Back to bathroom remodel contractors
American Construction
- Based in
- San Francisco
- On San Francisco permits
- Apr 2007 to Aug 2026
- Last 24 months
- 2 permits filed
55 permits since 2000: 46 completed, 3 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 2 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
23 bathroom remodel permits: 20 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 241 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 10, 2021 | Completed final sign-off Mar 2022 | 14 Dehon St | turn half of (e) mudroom into half bath with in-kind toilet. construct wall with door(3x6) space for half-bath. fill in interior opening to hallway between (e) bath and kitchen to wall. space(31"x 77" area)Details
turn half of (e) mudroom into half bath with in-kind toilet. construct wall with door(3x6) space for half-bath. fill in interior opening to hallway between (e) bath and kitchen to wall. space(31"x 77" area) | $29,200 |
| Apr 16, 2021 | Completed final sign-off Mar 2022 | 14 Dehon St | kitchen and bathroom remodel in kind. replace kitchen cabinets, counter tops & appliances. replace bathroom tub, vanity & toilet. no wall alteration. all work in-kind.Details
kitchen and bathroom remodel in kind. replace kitchen cabinets, counter tops & appliances. replace bathroom tub, vanity & toilet. no wall alteration. all work in-kind. | $30,550 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 3037 Turk Bl | kitchen & bathroom remodel in-kind: nw kitchen caibnets and countertops. new bathroom tile, shower/tub, floor and toilet. install new stackable washer/dryer in (e) closet next to bathroom.Details
kitchen & bathroom remodel in-kind: nw kitchen caibnets and countertops. new bathroom tile, shower/tub, floor and toilet. install new stackable washer/dryer in (e) closet next to bathroom. | $39,500 |
| May 24, 2019 | Completed final sign-off Jul 2020 | 4126 Cabrillo St | kitchen and bath remodel, new kitchen cabinets, update elecrical, remove part of non bearing wall over kitchen counter, construct non bearing wall in kitchen for storage, bath: new toilet, vanity top, power/tub valve, new tile in bathroomDetails
kitchen and bath remodel, new kitchen cabinets, update elecrical, remove part of non bearing wall over kitchen counter, construct non bearing wall in kitchen for storage, bath: new toilet, vanity top, power/tub valve, new tile in bathroom | $26,750 |
| May 9, 2018 | Completed final sign-off Jul 2018 | 260 06th Av | revision to bpa 2017-0801-3562 add shower to half bath @ top floorDetails
revision to bpa 2017-0801-3562 add shower to half bath @ top floor | $3,000 |
| Mar 12, 2018 | Completed final sign-off Sep 2018 | 4173 26th St | 3/f - new half bath . remove extg hall closet for new half bath. update kitchen cabinets, update extg toilet and tub in the extg bathroom. electrical and plumbing permit to be pulled by those trades.Details
3/f - new half bath . remove extg hall closet for new half bath. update kitchen cabinets, update extg toilet and tub in the extg bathroom. electrical and plumbing permit to be pulled by those trades. | $24,000 |
| Aug 1, 2017 | Completed final sign-off Jul 2018 | 260 06th Av | revision to pa #201703081015 (dormers): add bathroom inside rear dormer on north side above existing bathroom. delete dormer on rear south side. relocate approved skylight from rear side to over existing stairs & ending up to attic.Details
revision to pa #201703081015 (dormers): add bathroom inside rear dormer on north side above existing bathroom. delete dormer on rear south side. relocate approved skylight from rear side to over existing stairs & ending up to attic. | $7,500 |
| Apr 19, 2017 | Completed final sign-off Jan 2018 | 277 05th Av | r/r drywall, insulation and light fixtures, fixtures in hallway, bath fans, closet; all damaged from roof leak. in two units.Details
r/r drywall, insulation and light fixtures, fixtures in hallway, bath fans, closet; all damaged from roof leak. in two units. | $7,500 |
| Nov 28, 2016 | Completed final sign-off Jul 2018 | 260 06th Av | unit 260 - (n) half bath, remodel (e) bathroom & kitchen. install (2) windows; unit 262 - (n) half bath, add new master bath. remove fireplace & remodel kitchen, bath. install (2) windows)Details
unit 260 - (n) half bath, remodel (e) bathroom & kitchen. install (2) windows; unit 262 - (n) half bath, add new master bath. remove fireplace & remodel kitchen, bath. install (2) windows) | $55,000 |
| Jul 30, 2015 | Completed final sign-off Jan 2017 | 111 Hahn St | revision to pa #2015.0703.0645 - add new bath at 1st floor, new bath, renovatiion of kitchen, family & bedroom #2, new skylight with parapet on roof.Details
revision to pa #2015.0703.0645 - add new bath at 1st floor, new bath, renovatiion of kitchen, family & bedroom #2, new skylight with parapet on roof. | $47,000 |
| Dec 9, 2014 | Completed final sign-off Jul 2015 | 158 Langton St | new 1/2 bath in closet under stairs unit 160: 54"x 55" area. divide large closet by framing a 54"x 9" wall. use extg closet door for 1/2 bath. reframe staiway framing for nw 28"x6'.8" door for access remainder of closet space. unit #158: upper unit new 1/2 bath in extg closets 34"x5' area.Details
