Ak Brady Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2013 to Nov 2024
- Last 24 months
- 1 permit filed
40 permits since 2000: 28 completed, 1 in progress, 6 never finaled, 5 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 165 days from filing to permit and 344 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 21, 2024 | Completed final sign-off Jun 2024 | 2136 15th St | revision to pa 201706028312 per inspector's request add toilet @ 1st floor laundry room; relocated interior fireplace to exterior @ 3rd fl deck; add sink @ 3rd fl deck; add heaters @ both 3rd fl decksDetails
revision to pa 201706028312 per inspector's request add toilet @ 1st floor laundry room; relocated interior fireplace to exterior @ 3rd fl deck; add sink @ 3rd fl deck; add heaters @ both 3rd fl decks | $5,000 |
| Oct 8, 2014 | Completed final sign-off Apr 2017 | 555 29th St | convert(e) basement into (n)laundry,guest bath,playrm,&mstr bath.add(n)mstr bedrm under (e)family rm.add(n)guest bedrm in bsmt level w/ deck above.add(n)internal stair to bsmt.renovate powder rm on 1st fl. modify entry.Details
convert(e) basement into (n)laundry,guest bath,playrm,&mstr bath.add(n)mstr bedrm under (e)family rm.add(n)guest bedrm in bsmt level w/ deck above.add(n)internal stair to bsmt.renovate powder rm on 1st fl. modify entry. | $215,000 |