Back to kitchen remodel contractors
Ak Brady Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2013 to Nov 2024
- Last 24 months
- 1 permit filed
40 permits since 2000: 28 completed, 1 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 7 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 149 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 23, 2023 | Completed final sign-off Mar 2024 | 103 Grattan St | unit #105: one bathroom and one kitchen remodel - in line kind remodel. upgrade electrical cans/lights. (n) interior doors.Details
unit #105: one bathroom and one kitchen remodel - in line kind remodel. upgrade electrical cans/lights. (n) interior doors. | $30,000 |
| Apr 27, 2023 | Completed final sign-off Jul 2023 | 2710 Cabrillo St | unit 304: remodel 1 bathroom and 1 kitchen - like in kind. new cabinets, tile, and stove. non structuralDetails
unit 304: remodel 1 bathroom and 1 kitchen - like in kind. new cabinets, tile, and stove. non structural | $20,000 |
| Dec 10, 2021 | Completed final sign-off Aug 2022 | 1080 Shotwell St | #4. interior remodel in kind: one kitchen one bathroom remodel, new plumbing fixtures in (e) locations, new ceiling lights, new cabinets new flooring througut no relocation of wallsDetails
#4. interior remodel in kind: one kitchen one bathroom remodel, new plumbing fixtures in (e) locations, new ceiling lights, new cabinets new flooring througut no relocation of walls | $25,000 |
| Nov 1, 2018 | Expired or cancelled expired Apr 2023 | 575 Belvedere St | per boa# 18-100, dated 10/23/2018. revise site pa# 201608266097s: change proposed 2 car garage into 1 car garage. add a bedroom @ lower level. change a door leading from previous 2 car garage to a bedroom window. add window to kitchen on middle level. make minor changes to window sizes &Details
per boa# 18-100, dated 10/23/2018. revise site pa# 201608266097s: change proposed 2 car garage into 1 car garage. add a bedroom @ lower level. change a door leading from previous 2 car garage to a bedroom window. add window to kitchen on middle level. make minor changes to window sizes & | $9,000 |
| Jun 12, 2018 | Expired or cancelled expired Sep 2019 | 1223 44th Av | unit c & d. kitchens & bathrooms remodel in both units. replace cabinets, stone & counter tops w/ like kind. both kitchens 10'x9'. both bathrooms 8'x 5 1/2'Details
unit c & d. kitchens & bathrooms remodel in both units. replace cabinets, stone & counter tops w/ like kind. both kitchens 10'x9'. both bathrooms 8'x 5 1/2' | $90,000 |
| Jun 12, 2018 | Completed final sign-off Mar 2019 | 1080 Shotwell St | unit#3 kitchen & bathroom remodel. replace cabinets & fixts w/ like kind. kitchen 8'x 10'. bathroom 7'x 6'Details
unit#3 kitchen & bathroom remodel. replace cabinets & fixts w/ like kind. kitchen 8'x 10'. bathroom 7'x 6' | $45,000 |
| Dec 2, 2015 | Completed final sign-off Apr 2016 | 1026 Cole St | remodel kitchen and 2 baths with like kind fixtures and additonal trim and flooring and tileDetails
remodel kitchen and 2 baths with like kind fixtures and additonal trim and flooring and tile | $50,000 |
| Apr 10, 2015 | Completed final sign-off May 2016 | 2128 15th St | horizotal addition: 3 story addition at west (side of building) 8'-7" x 7'-0" to include: larger bedroom and kitchen. (1) dormer at roof.Details
horizotal addition: 3 story addition at west (side of building) 8'-7" x 7'-0" to include: larger bedroom and kitchen. (1) dormer at roof. | $108,000 |
| Feb 18, 2015 | Completed final sign-off May 2016 | 2128 15th St | remodel both kitchens and bathrooms and interior trims. no structural work. kitchen size 10'x15' ea . bathroom 5'x8' eaDetails
remodel both kitchens and bathrooms and interior trims. no structural work. kitchen size 10'x15' ea . bathroom 5'x8' ea | $71,132 |
| Aug 28, 2014 | Never finaled issued Sep 2014, no final | 1022 Cole St | remodel top floor (third floor) unit: add one new master bathroom and laundry, remodel (e) toilet and bath, relocation of kitchen, convert sitting room into new bedroom per plan. new recessed ceiling cans and dimmers and new hardwood flooring.Details
remodel top floor (third floor) unit: add one new master bathroom and laundry, remodel (e) toilet and bath, relocation of kitchen, convert sitting room into new bedroom per plan. new recessed ceiling cans and dimmers and new hardwood flooring. | $85,000 |