Analito U Rama
- Based in
- Hayward
- On San Francisco permits
- Oct 2004 to Feb 2017
- Last 24 months
- 0 permits filed
22 permits since 2000: 21 completed, 1 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 813 days from filing to permit and 407 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2015 | Completed final sign-off Jun 2017 | 1283 Howard St | remove (e) 3 story wood stairs + decks at rear yard. construct new steel 3 story steel spiral stairs + decks to replace. no proposed work within building. new 5'-0" diameter spiral stair proposed. n/a for maher ordinance.Details
remove (e) 3 story wood stairs + decks at rear yard. construct new steel 3 story steel spiral stairs + decks to replace. no proposed work within building. new 5'-0" diameter spiral stair proposed. n/a for maher ordinance. | $30,000 |
| Aug 7, 2009 | Completed final sign-off Feb 2014 | 4343 19th St | removal of existing exterior stair. replace existing stair with new wood with code complaint stair. to comply with violation notice 200907801 & legalization of 2-level deck at rear.Details
removal of existing exterior stair. replace existing stair with new wood with code complaint stair. to comply with violation notice 200907801 & legalization of 2-level deck at rear. | $5,000 |