Block 2695, lot 019
4134 19th St
- City’s use
- Multi-Family Residential
- Built
- 1890
- Stories
- 2
- Units
- 3
- Rooms
- 6 bedrooms, 3 bathrooms
- Building
- 3,876 sq ft
- Lot
- 3,149 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
28 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2018 | Completed final sign-off Jun 2018 | 4134 19th St | administrative permit to reflect legal use & occupancy as single-family dwelling over a (2)-car garage. based on site visit & city records (building department, assessors' & water department)Details
administrative permit to reflect legal use & occupancy as single-family dwelling over a (2)-car garage. based on site visit & city records (building department, assessors' & water department) | ||
| Jun 25, 2018 | Completed final sign-off Jun 2018 | 197 Collingwood St | administrative permit to reflect legal use & occupancy of this bld as a 2 unit residential bld. based on site visit & city documents (building department, assessors' & water department)Details
administrative permit to reflect legal use & occupancy of this bld as a 2 unit residential bld. based on site visit & city documents (building department, assessors' & water department) | ||
| Jun 15, 2017 | Completed final sign-off Jul 2017 | 197 Collingwood St | revision to pa #201608154984, convert basement into legal garage. this permit is to underpin 22 lf of existing foundation (front building)Details
revision to pa #201608154984, convert basement into legal garage. this permit is to underpin 22 lf of existing foundation (front building) | $6,000 | |
| Jun 1, 2017 | Never finaled issued Jun 2017, no final | 197 Collingwood St | street space | ||
| Apr 20, 2017 | Never finaled issued Apr 2017, no final | 197 Collingwood St | street space | ||
| Aug 15, 2016 | Completed final sign-off Jul 2017 | 197 Collingwood St | Amer Braz Construction | remove interior columns @ basement, add garage door, replace part of perimeter foundation, replace shear wall with moment frame.Details
remove interior columns @ basement, add garage door, replace part of perimeter foundation, replace shear wall with moment frame. | $50,000 |
| Jun 5, 2015 | Completed final sign-off Jul 2015 | 199 Collingwood St | Amer Braz Construction | new beam need between kitchen & laundry room under existing door & window. replace damage header beam w/strap, msta 36 at ends.Details
new beam need between kitchen & laundry room under existing door & window. replace damage header beam w/strap, msta 36 at ends. | $2,000 |
| Apr 24, 2015 | Completed final sign-off Jul 2015 | 199 Collingwood St | Amer Braz Construction | kitchen cabinets replacement sink faucet - kitchen & bath remodel; bathroom - shower valve, tiles, replacement, faucet; laundry - washer/dryer new installation (replacement)Details
kitchen cabinets replacement sink faucet - kitchen & bath remodel; bathroom - shower valve, tiles, replacement, faucet; laundry - washer/dryer new installation (replacement) | $31,000 |
| Jan 3, 2014 | Never finaled issued Jan 2014, no final | 197 Collingwood St | sidewalk repair only | ||
| Nov 21, 2013 | Never finaled issued Nov 2013, no final | 197 Collingwood St | street space permit | ||
| Aug 26, 2013 | Completed final sign-off Oct 2013 | 197 Collingwood St | Arnest Termite Control | item 1 of spcb report dated 8/13/13/report #6297b4-repair dry rot & perform voluntary structural strengthening as per plans. no habitable space being addedDetails
item 1 of spcb report dated 8/13/13/report #6297b4-repair dry rot & perform voluntary structural strengthening as per plans. no habitable space being added | $25,000 |
| Jun 18, 2013 | Completed final sign-off Jul 2013 | 197 Collingwood St | Arnest Termite Control | arnest termite report # 6021b4 item #2 ony 2 raise the foundation level at the rear & left rear corner, 8" cap w/j" bolts & rebarDetails
arnest termite report # 6021b4 item #2 ony 2 raise the foundation level at the rear & left rear corner, 8" cap w/j" bolts & rebar | $6,500 |
