Back to bathroom remodel contractors
Altman & Co General Contractors
- Based in
- San Francisco
- On San Francisco permits
- Feb 2006 to Jan 2023
- Last 24 months
- 0 permits filed
32 permits since 2000: 22 completed, 6 never finaled, 4 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 5 completed, 2 expired or cancelled. Typically 6 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 2, 2021 | Completed final sign-off Nov 2022 | 107 Alta St | interior remodel at 2nd and 3rd levels. bathroom remodel with 1 window replace in kind. kitchen remodel with minor electrical at area of work. no structural workDetails
interior remodel at 2nd and 3rd levels. bathroom remodel with 1 window replace in kind. kitchen remodel with minor electrical at area of work. no structural work | $25,000 |
| Mar 4, 2020 | Expired or cancelled expired Feb 2023 | 107 Alta St | revision to 201912230363 add media room at garage level. remodel bath. replace fixtures, materials and finishes,add 1 new sink replace e concrete slab new wood flooringDetails
revision to 201912230363 add media room at garage level. remodel bath. replace fixtures, materials and finishes,add 1 new sink replace e concrete slab new wood flooring | $20,000 |
| Mar 12, 2019 | Completed final sign-off Jun 2019 | 60 Cragmont Av | repair damage to 3 bathrooms from lear at top floor, bathroomsremain @ (e) size and location 3 bahts at 7x8 :+/-Details
repair damage to 3 bathrooms from lear at top floor, bathroomsremain @ (e) size and location 3 bahts at 7x8 :+/- | $65,000 |
| Oct 26, 2018 | Completed final sign-off Jun 2019 | 2919 California St | interior finish: refinish floors, painting interior; install new wood trim, install new water heater, install plumbing fixtures/bath/powder/install new kitchen bar top, elec: power to wather heater, non structural work. 98% efficiency. provide gsv, gas vent per cmc 802.6 sfmc 8026.2Details
interior finish: refinish floors, painting interior; install new wood trim, install new water heater, install plumbing fixtures/bath/powder/install new kitchen bar top, elec: power to wather heater, non structural work. 98% efficiency. provide gsv, gas vent per cmc 802.6 sfmc 8026.2 | $70,000 |
| Mar 27, 2009 | Completed final sign-off Jan 2010 | 1854 Grant Av | replace e aluminum windows with new aluminum, double glazed. remove 1 window. reroof with new r30 insulation in kind. bath remodel 3rd fl, built in bookcase in bedroom, new radiant thermaboard floors in office, bedroom, upper bath, new garage door.Details
replace e aluminum windows with new aluminum, double glazed. remove 1 window. reroof with new r30 insulation in kind. bath remodel 3rd fl, built in bookcase in bedroom, new radiant thermaboard floors in office, bedroom, upper bath, new garage door. | $85,000 |
| Feb 18, 2009 | Completed final sign-off Jul 2009 | 490 Castenada Av | remove sink, remove/relocate toilet, remove basement window. install shower, frameless temp glass shower, doors, walls, toilet, corner sink, wall sconces. relocate gfi outlets. tile shower walls & floor. tile floor, paint bathroom, install recessed ceiling lightsDetails
remove sink, remove/relocate toilet, remove basement window. install shower, frameless temp glass shower, doors, walls, toilet, corner sink, wall sconces. relocate gfi outlets. tile shower walls & floor. tile floor, paint bathroom, install recessed ceiling lights | $35,000 |
| Feb 22, 2008 | Expired or cancelled expired Jan 2010 | 908 Douglass St | remodel kitchen and bathroom on the 2nd floor. remove wall between living room and kitchen and replace with overhead beam.Details
remodel kitchen and bathroom on the 2nd floor. remove wall between living room and kitchen and replace with overhead beam. | $25,000 |