Back to bathroom remodel contractors
An Dun Construction
- Based in
- San Francisco
- On San Francisco permits
- May 2009 to Oct 2026
- Last 24 months
- 3 permits filed
132 permits since 2000: 77 completed, 4 in progress, 28 never finaled, 23 expired or cancelled.
Of the 28 never-finaled permits, 2 are 3 to 5 years old, 10 are 5 to 10 years old, 16 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
35 bathroom remodel permits: 17 completed, 1 in progress, 6 never finaled, 11 expired or cancelled. Typically 7 days from filing to permit and 211 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 10, 2023 | Never finaled issued Jan 2023, no final | 817 Chenery St | remove and replace water damaged materials in kitchen, living room and bathroom. update bathroom tile and replace kitchen cabinet doors only. install new flooring throughout and paint. no ceiling demoDetails
remove and replace water damaged materials in kitchen, living room and bathroom. update bathroom tile and replace kitchen cabinet doors only. install new flooring throughout and paint. no ceiling demo | $10,000 |
| Mar 10, 2022 | In progress issued May 2025 | 2534 28th Av | new horizontal addition at rear. new veritical 3rd fl addition & decks. new exterior cladding throughout. modifications to front facade. reconfiguration of all interior walls. new interior stairs, relocate interior bathrooms, renovate existing kitchen.Details
new horizontal addition at rear. new veritical 3rd fl addition & decks. new exterior cladding throughout. modifications to front facade. reconfiguration of all interior walls. new interior stairs, relocate interior bathrooms, renovate existing kitchen. | $150,000 |
| Sep 24, 2019 | Never finaled issued Oct 2019, no final | 114 Precita Av | revision to 201904238662 plan changes inculding interior bathroom layout changes & locationDetails
revision to 201904238662 plan changes inculding interior bathroom layout changes & location | |
| Apr 23, 2019 | Never finaled issued Aug 2019, no final | 114 Precita Av | remodel (e) 3-story 3-unit res bldg. convert 1st flr unit fr studio to 2 bed,2 baths.add bath in units 2&3.cosmetic upgrades to all units, voluntary seismic upgrades,voluntary elec&plumb upgrades.add 1-2 windows per unit for daylite purpose only.add skylite,roof repl,hvac upgrades. sprinkler deferreDetails
remodel (e) 3-story 3-unit res bldg. convert 1st flr unit fr studio to 2 bed,2 baths.add bath in units 2&3.cosmetic upgrades to all units, voluntary seismic upgrades,voluntary elec&plumb upgrades.add 1-2 windows per unit for daylite purpose only.add skylite,roof repl,hvac upgrades. sprinkler deferre | $186,000 |
| Feb 25, 2019 | Completed final sign-off May 2019 | 262 Evelyn Wy | install (n) kitchen countertop, paint (e) cabinets. no change to kitchen layout. replace bathroom tiles and toilet. replace kitchen and bath sink. no change to bathroom layout. paint all walls & ceilings. refinish wood floors. no change of (e) floor planDetails
install (n) kitchen countertop, paint (e) cabinets. no change to kitchen layout. replace bathroom tiles and toilet. replace kitchen and bath sink. no change to bathroom layout. paint all walls & ceilings. refinish wood floors. no change of (e) floor plan | $5,000 |
| Aug 15, 2017 | Completed final sign-off Dec 2017 | 3241 25th St | revision to 201703020524. revised ada restroom per plan. ada bathroom to be deleted from previous scope of workDetails
revision to 201703020524. revised ada restroom per plan. ada bathroom to be deleted from previous scope of work | |
| Jul 7, 2017 | Completed final sign-off Mar 2024 | 25 17th Av | to comply w/ nov 201623795 & 201757399 & plann enf case #2016009806, horzon additn, lobby elevator, entertait rm, bath at 1st fl, laundry, 3 bath 2nd & 3rd fl, replace side walk, repair stucco, relocate meter, reppair fence, add 1 bedrm & bath at 4th floor. no penalty for this 201707171206Details
to comply w/ nov 201623795 & 201757399 & plann enf case #2016009806, horzon additn, lobby elevator, entertait rm, bath at 1st fl, laundry, 3 bath 2nd & 3rd fl, replace side walk, repair stucco, relocate meter, reppair fence, add 1 bedrm & bath at 4th floor. no penalty for this 201707171206 | $300,000 |
| Jun 16, 2017 | Completed final sign-off Jan 2018 | 2375 21st Av | remodel of g/f at rear to include (n) living area, (n) bedroom, (n) bathroom, (n) sunken patio with 4' max retaining walls. removal of (2) existing windows and 1 door at west elevation & replaced by 1 sliding door & 1 egress window.Details
remodel of g/f at rear to include (n) living area, (n) bedroom, (n) bathroom, (n) sunken patio with 4' max retaining walls. removal of (2) existing windows and 1 door at west elevation & replaced by 1 sliding door & 1 egress window. | $30,000 |
| Feb 6, 2017 | Completed final sign-off Oct 2017 | 3241 25th St | remodel (e) kitchens and two bathrooms on each unit #3241, 3243, 3245, and 3247. total of 8 bathrooms and 4 kitchens.Details
