Aguilar Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2021 to Sep 2026
- Last 24 months
- 20 permits filed
25 permits since 2000: 23 completed, 2 in progress.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
1 deck permit: 1 completed. Typically 0 days from filing to permit and 269 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 27, 2025 | Completed final sign-off Jul 2026 | 628 Los Palmos Dr | remodel of kitchen and 2 bathroom. upgrade eelectrical panel, paint exterior and interior house. new cabinets in the kitchem, install flooring, replace 5 sliding doors, replace 10 interior doors, replace deck surface, new furnace, new tankless water heater.Details
remodel of kitchen and 2 bathroom. upgrade eelectrical panel, paint exterior and interior house. new cabinets in the kitchem, install flooring, replace 5 sliding doors, replace 10 interior doors, replace deck surface, new furnace, new tankless water heater. | $150,000 |