Block 2938A, lot 023
262 Evelyn Way
- City’s use
- Single Family Residential
- Built
- 1944
- Stories
- 1
- Units
- 1
- Rooms
- 1 bathroom
- Building
- 1,006 sq ft
- Lot
- 2,443 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 25, 2024 | Completed final sign-off Mar 2024 | 262 Evelyn Wy | dryrot repair at rear deck- frame 5% decking 100% railing repair to meet 42" tall and 4=,ax spacing of pickets requirements less than 50% repair.Details
dryrot repair at rear deck- frame 5% decking 100% railing repair to meet 42" tall and 4=,ax spacing of pickets requirements less than 50% repair. | $15,000 | |
| Jul 22, 2019 | Completed final sign-off Jul 2020 | 262 Evelyn Wy | Del Rio Roofing Company | reroofingDetails
reroofing | $9,600 |
| Jun 27, 2019 | Completed final sign-off Apr 2021 | 262 Evelyn Wy | Superior Building | new insulation and 5/8" sheetrock at garage, remodel of ground level bathroom, open slab as needed for plumbing, replace 100 sqft of cedar shingle siding at rear of home. no structural work.Details
new insulation and 5/8" sheetrock at garage, remodel of ground level bathroom, open slab as needed for plumbing, replace 100 sqft of cedar shingle siding at rear of home. no structural work. | $25,000 |
| Feb 25, 2019 | Completed final sign-off May 2019 | 262 Evelyn Wy | An Dun Construction | install (n) kitchen countertop, paint (e) cabinets. no change to kitchen layout. replace bathroom tiles and toilet. replace kitchen and bath sink. no change to bathroom layout. paint all walls & ceilings. refinish wood floors. no change of (e) floor planDetails
install (n) kitchen countertop, paint (e) cabinets. no change to kitchen layout. replace bathroom tiles and toilet. replace kitchen and bath sink. no change to bathroom layout. paint all walls & ceilings. refinish wood floors. no change of (e) floor plan | $5,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- An Dun Construction, Del Rio Roofing Company, Superior Building
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.