remodel (e) kitchens and two bathrooms on each unit #3241, 3243, 3245, and 3247. total of 8 bathrooms and 4 kitchens. | $120,000 |
| Sep 27, 2016 | Completed final sign-off Sep 2017 | 2375 21st Av | remodel of 2nd & 3rd floors to include: removal of walls & doors as shown on plans, relocation of kitche, new office and new bathroom. lowering of existing slab at rear of ground floor.no exterior work proposed.Details
remodel of 2nd & 3rd floors to include: removal of walls & doors as shown on plans, relocation of kitche, new office and new bathroom. lowering of existing slab at rear of ground floor.no exterior work proposed. | $60,000 |
| Jun 16, 2016 | Never finaled issued Jun 2016, no final | 2800 Lake St | obtain additional build permit for one bathroom in ref to pa #201504304973.Details
obtain additional build permit for one bathroom in ref to pa #201504304973. | $20,000 |
| Apr 30, 2015 | Never finaled issued Apr 2015, no final | 2800 Lake St | kitchen & bathroom remodel: remove & replace kitchen cabinets, remove kitchen floor tiles & replace with wood. remove & replace bathroom floor & wall tiles. no new wall & no existing wall relocation. lighting in kitchen & bathroom remodel shall comply with cec 150.0(k)3 & 150.0(k)5.Details
kitchen & bathroom remodel: remove & replace kitchen cabinets, remove kitchen floor tiles & replace with wood. remove & replace bathroom floor & wall tiles. no new wall & no existing wall relocation. lighting in kitchen & bathroom remodel shall comply with cec 150.0(k)3 & 150.0(k)5. | $20,000 |
| Aug 19, 2013 | Completed final sign-off Dec 2018 | 2315 Webster St | to comply with complaint # 201311632, remodle kitchen ,new cabinets, countertops,upgrade bathrooms with new fixtures, instla lnew light fixtures throughout hose.Details
to comply with complaint # 201311632, remodle kitchen ,new cabinets, countertops,upgrade bathrooms with new fixtures, instla lnew light fixtures throughout hose. | $20,000 |
| Aug 23, 2012 | Completed final sign-off Apr 2015 | 2929 Buchanan St | remodel existing kitchen & bathroom.Details
remodel existing kitchen & bathroom. | $20,000 |
| Jun 28, 2012 | Completed final sign-off May 2013 | 212 Eureka St | remodel bathroom and kitchen only in both units. (n) lighting to comply with cec 150(k)Details
remodel bathroom and kitchen only in both units. (n) lighting to comply with cec 150(k) | $500 |
| Mar 5, 2012 | Completed final sign-off Oct 2012 | 15 San Carlos St | demo 4 kitchens and bathrooms. remove cabinets, vanity and plumbing fixtures, replace with new cabinets & fixtures in both kitchen & bathroom. no new lighting.Details
demo 4 kitchens and bathrooms. remove cabinets, vanity and plumbing fixtures, replace with new cabinets & fixtures in both kitchen & bathroom. no new lighting. | $4,000 |
| Mar 5, 2012 | Never finaled issued Mar 2012, no final | 2534 28th Av | remove/replace kitchen cabinets with new, remove/replace (e) bathroom tiles, remove/replace 4 dry rotted windows, replace damaged (e) garage door with new fiberglass, install new flooring & paint. install 3 operable casement windows, 2 fixed windows. all window will be wood. no structural workDetails
remove/replace kitchen cabinets with new, remove/replace (e) bathroom tiles, remove/replace 4 dry rotted windows, replace damaged (e) garage door with new fiberglass, install new flooring & paint. install 3 operable casement windows, 2 fixed windows. all window will be wood. no structural work | $10,000 |
| Jul 29, 2011 | Expired or cancelled expired Jun 2013 | 1490 Francisco St | unit #2 interior remodel to include new interior wall finishes, remodel existing kitchen and bathroom upgrade (e) electrical and lighting.Details
unit #2 interior remodel to include new interior wall finishes, remodel existing kitchen and bathroom upgrade (e) electrical and lighting. | $10,000 |
| Jul 29, 2011 | Expired or cancelled expired Jun 2013 | 1490 Francisco St | unit #4 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting.Details
unit #4 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting. | $10,000 |
| Jul 29, 2011 | Expired or cancelled expired Jun 2013 | 1490 Francisco St | unit #12 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting. swap location of living room and bedroom.Details
unit #12 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting. swap location of living room and bedroom. | $10,000 |
| Jul 29, 2011 | Expired or cancelled expired Jun 2013 | 1490 Francisco St | unit #8 interior remodel to include new interior wall finishes, remodel existing kitchen and bathroom upgrade electrical and lighting.Details
unit #8 interior remodel to include new interior wall finishes, remodel existing kitchen and bathroom upgrade electrical and lighting. | $10,000 |
| Jul 29, 2011 | Expired or cancelled expired Jun 2013 | 1490 Francisco St | unit #6 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting.Details
