Aguilar Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2021 to Sep 2026
- Last 24 months
- 20 permits filed
25 permits since 2000: 23 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 0 days from filing to permit and 30 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 7, 2026 | Completed final sign-off Aug 2026 | 1047 York St | landing stair repair front of bldg, less than 50% of stair, street facing, stucco reapir around garage, garage door replacement, front of bldg, street facing.Details
landing stair repair front of bldg, less than 50% of stair, street facing, stucco reapir around garage, garage door replacement, front of bldg, street facing. | $8,500 |
| Mar 31, 2026 | Completed final sign-off Apr 2026 | 536 Alvarado St | replace stairs to storage attic, prefabricate.Details
replace stairs to storage attic, prefabricate. | $5,700 |
| Dec 2, 2024 | Completed final sign-off Dec 2024 | 2344 Jones St | in the back of the building; replace door, replace 4 threads of stairs, repair and paint 4x4 realing redwood post railing.Details
in the back of the building; replace door, replace 4 threads of stairs, repair and paint 4x4 realing redwood post railing. | $1,850 |
| Feb 23, 2021 | Completed final sign-off Apr 2023 | 354 Bradford St | addition of 2 (n) dormers to (e) attic. add (n) interior spiral staircase connect attic & 1st flr. add ductless mini split for attic. add (n) windows at proposed dormers, replace 2 windows in (e) openings 1 front & 1 rear attic, add (n) wall at attic to create storageDetails
addition of 2 (n) dormers to (e) attic. add (n) interior spiral staircase connect attic & 1st flr. add ductless mini split for attic. add (n) windows at proposed dormers, replace 2 windows in (e) openings 1 front & 1 rear attic, add (n) wall at attic to create storage | $80,000 |