Back to bathroom remodel contractors
Acme Builders
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Jul 2026
- Last 24 months
- 13 permits filed
135 permits since 2000: 83 completed, 12 in progress, 28 never finaled, 12 expired or cancelled.
Of the 28 never-finaled permits, 10 are 5 to 10 years old, 18 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
46 bathroom remodel permits: 26 completed, 3 in progress, 13 never finaled, 4 expired or cancelled. Typically 0 days from filing to permit and 92 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 19, 2026 | In progress issued Feb 2026 | 4220 Cesar Chavez St | unit 314: replace bathroom: vanity, toilet and vanity light.Details
unit 314: replace bathroom: vanity, toilet and vanity light. | $28,000 |
| Jan 26, 2026 | In progress issued Feb 2026 | 1178 Vallejo St | in kind remodel of (e) kitchen and (e) bath.Details
in kind remodel of (e) kitchen and (e) bath. | $75,000 |
| Jan 26, 2026 | Completed final sign-off Apr 2026 | 4220 Cesar Chavez St | unit#318: to comply with nov#202548814, water damage repair, in kind (e) bathroom remodel. (items #4 & 5)Details
unit#318: to comply with nov#202548814, water damage repair, in kind (e) bathroom remodel. (items #4 & 5) | $45,000 |
| Nov 20, 2025 | Completed final sign-off Feb 2026 | 2301 Kirkham St | bathroom remodel 2nd fl, in kind replacement of tub, toilet, and fixturesDetails
bathroom remodel 2nd fl, in kind replacement of tub, toilet, and fixtures | $40,000 |
| Oct 16, 2024 | In progress issued Oct 2024 | 37 States St | unit #12- dryrot repair in bathroom. remove tub, shower surround and sub floor. replace in kind. 60 sq ft. no wall demolition or construction.Details
unit #12- dryrot repair in bathroom. remove tub, shower surround and sub floor. replace in kind. 60 sq ft. no wall demolition or construction. | $12,000 |
| Dec 5, 2022 | Completed final sign-off Mar 2023 | 1610 Sutter St | nov #202297673 correction for unit 301. ground floor retail unit. bring bathroom up to current code in 301. open ceiling in retail unit verify no `Details
nov #202297673 correction for unit 301. ground floor retail unit. bring bathroom up to current code in 301. open ceiling in retail unit verify no ` | $15,000 |
| Jul 12, 2022 | Completed final sign-off Aug 2022 | 1975 Filbert St | remodel one bathroom, in-kind. retile shower floor. new vanity & fixtures. non strucutral.Details
remodel one bathroom, in-kind. retile shower floor. new vanity & fixtures. non strucutral. | $12,000 |
| Mar 14, 2022 | Completed final sign-off Aug 2022 | 445 Hugo St | unit 1: kitchen and bathroom remodel in kind.Details
unit 1: kitchen and bathroom remodel in kind. | $30,000 |
| Jul 9, 2020 | Completed final sign-off Feb 2021 | 329 San Jose Av | remodel bathroom in-kind, upgrade electrical, galvanized to copperDetails
remodel bathroom in-kind, upgrade electrical, galvanized to copper | $12,000 |
| Jun 4, 2019 | Completed final sign-off Oct 2019 | 300 Green St | abatement of complaint #201931562, 201947283. kitchen and bathroom remodel/alteration at unit#1. abatement of complaint #201931563 and 201947285Details
abatement of complaint #201931562, 201947283. kitchen and bathroom remodel/alteration at unit#1. abatement of complaint #201931563 and 201947285 | $6,000 |
| Apr 22, 2019 | Completed final sign-off Jul 2019 | 2999 California St | unit # 404 ,new tile in shower tub surround replace bathtub new vanity light tile flooring, bathroom area 15 sq ftDetails
unit # 404 ,new tile in shower tub surround replace bathtub new vanity light tile flooring, bathroom area 15 sq ft | $7,500 |
| Mar 27, 2019 | Never finaled issued Apr 2019, no final | 1618 Polk St | apt 14: update kitchen: new cabinets, flooring, sink, countertops. bathroom: new shower pan, tile, vanity, mirrior. all inkind remodel ofkitchen & bathroom. no walls modified or altered.Details
