Back to bathroom remodel contractors
Aguilar Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2021 to Sep 2026
- Last 24 months
- 20 permits filed
25 permits since 2000: 23 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
5 bathroom remodel permits: 4 completed, 1 in progress. Typically 0 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2026 | In progress issued Jul 2026 | 167 Park St | front bldg: bathroom remodeling, bathroom rewire and new subpanel, kitchen remodel, half bathroom remodel, replace 4 doors, replace sliding door, install new plywood in basement. all work interior. 1 tub to shower conversion. door replacement in kind, no change to opening or operation.Details
front bldg: bathroom remodeling, bathroom rewire and new subpanel, kitchen remodel, half bathroom remodel, replace 4 doors, replace sliding door, install new plywood in basement. all work interior. 1 tub to shower conversion. door replacement in kind, no change to opening or operation. | $46,000 |
| May 1, 2026 | Completed final sign-off Jul 2026 | 2060 Sutter St | unit 503: kitchen and bathroom remodel, replace counter tops, carpet, lights switches. replace 4 interior doors in unit, replace p traps, replace kitchen faucet, 2 fan replacements, new tiles in bathroom.Details
unit 503: kitchen and bathroom remodel, replace counter tops, carpet, lights switches. replace 4 interior doors in unit, replace p traps, replace kitchen faucet, 2 fan replacements, new tiles in bathroom. | $50,000 |
| Mar 10, 2026 | Completed final sign-off Jul 2026 | 348 Nevada St | bathroom remodel, replace tub to shower only. replace (3) front windows, in kind u factor 0.27 maxDetails
bathroom remodel, replace tub to shower only. replace (3) front windows, in kind u factor 0.27 max | $6,500 |
| Oct 27, 2025 | Completed final sign-off Jul 2026 | 628 Los Palmos Dr | remodel of kitchen and 2 bathroom. upgrade eelectrical panel, paint exterior and interior house. new cabinets in the kitchem, install flooring, replace 5 sliding doors, replace 10 interior doors, replace deck surface, new furnace, new tankless water heater.Details
remodel of kitchen and 2 bathroom. upgrade eelectrical panel, paint exterior and interior house. new cabinets in the kitchem, install flooring, replace 5 sliding doors, replace 10 interior doors, replace deck surface, new furnace, new tankless water heater. | $150,000 |
| Jun 24, 2025 | Completed final sign-off Jun 2026 | 1045 York St | front bldg: bathroom remodeling: framing, electrical, plumbing, 2 windows replacement (in kind) at rear, painting, new drywall, insulation. no removal of wallsDetails
front bldg: bathroom remodeling: framing, electrical, plumbing, 2 windows replacement (in kind) at rear, painting, new drywall, insulation. no removal of walls | $22,150 |