unit #6 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting. | $10,000 |
| Jul 29, 2011 | Expired or cancelled expired Jun 2013 | 1490 Francisco St | unit #11 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting.Details
unit #11 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting. | $18,000 |
| Jul 29, 2011 | Expired or cancelled expired Jun 2013 | 1490 Francisco St | unit #9 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting.Details
unit #9 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting. | $18,000 |
| Jul 29, 2011 | Expired or cancelled expired Jun 2013 | 1490 Francisco St | unit #5 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting.Details
unit #5 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting. | $10,000 |
| Jul 29, 2011 | Expired or cancelled expired Jun 2013 | 1490 Francisco St | unit #10 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting.Details
unit #10 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting. | $10,000 |
| Jul 29, 2011 | Expired or cancelled expired Jun 2013 | 1490 Francisco St | unit #7 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting.Details
unit #7 interior remodel to include new interior wall finishing, remodel existing kitchen and bathroom upgrade electrical and lighting. | $10,000 |
| May 9, 2011 | Completed final sign-off Dec 2011 | 101 Lombard St | remove & replace (e) cabinets with new kitchen cabinets. replace (e) lighting in two batrooms & kitchen. remove and replace (e) plumbing in two bathrooms & kitchen. bathroom: high efficacy lighting or occupancy sensor.Details
remove & replace (e) cabinets with new kitchen cabinets. replace (e) lighting in two batrooms & kitchen. remove and replace (e) plumbing in two bathrooms & kitchen. bathroom: high efficacy lighting or occupancy sensor. | $30,000 |
| Jan 24, 2011 | Completed final sign-off Aug 2011 | 154 Lombard St | unit #40 - remodel three bathrooms & remodel 1 kitchen. all work within same unit, no change to wall windows or doors.Details
unit #40 - remodel three bathrooms & remodel 1 kitchen. all work within same unit, no change to wall windows or doors. | $50,000 |
| Nov 18, 2010 | Expired or cancelled expired Aug 2014 | 1037 Rivera St | remodel existing bathroom, upgrade all existing plumbing drains & hot & cold water lines. install new shower pan. add new recess lighting & ceiling fan. install new floor tiles on existing floor & within new shower. no wall relocation.Details
remodel existing bathroom, upgrade all existing plumbing drains & hot & cold water lines. install new shower pan. add new recess lighting & ceiling fan. install new floor tiles on existing floor & within new shower. no wall relocation. | $10,000 |
| Oct 8, 2010 | Completed final sign-off Oct 2011 | 160 San Anselmo Av | remodel 3 bathrooms, install new plumbing fixtures into existing, install new lightin in 3 bathrooms, install new tiles in bathrooms, replace 2 existing garage doors, install 3 new gas lines to 3 fireplaces, install new trench drain, repair damaged roof tilesDetails
remodel 3 bathrooms, install new plumbing fixtures into existing, install new lightin in 3 bathrooms, install new tiles in bathrooms, replace 2 existing garage doors, install 3 new gas lines to 3 fireplaces, install new trench drain, repair damaged roof tiles | $30,000 |
| Aug 16, 2010 | Completed final sign-off Sep 2010 | 96 Cumberland St | remodel bathroom, install new shower pan & bathroom fixtures, install 2 recess lights, install new tiles, area to be remodeled is 51 sqft., highe efficacy lighting or occupancy sensor control, repl window u-factor 0.40 max not visible from streetDetails
remodel bathroom, install new shower pan & bathroom fixtures, install 2 recess lights, install new tiles, area to be remodeled is 51 sqft., highe efficacy lighting or occupancy sensor control, repl window u-factor 0.40 max not visible from street | $10,000 |
| Jul 16, 2010 | Completed final sign-off Aug 2011 | 720 Shrader St | renovation of existing bath and exising 1/2 bath. includes upgrade of plumbing, elec, new tile installationDetails
renovation of existing bath and exising 1/2 bath. includes upgrade of plumbing, elec, new tile installation | $20,000 |
| May 12, 2010 | Completed final sign-off Sep 2010 | 1471 Green St | demolition of approx. 10-linear feet o corridor wall. install (n) beams to re-support (e) ceiling, bathroom renovation.Details
demolition of approx. 10-linear feet o corridor wall. install (n) beams to re-support (e) ceiling, bathroom renovation. | $10,000 |
| Apr 16, 2010 | Completed final sign-off Aug 2010 | 96 Cumberland St | 1 bathroom addition, 1 bathroom remodel, 1 kitchen remodel/relocate, refurbish hardwood flooring, 1 new furnace. work on unit 96a only.Details
1 bathroom addition, 1 bathroom remodel, 1 kitchen remodel/relocate, refurbish hardwood flooring, 1 new furnace. work on unit 96a only. | $42,000 |