace with new 5-0 by 6-10 slider exterior repair to siding as neededDetails
demo/re-configure kitchen & bathrm in same space build. new kitchen & bath to include all new appliances, cabinets, plumbing, electrical, fixtures. remove (e) window and (e) door & replace with new 5-0 by 6-10 slider exterior repair to siding as needed | $85,000 |
| May 16, 2007 | Never finaled issued May 2007, no final | 1360 Goettingen St | kitchen remodel-all cabinets, appliances. new electrical, plumbing in bathroom. bathroom new to replace old. all new plumbing & electrical. fixtures in bedroom, remodel. new windows in all of above. all to be painted including same exterior repairs. also to be painted. window replacements no viewDetails
kitchen remodel-all cabinets, appliances. new electrical, plumbing in bathroom. bathroom new to replace old. all new plumbing & electrical. fixtures in bedroom, remodel. new windows in all of above. all to be painted including same exterior repairs. also to be painted. window replacements no view | $85,000 |