Back to bathroom remodel contractors
Amer Braz Construction
- Based in
- San Francisco
- On San Francisco permits
- Jun 2011 to Mar 2018
- Last 24 months
- 0 permits filed
14 permits since 2000: 12 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
2 bathroom remodel permits: 2 completed. Typically 2 days from filing to permit and 107 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2015 | Completed final sign-off Jul 2015 | 199 Collingwood St | kitchen cabinets replacement sink faucet - kitchen & bath remodel; bathroom - shower valve, tiles, replacement, faucet; laundry - washer/dryer new installation (replacement)Details
kitchen cabinets replacement sink faucet - kitchen & bath remodel; bathroom - shower valve, tiles, replacement, faucet; laundry - washer/dryer new installation (replacement) | $31,000 |
| Jun 10, 2011 | Completed final sign-off Oct 2011 | 811 Clayton St | repartition of (e) master bedroom into two small bedrooms. master bath remodelling . all work at 2nd floorDetails
repartition of (e) master bedroom into two small bedrooms. master bath remodelling . all work at 2nd floor | $25,000 |