Back to bathroom remodel contractors
Analito U Rama
- Based in
- Hayward
- On San Francisco permits
- Oct 2004 to Feb 2017
- Last 24 months
- 0 permits filed
22 permits since 2000: 21 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 12 completed. Typically 2 days from filing to permit and 157 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2017 | Completed final sign-off May 2017 | 15 Heyman Av | dryrot repair 12' wall replacement of studs and some rafters. not visible from street, back of house near bathroom 10' rafters, 12x6 areaDetails
dryrot repair 12' wall replacement of studs and some rafters. not visible from street, back of house near bathroom 10' rafters, 12x6 area | $2,000 |
| Dec 8, 2016 | Completed final sign-off May 2017 | 15 Heyman Av | kitchen and bath remodel: replace wall with sheetrock, retrofit windows 4 back side; kitchen and bath flooring, rewire whole unit 20 lights. 24 outlets; plumbing, tub replace and shower, dishwasher, washing machine.Details
kitchen and bath remodel: replace wall with sheetrock, retrofit windows 4 back side; kitchen and bath flooring, rewire whole unit 20 lights. 24 outlets; plumbing, tub replace and shower, dishwasher, washing machine. | $75,000 |
| Nov 18, 2016 | Completed final sign-off Apr 2017 | 15 Heyman Av | one kitchen & one bath remodel, replace floors, wall plasters remove, replace with sheetrock, electrical rewire, new furance, replace some pipes. no walls removed.Details
one kitchen & one bath remodel, replace floors, wall plasters remove, replace with sheetrock, electrical rewire, new furance, replace some pipes. no walls removed. | $75,000 |
| Apr 19, 2016 | Completed final sign-off Jul 2016 | 152 San Carlos St | remodel kitchen & bath, replace sheetrock in kitchen & bath, new flooring, electrical, plumbing, new furnaces, ceiling & wall insulation. no structural work.Details
remodel kitchen & bath, replace sheetrock in kitchen & bath, new flooring, electrical, plumbing, new furnaces, ceiling & wall insulation. no structural work. | $66,700 |
| May 15, 2015 | Completed final sign-off Oct 2015 | 150 San Carlos St | remodel kitchen & bathroom - new floor, partial wallboard, new electrical & plumbing, repair dryrot. no change on wall.Details
remodel kitchen & bathroom - new floor, partial wallboard, new electrical & plumbing, repair dryrot. no change on wall. | $40,000 |
| Mar 13, 2015 | Completed final sign-off Apr 2016 | 1283 Howard St | work with #1283 (2nd & 3rd flr). remodel kitchen & bath within both apts. construct new master bath, & install new furnace, tankless w/h @ both apts. remove selected walls & replac ewith headers per struct plan. replace single pane windows at front ( match style + material). n/a maher ordinanDetails
work with #1283 (2nd & 3rd flr). remodel kitchen & bath within both apts. construct new master bath, & install new furnace, tankless w/h @ both apts. remove selected walls & replac ewith headers per struct plan. replace single pane windows at front ( match style + material). n/a maher ordinan | $180,000 |
| Nov 7, 2013 | Completed final sign-off Mar 2014 | 152 San Carlos St | # 52-a: rewiring all rooms/changing plumbing fixtures relocation drain/ installing kitchen cabinets, new flooring in 4 rooms, paint. plaster walls bathroom & kitchen remodelDetails
# 52-a: rewiring all rooms/changing plumbing fixtures relocation drain/ installing kitchen cabinets, new flooring in 4 rooms, paint. plaster walls bathroom & kitchen remodel | $30,000 |
| Aug 3, 2012 | Completed final sign-off Jan 2013 | 575 Eureka St | infill side lightwell and create addition of 25 sq ft at first, second and third floor levels. remodel kitchen and bathroom at third floor level. install new bathroom at existing utility room (third floor). remove selected interior walls per plan. new fau at third floor attic location. 2 new skyliDetails
infill side lightwell and create addition of 25 sq ft at first, second and third floor levels. remodel kitchen and bathroom at third floor level. install new bathroom at existing utility room (third floor). remove selected interior walls per plan. new fau at third floor attic location. 2 new skyli | $55,000 |
| May 21, 2012 | Completed final sign-off Jul 2012 | 3806 19th St | work at 3806 19th st. only: work related/comply with nov# 201152525-remove unpermitted kitchen & bath tub at ground level. legalize half bathroom & work sink at ground levelDetails
work at 3806 19th st. only: work related/comply with nov# 201152525-remove unpermitted kitchen & bath tub at ground level. legalize half bathroom & work sink at ground level | $13,000 |
| Apr 13, 2012 | Completed final sign-off Jun 2013 | 4343 19th St | repair rear fire damaged interior at 1st/2nd fl levels. replace/remodel damaged kitchen at 2nd fl. remodel exisitng bath and expand e bath # 2 at 2nd fl. rreplace e wall heater with new fau at 2nd fl. replace 3 eisting wood windows at front facade. replace 3 windowsDetails
repair rear fire damaged interior at 1st/2nd fl levels. replace/remodel damaged kitchen at 2nd fl. remodel exisitng bath and expand e bath # 2 at 2nd fl. rreplace e wall heater with new fau at 2nd fl. replace 3 eisting wood windows at front facade. replace 3 windows | $80,000 |
| Sep 7, 2011 | Completed final sign-off Dec 2011 | 150 San Carlos St | remodel kitchen and bath within level 2 unit. new wh and air handler within apt. new lights at selected locations. remove interior partition and replace with headerDetails
remodel kitchen and bath within level 2 unit. new wh and air handler within apt. new lights at selected locations. remove interior partition and replace with header | $20,000 |
| Sep 3, 2010 | Completed final sign-off Jul 2011 | 56 Laidley St | remodel master bathroom and laundry room. laundry room to expand within basement space. new concrete ret. wall and drainage system at (e) crawl space. replace interior stairs at level 1.Details
remodel master bathroom and laundry room. laundry room to expand within basement space. new concrete ret. wall and drainage system at (e) crawl space. replace interior stairs at level 1. | $50,000 |