Back to kitchen remodel contractors
American Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Aug 2026
- Last 24 months
- 2 permits filed
55 permits since 2000: 46 completed, 3 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 13 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 277 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2021 | Completed final sign-off Mar 2022 | 14 Dehon St | turn half of (e) mudroom into half bath with in-kind toilet. construct wall with door(3x6) space for half-bath. fill in interior opening to hallway between (e) bath and kitchen to wall. space(31"x 77" area)Details
turn half of (e) mudroom into half bath with in-kind toilet. construct wall with door(3x6) space for half-bath. fill in interior opening to hallway between (e) bath and kitchen to wall. space(31"x 77" area) | $29,200 |
| Apr 16, 2021 | Completed final sign-off Mar 2022 | 14 Dehon St | kitchen and bathroom remodel in kind. replace kitchen cabinets, counter tops & appliances. replace bathroom tub, vanity & toilet. no wall alteration. all work in-kind.Details
kitchen and bathroom remodel in kind. replace kitchen cabinets, counter tops & appliances. replace bathroom tub, vanity & toilet. no wall alteration. all work in-kind. | $30,550 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 3037 Turk Bl | kitchen & bathroom remodel in-kind: nw kitchen caibnets and countertops. new bathroom tile, shower/tub, floor and toilet. install new stackable washer/dryer in (e) closet next to bathroom.Details
kitchen & bathroom remodel in-kind: nw kitchen caibnets and countertops. new bathroom tile, shower/tub, floor and toilet. install new stackable washer/dryer in (e) closet next to bathroom. | $39,500 |
| May 24, 2019 | Completed final sign-off Jul 2020 | 4126 Cabrillo St | kitchen and bath remodel, new kitchen cabinets, update elecrical, remove part of non bearing wall over kitchen counter, construct non bearing wall in kitchen for storage, bath: new toilet, vanity top, power/tub valve, new tile in bathroomDetails
kitchen and bath remodel, new kitchen cabinets, update elecrical, remove part of non bearing wall over kitchen counter, construct non bearing wall in kitchen for storage, bath: new toilet, vanity top, power/tub valve, new tile in bathroom | $26,750 |
| Mar 12, 2018 | Completed final sign-off Sep 2018 | 4173 26th St | 3/f - new half bath . remove extg hall closet for new half bath. update kitchen cabinets, update extg toilet and tub in the extg bathroom. electrical and plumbing permit to be pulled by those trades.Details
3/f - new half bath . remove extg hall closet for new half bath. update kitchen cabinets, update extg toilet and tub in the extg bathroom. electrical and plumbing permit to be pulled by those trades. | $24,000 |
| Feb 9, 2018 | Completed final sign-off Sep 2018 | 4173 26th St | remove wall between kitchen and dining rm at 3rd flDetails
remove wall between kitchen and dining rm at 3rd fl | $3,000 |
| Nov 28, 2016 | Completed final sign-off Jul 2018 | 260 06th Av | unit 260 - (n) half bath, remodel (e) bathroom & kitchen. install (2) windows; unit 262 - (n) half bath, add new master bath. remove fireplace & remodel kitchen, bath. install (2) windows)Details
unit 260 - (n) half bath, remodel (e) bathroom & kitchen. install (2) windows; unit 262 - (n) half bath, add new master bath. remove fireplace & remodel kitchen, bath. install (2) windows) | $55,000 |
| Jul 30, 2015 | Completed final sign-off Jan 2017 | 111 Hahn St | revision to pa #2015.0703.0645 - add new bath at 1st floor, new bath, renovatiion of kitchen, family & bedroom #2, new skylight with parapet on roof.Details
revision to pa #2015.0703.0645 - add new bath at 1st floor, new bath, renovatiion of kitchen, family & bedroom #2, new skylight with parapet on roof. | $47,000 |
| Oct 16, 2014 | Completed final sign-off Jul 2015 | 158 Langton St | kitchen lighting & control per cec 150(k); remodel (2) kitchens & (2) baths in two-unit building; new cabinets, appliances, sinks, dishwasher & light fixtures in kitchen, new toilets, shower stalls, sink w/vanity, & new shower valves; update electrical & plumbing in kitchen & bath.Details
kitchen lighting & control per cec 150(k); remodel (2) kitchens & (2) baths in two-unit building; new cabinets, appliances, sinks, dishwasher & light fixtures in kitchen, new toilets, shower stalls, sink w/vanity, & new shower valves; update electrical & plumbing in kitchen & bath. | $44,200 |
| Sep 19, 2014 | Completed final sign-off Jul 2015 | 158 Langton St | exploratory demolition in kitchen ceiling, bath ceiling, the ceilings are currently cracked and sagging, 5/8" drywall will be required to cover 350 sq.ft.; maher n/aDetails
exploratory demolition in kitchen ceiling, bath ceiling, the ceilings are currently cracked and sagging, 5/8" drywall will be required to cover 350 sq.ft.; maher n/a | $3,850 |
| Jan 21, 2014 | Completed final sign-off Dec 2014 | 1510 35th Av | kitchen remodel. remove old cabinets & counter tops & install new cabinets & counter top w/sink. new light fixt in kitchen. bathrm remodel. remove (e) shower stall & construct shower pan & new tile. new shower valve & head in same location. install new fan & light fixts. bath remodel on 2nd fl only.Details
kitchen remodel. remove old cabinets & counter tops & install new cabinets & counter top w/sink. new light fixt in kitchen. bathrm remodel. remove (e) shower stall & construct shower pan & new tile. new shower valve & head in same location. install new fan & light fixts. bath remodel on 2nd fl only. | $32,564 |
| Aug 29, 2008 | Expired or cancelled expired Dec 2009 | 46 Telegraph Pl | remodel small kitchen and bathroom update same electricalDetails
remodel small kitchen and bathroom update same electrical | $28,000 |
| Aug 4, 2008 | Completed final sign-off Nov 2008 | 42 Telegraph Pl | kitchen remodel, small galley kitchen (remodel without permit), includes three base cabinets and three top cabinets, new sink, garbage disposal, dishwasher and countertop, (e) light fixtures to remain.Details
kitchen remodel, small galley kitchen (remodel without permit), includes three base cabinets and three top cabinets, new sink, garbage disposal, dishwasher and countertop, (e) light fixtures to remain. | $10,000 |
| May 23, 2008 | Expired or cancelled expired Dec 2009 | 436 Greenwich St | remodel kitchen and two small bathrooms update some electrical (no structural work).Details
remodel kitchen and two small bathrooms update some electrical (no structural work). | $45,000 |
| Aug 16, 2007 | Completed final sign-off Feb 2008 | 16 Dehon St | kitchen & bathroom remodel. update electrical panel. lights & plugs plumbing. installtion only no changes to bldg.Details
kitchen & bathroom remodel. update electrical panel. lights & plugs plumbing. installtion only no changes to bldg. | $45,000 |
| Apr 30, 2007 | Completed final sign-off Jul 2007 | 25 Guerrero St | unit 301 - kitchen and bath remodel condo. new kitchen cabinets, new cooktop, oven, dishwasher, microwave, hood, tile flooring, new vanity base in bath, new tile, enlarge non-bearing wall and entry way into kitchen.Details
unit 301 - kitchen and bath remodel condo. new kitchen cabinets, new cooktop, oven, dishwasher, microwave, hood, tile flooring, new vanity base in bath, new tile, enlarge non-bearing wall and entry way into kitchen. | $12,000 |