| Jun 18, 2013 | Completed final sign-off Jul 2013 | 4134 19th St | Arnest Termite Control | arnetst termite report # 6022b4, item #2 only 2 repiar fungal damage & install a reinforced concrete foundation cap. 8"cap w/ j bolts & rebarsDetails
arnetst termite report # 6022b4, item #2 only 2 repiar fungal damage & install a reinforced concrete foundation cap. 8"cap w/ j bolts & rebars | $17,000 |
| May 30, 2007 | Completed final sign-off Oct 2007 | 197 Collingwood St | replace front staircase "in kind" wood for wood. less than 50% of (e) stairs effected.Details
replace front staircase "in kind" wood for wood. less than 50% of (e) stairs effected. | $2,500 | |
| Mar 2, 2007 | Never finaled issued Mar 2007, no final | 197 Collingwood St | renewal pa 200602084154 for final inspectionDetails
renewal pa 200602084154 for final inspection | ||
| Feb 8, 2006 | Expired or cancelled cancelled Oct 2007 | 197 Collingwood St | remodel kitchen & bathroom no structural .67 u factor replace windows all around, in kind wood for wood-no structural workDetails
remodel kitchen & bathroom no structural .67 u factor replace windows all around, in kind wood for wood-no structural work | $25,000 | |
| Oct 27, 2005 | Completed final sign-off Nov 2005 | 197 Collingwood St | repair front stairs/delete electrical upgrade and repair of rear stairs to revised app #200510196037Details
repair front stairs/delete electrical upgrade and repair of rear stairs to revised app #200510196037 | ||
| Oct 19, 2005 | Completed final sign-off Nov 2005 | 199 Collingwood St | renew pa applicaton no 200103204684Details
renew pa applicaton no 200103204684 | $4,000 | |
| Sep 23, 2005 | Completed final sign-off Oct 2005 | 4134 19th St | Alvarez Construction | renewal pa# 2004/03/22/9264 for final.Details
renewal pa# 2004/03/22/9264 for final. | |
| Jun 7, 2005 | Completed final sign-off Jun 2005 | 197 Collingwood St | New High Protection Roofing | tear off existing plywood osb 1/2", layer shingles 30 yr, layer 30lbDetails
tear off existing plywood osb 1/2", layer shingles 30 yr, layer 30lb | $7,000 |
| Mar 14, 2005 | Completed final sign-off Mar 2005 | 4134 19th St | Ricardo Roofing | reroofingDetails
reroofing | $4,800 |
| Jan 26, 2005 | Never finaled issued Jan 2005, no final | 197 Collingwood St | correct nov 200008796. repair holes in wall. legalize bathroom.Details
correct nov 200008796. repair holes in wall. legalize bathroom. | $850 | |
| Jul 7, 2004 | Expired or cancelled expired Dec 2006 | 197 Collingwood St | replace defective rear staricase in kindDetails
replace defective rear staricase in kind | $10,000 | |
| Mar 22, 2004 | Never finaled issued Mar 2004, no final | 4134 19th St | Alvarez Construction | complete kitchen upgrade (cabinet/plumbing/elec/flooring)also upgrade 2nd bath.no structural workDetails
complete kitchen upgrade (cabinet/plumbing/elec/flooring)also upgrade 2nd bath.no structural work | $30,000 |
| Oct 1, 2003 | Never finaled issued Oct 2003, no final | 4134 19th St | Alvarez Construction | demo water damaged shower wall & bathrm floor update rough & finish plumbing install drywall green uDetails
demo water damaged shower wall & bathrm floor update rough & finish plumbing install drywall green u | $7,500 |
| Feb 28, 2003 | Expired or cancelled cancelled Mar 2004 | 197 Collingwood St | American Marketing Systems Inc. | comply w/n.o.v 200008796 replace rear stair case & attached sun rooms. 199 collingewood bathroom . iDetails
comply w/n.o.v 200008796 replace rear stair case & attached sun rooms. 199 collingewood bathroom . i | $50,000 |
| Mar 20, 2001 | Expired or cancelled expired Sep 2001 | 199 Collingwood St | electrical upgrade. repair front & rear stairs.Details
electrical upgrade. repair front & rear stairs. | $8,000 | |
| Apr 19, 2000 | Expired or cancelled cancelled Jan 2026 | 197 Collingwood St | street space use |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Alvarez Construction (3), Amer Braz Construction (3), Arnest Termite Control (3), American Marketing Systems Inc., New High Protection Roofing, Ricardo Roofing
- Engineers
- Eric Cox (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.