Analito U Rama
- Based in
- Hayward
- On San Francisco permits
- Oct 2004 to Feb 2017
- Last 24 months
- 0 permits filed
22 permits since 2000: 21 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
5 stairs permits: 4 completed, 1 expired or cancelled. Typically 225 days from filing to permit and 301 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2015 | Expired or cancelled withdrawn Mar 2016 | 1283 Howard St | remove (e) damaged wood three stroy stairs. install new guardrails at two door locations at level 2 & level3. no interior work. maher - not req'd ref 201504103326Details
remove (e) damaged wood three stroy stairs. install new guardrails at two door locations at level 2 & level3. no interior work. maher - not req'd ref 201504103326 | $8,000 |
| Apr 10, 2015 | Completed final sign-off Jun 2017 | 1283 Howard St | remove (e) 3 story wood stairs + decks at rear yard. construct new steel 3 story steel spiral stairs + decks to replace. no proposed work within building. new 5'-0" diameter spiral stair proposed. n/a for maher ordinance.Details
remove (e) 3 story wood stairs + decks at rear yard. construct new steel 3 story steel spiral stairs + decks to replace. no proposed work within building. new 5'-0" diameter spiral stair proposed. n/a for maher ordinance. | $30,000 |
| May 24, 2011 | Completed final sign-off Oct 2011 | 1528 Noe St | legalize and heat workroom space below living level, construct new interior stairway to work room. install new subsurface drainage line at workroom floor, new flooring and new lighting.Details
legalize and heat workroom space below living level, construct new interior stairway to work room. install new subsurface drainage line at workroom floor, new flooring and new lighting. | $20,000 |
| Sep 3, 2010 | Completed final sign-off Jul 2011 | 56 Laidley St | remodel master bathroom and laundry room. laundry room to expand within basement space. new concrete ret. wall and drainage system at (e) crawl space. replace interior stairs at level 1.Details
remodel master bathroom and laundry room. laundry room to expand within basement space. new concrete ret. wall and drainage system at (e) crawl space. replace interior stairs at level 1. | $50,000 |
| Aug 7, 2009 | Completed final sign-off Feb 2014 | 4343 19th St | removal of existing exterior stair. replace existing stair with new wood with code complaint stair. to comply with violation notice 200907801 & legalization of 2-level deck at rear.Details
removal of existing exterior stair. replace existing stair with new wood with code complaint stair. to comply with violation notice 200907801 & legalization of 2-level deck at rear. | $5,000 |