Back to kitchen remodel contractors
Amer Braz Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2011 to Mar 2018
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2015 | Completed final sign-off Jul 2015 | 199 Collingwood St | new beam need between kitchen & laundry room under existing door & window. replace damage header beam w/strap, msta 36 at ends.Details
new beam need between kitchen & laundry room under existing door & window. replace damage header beam w/strap, msta 36 at ends. | $2,000 |
| Apr 24, 2015 | Completed final sign-off Jul 2015 | 199 Collingwood St | kitchen cabinets replacement sink faucet - kitchen & bath remodel; bathroom - shower valve, tiles, replacement, faucet; laundry - washer/dryer new installation (replacement)Details
kitchen cabinets replacement sink faucet - kitchen & bath remodel; bathroom - shower valve, tiles, replacement, faucet; laundry - washer/dryer new installation (replacement) | $31,000 |
| Feb 4, 2013 | Completed final sign-off Jun 2013 | 1870 Pacific Av | unit #204-kitchen remodel-sink, plumbing, cabinets, tiles. non structural, bathrm tiles, sink, new fl tiles, toilet replacement. replacement of circuit breaker box. replace dishwasher & washing machine pipes as needed. faucets for bathrm, tub, sink, emerg shut-off valve. lighting per cec 150 (k)Details
unit #204-kitchen remodel-sink, plumbing, cabinets, tiles. non structural, bathrm tiles, sink, new fl tiles, toilet replacement. replacement of circuit breaker box. replace dishwasher & washing machine pipes as needed. faucets for bathrm, tub, sink, emerg shut-off valve. lighting per cec 150 (k) | $15,000 |
| Dec 13, 2012 | Completed final sign-off Apr 2013 | 1870 Pacific Av | unit #703: kitchen- sink & counter top, replace tiles, cabinets. toilet- replace sink, replace all tiles, no structural work. replace circuit breaker boxDetails
unit #703: kitchen- sink & counter top, replace tiles, cabinets. toilet- replace sink, replace all tiles, no structural work. replace circuit breaker box | $18,000 |