Permit GraphShortlistSan Francisco building permits since 2000

Block 2350, lot 015

2375 21st Ave

City’s use
Multi-Family Residential
Built
1939
Stories
3
Units
2
Rooms
5 bedrooms, 6 bathrooms
Building
3,996 sq ft
Lot
2,996 sq ft
Zoning
RH2
Construction type
D

From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map

Permits filed here

5 permits filed for this property since 2000.

CompletedIn progressNever finaledExpired or cancelled
FiledOutcomeAddressContractorWork described on the permitDeclared cost
Aug 3, 2017Completed
final sign-off Sep 2017
2375 21st AvAn Dun Constructionrevision to pa 2016-0927-8902, structural modifications @ ground floor. removal of interior post and extension of steel beam
Details
Permit
201708033725
Status
complete
Filed
Aug 3, 2017
Permit issued
Aug 23, 2017
Final sign-off
Sep 7, 2017
Address
2375 21st Av

revision to pa 2016-0927-8902, structural modifications @ ground floor. removal of interior post and extension of steel beam

Open the permit page

Jun 16, 2017Completed
final sign-off Jan 2018
2375 21st AvAn Dun Constructionremodel of g/f at rear to include (n) living area, (n) bedroom, (n) bathroom, (n) sunken patio with 4' max retaining walls. removal of (2) existing windows and 1 door at west elevation & replaced by 1 sliding door & 1 egress window.
Details
Permit
201706169654
Status
complete
Filed
Jun 16, 2017
Permit issued
Jun 23, 2017
Final sign-off
Jan 9, 2018
Declared cost
$30,000
Address
2375 21st Av

remodel of g/f at rear to include (n) living area, (n) bedroom, (n) bathroom, (n) sunken patio with 4' max retaining walls. removal of (2) existing windows and 1 door at west elevation & replaced by 1 sliding door & 1 egress window.

Open the permit page

$30,000
Apr 18, 2017Never finaled
issued Apr 2017, no final
2375 21st Avstreet space
Details
Permit
M778987
Status
issued
Filed
Apr 18, 2017
Permit issued
Apr 18, 2017
Address
2375 21st Av

street space

Open the permit page

Sep 27, 2016Completed
final sign-off Sep 2017
2375 21st AvAn Dun Constructionremodel of 2nd & 3rd floors to include: removal of walls & doors as shown on plans, relocation of kitche, new office and new bathroom. lowering of existing slab at rear of ground floor.no exterior work proposed.
Details
Permit
201609278902
Status
complete
Filed
Sep 27, 2016
Permit issued
Sep 28, 2016
Final sign-off
Sep 7, 2017
Declared cost
$60,000
Address
2375 21st Av

remodel of 2nd & 3rd floors to include: removal of walls & doors as shown on plans, relocation of kitche, new office and new bathroom. lowering of existing slab at rear of ground floor.no exterior work proposed.

Open the permit page

$60,000
Mar 16, 2012Completed
final sign-off Apr 2012
2377 21st AvArmstrong Installation Servicereroofing
Details
Permit
201203166258
Status
complete
Filed
Mar 16, 2012
Permit issued
Mar 16, 2012
Final sign-off
Apr 26, 2012
Declared cost
$12,000
Address
2377 21st Av

reroofing

Open the permit page

$12,000

Who worked here

Everyone with a license on these permits, by role, with how many permits each is on.

Contractors
An Dun Construction (3), Armstrong Installation Service
Engineers
Rodrigo Santos (3)

Find contractors for work like this

Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.