new 1/2 bath in closet under stairs unit 160: 54"x 55" area. divide large closet by framing a 54"x 9" wall. use extg closet door for 1/2 bath. reframe staiway framing for nw 28"x6'.8" door for access remainder of closet space. unit #158: upper unit new 1/2 bath in extg closets 34"x5' area. | $24,250 |
| Oct 16, 2014 | Completed final sign-off Jul 2015 | 158 Langton St | kitchen lighting & control per cec 150(k); remodel (2) kitchens & (2) baths in two-unit building; new cabinets, appliances, sinks, dishwasher & light fixtures in kitchen, new toilets, shower stalls, sink w/vanity, & new shower valves; update electrical & plumbing in kitchen & bath.Details
kitchen lighting & control per cec 150(k); remodel (2) kitchens & (2) baths in two-unit building; new cabinets, appliances, sinks, dishwasher & light fixtures in kitchen, new toilets, shower stalls, sink w/vanity, & new shower valves; update electrical & plumbing in kitchen & bath. | $44,200 |
| Sep 19, 2014 | Completed final sign-off Jul 2015 | 158 Langton St | exploratory demolition in kitchen ceiling, bath ceiling, the ceilings are currently cracked and sagging, 5/8" drywall will be required to cover 350 sq.ft.; maher n/aDetails
exploratory demolition in kitchen ceiling, bath ceiling, the ceilings are currently cracked and sagging, 5/8" drywall will be required to cover 350 sq.ft.; maher n/a | $3,850 |
| Jul 25, 2014 | Completed final sign-off Oct 2014 | 325 Howth St | bathroom remodel, installnew shower/tub valve, new tile on flooring & shower wall. install new fan gfi outlet & switch & light in fan. frame door open 28" between bedroom & bath into wall space.Details
bathroom remodel, installnew shower/tub valve, new tile on flooring & shower wall. install new fan gfi outlet & switch & light in fan. frame door open 28" between bedroom & bath into wall space. | $10,000 |
| Jan 21, 2014 | Completed final sign-off Dec 2014 | 1510 35th Av | kitchen remodel. remove old cabinets & counter tops & install new cabinets & counter top w/sink. new light fixt in kitchen. bathrm remodel. remove (e) shower stall & construct shower pan & new tile. new shower valve & head in same location. install new fan & light fixts. bath remodel on 2nd fl only.Details
kitchen remodel. remove old cabinets & counter tops & install new cabinets & counter top w/sink. new light fixt in kitchen. bathrm remodel. remove (e) shower stall & construct shower pan & new tile. new shower valve & head in same location. install new fan & light fixts. bath remodel on 2nd fl only. | $32,564 |
| Jan 22, 2010 | Completed final sign-off Apr 2010 | 3648 17th St | add new bathroom from existing large closet in main bedroom.Details
add new bathroom from existing large closet in main bedroom. | $22,500 |
| Dec 8, 2008 | Completed final sign-off Feb 2009 | 470 Collingwood St | unit 7 - bath remodel. remove tub and make new shower stall in place. recess light fixture in shower, new tile in shower stall.Details
unit 7 - bath remodel. remove tub and make new shower stall in place. recess light fixture in shower, new tile in shower stall. | $6,000 |
| Aug 29, 2008 | Expired or cancelled expired Dec 2009 | 46 Telegraph Pl | remodel small kitchen and bathroom update same electricalDetails
remodel small kitchen and bathroom update same electrical | $28,000 |
| Jun 4, 2008 | Completed final sign-off Nov 2008 | 42 Telegraph Pl | bathroom remodel in a one bedroom unit. new tub, new toilet, new sink, new tile, ne lighting. comply with title 24Details
bathroom remodel in a one bedroom unit. new tub, new toilet, new sink, new tile, ne lighting. comply with title 24 | $10,000 |
| May 23, 2008 | Expired or cancelled expired Dec 2009 | 436 Greenwich St | remodel kitchen and two small bathrooms update some electrical (no structural work).Details
remodel kitchen and two small bathrooms update some electrical (no structural work). | $45,000 |
| Sep 28, 2007 | Completed final sign-off Feb 2008 | 16 Dehon St | turn a hall closet into a half bath room at 2nd floor to comply with title 24 energy codes.Details
turn a hall closet into a half bath room at 2nd floor to comply with title 24 energy codes. | $6,000 |
| Aug 16, 2007 | Completed final sign-off Feb 2008 | 16 Dehon St | kitchen & bathroom remodel. update electrical panel. lights & plugs plumbing. installtion only no changes to bldg.Details
kitchen & bathroom remodel. update electrical panel. lights & plugs plumbing. installtion only no changes to bldg. | $45,000 |
| Apr 30, 2007 | Completed final sign-off Jul 2007 | 25 Guerrero St | unit 301 - kitchen and bath remodel condo. new kitchen cabinets, new cooktop, oven, dishwasher, microwave, hood, tile flooring, new vanity base in bath, new tile, enlarge non-bearing wall and entry way into kitchen.Details
unit 301 - kitchen and bath remodel condo. new kitchen cabinets, new cooktop, oven, dishwasher, microwave, hood, tile flooring, new vanity base in bath, new tile, enlarge non-bearing wall and entry way into kitchen. | $12,000 |