Back to kitchen remodel contractors
Altman & Co General Contractors
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Jan 2023
- Last 24 months
- 0 permits filed
32 permits since 2000: 22 completed, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
7 kitchen remodel permits: 5 completed, 2 expired or cancelled. Typically 4 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2021 | Completed final sign-off Nov 2022 | 107 Alta St | interior remodel at 2nd and 3rd levels. bathroom remodel with 1 window replace in kind. kitchen remodel with minor electrical at area of work. no structural workDetails
interior remodel at 2nd and 3rd levels. bathroom remodel with 1 window replace in kind. kitchen remodel with minor electrical at area of work. no structural work | $25,000 |
| Oct 26, 2018 | Completed final sign-off Jun 2019 | 2919 California St | interior finish: refinish floors, painting interior; install new wood trim, install new water heater, install plumbing fixtures/bath/powder/install new kitchen bar top, elec: power to wather heater, non structural work. 98% efficiency. provide gsv, gas vent per cmc 802.6 sfmc 8026.2Details
interior finish: refinish floors, painting interior; install new wood trim, install new water heater, install plumbing fixtures/bath/powder/install new kitchen bar top, elec: power to wather heater, non structural work. 98% efficiency. provide gsv, gas vent per cmc 802.6 sfmc 8026.2 | $70,000 |
| Jul 31, 2014 | Completed final sign-off Dec 2016 | 227 27th St | to remove a rear portion of (e) 2-story house. to add new 2-story addition with kitchen & master suite & new deck over living space.Details
to remove a rear portion of (e) 2-story house. to add new 2-story addition with kitchen & master suite & new deck over living space. | $150,000 |
| Feb 16, 2012 | Completed final sign-off Jun 2012 | 2230 Green St | remove and replace wood damaged wall and ceiling coverings with new sheetrock at 2nd and 3rd flr kitchens; 2nd and 3rd flr stair hallwaysDetails
remove and replace wood damaged wall and ceiling coverings with new sheetrock at 2nd and 3rd flr kitchens; 2nd and 3rd flr stair hallways | $4,000 |
| Feb 22, 2008 | Expired or cancelled expired Jan 2010 | 908 Douglass St | remodel kitchen and bathroom on the 2nd floor. remove wall between living room and kitchen and replace with overhead beam.Details
remodel kitchen and bathroom on the 2nd floor. remove wall between living room and kitchen and replace with overhead beam. | $25,000 |
| Feb 15, 2008 | Completed final sign-off May 2008 | 435 Clipper St | kitchen remodel. remove cabinets & counters. replace windows. add 1 lam over new island, add 6 recessed cans, add lv lighting under cabinets.Details
kitchen remodel. remove cabinets & counters. replace windows. add 1 lam over new island, add 6 recessed cans, add lv lighting under cabinets. | $45,000 |
| Feb 7, 2006 | Expired or cancelled expired Jan 2008 | 2524 Broadway | kitchen and master bedroom. renovation, selective renovation thru out unit, addition of one skylite (flat) and two windows, selective replacement of rear windows.Details
kitchen and master bedroom. renovation, selective renovation thru out unit, addition of one skylite (flat) and two windows, selective replacement of rear windows. | $250,000 |