apt 14: update kitchen: new cabinets, flooring, sink, countertops. bathroom: new shower pan, tile, vanity, mirrior. all inkind remodel ofkitchen & bathroom. no walls modified or altered. | $10,000 |
| Dec 1, 2017 | Never finaled issued Dec 2017, no final | 1275 02nd Av | #3, #4- remodel kitchen & bathroom in kind, upgrade electrical, add panel in unit, update plumbing from galvanized to copper, repair dry rotted headers next to living room above doorways, repair in kind.Details
#3, #4- remodel kitchen & bathroom in kind, upgrade electrical, add panel in unit, update plumbing from galvanized to copper, repair dry rotted headers next to living room above doorways, repair in kind. | $30,000 |
| Oct 17, 2017 | Completed final sign-off Dec 2017 | 754 Athens St | remodel bathroom on 2nd level, new tile, flooring, update shower valve, painting. no change in walls & openings & layout.Details
remodel bathroom on 2nd level, new tile, flooring, update shower valve, painting. no change in walls & openings & layout. | $10,000 |
| Sep 29, 2017 | Never finaled issued Oct 2017, no final | 1175 Francisco St | leak repair- remove & replace kitchen & bathroom in both 11 & 7. kitchen & bath in kind. update electrical & plumbing to current code when walls & ceiling open, repair dryrot (if any). repairs in kind.Details
leak repair- remove & replace kitchen & bathroom in both 11 & 7. kitchen & bath in kind. update electrical & plumbing to current code when walls & ceiling open, repair dryrot (if any). repairs in kind. | $60,000 |
| Sep 12, 2017 | Completed final sign-off Jan 2018 | 486 12th Av | kitchen remodel: change counters in-kind, new doors in half-bathroom. bathroom remodel, new shwer pan, vanity, flooring.Details
kitchen remodel: change counters in-kind, new doors in half-bathroom. bathroom remodel, new shwer pan, vanity, flooring. | $12,000 |
| Jul 20, 2017 | Expired or cancelled cancelled Aug 2017 | 1780 11th Av | revision to app. 32017-06-23-0225, same bath remodel. add switches to plugs, repair waste line under tub, new shower valve.Details
revision to app. 32017-06-23-0225, same bath remodel. add switches to plugs, repair waste line under tub, new shower valve. | $2,500 |
| Jun 23, 2017 | Completed final sign-off Sep 2017 | 1780 11th Av | remodel bathroom in kind, same foot print, new tile flooring, new tile in shower, cancel jacuzzi tub, replace with non jaccuzzi tub, new vanity, add plugs.Details
remodel bathroom in kind, same foot print, new tile flooring, new tile in shower, cancel jacuzzi tub, replace with non jaccuzzi tub, new vanity, add plugs. | $8,000 |
| Jan 31, 2017 | Expired or cancelled cancelled Jan 2026 | 1275 02nd Av | unit #2: update (1) kitchen, new cabinets counter in kind 12x12. update (1) bathroom, new tub, tile, fixtures, in kinds, dry rot repair 8x10; update electrical,Details
unit #2: update (1) kitchen, new cabinets counter in kind 12x12. update (1) bathroom, new tub, tile, fixtures, in kinds, dry rot repair 8x10; update electrical, | $18,000 |
| Dec 14, 2016 | Completed final sign-off Apr 2017 | 1611 Vallejo St | units #402 & #202: remodel kitchen (2) 10x4 single row cabinets; remodel bathrooms (2) in-kind 6x4 retile, new vanity, toiletsDetails
units #402 & #202: remodel kitchen (2) 10x4 single row cabinets; remodel bathrooms (2) in-kind 6x4 retile, new vanity, toilets | $30,000 |
| Apr 13, 2016 | Never finaled issued Jun 2016, no final | 1611 Vallejo St | remodel kitchen units 103 and 304 in kind - new cabinets, flooring countertop 55 sq. ft ea. remodel bathrooms units 103 and 304 in kind - new floor tile, vanity, toilet, shower, valve, tub 30 sq. ft ea.Details
remodel kitchen units 103 and 304 in kind - new cabinets, flooring countertop 55 sq. ft ea. remodel bathrooms units 103 and 304 in kind - new floor tile, vanity, toilet, shower, valve, tub 30 sq. ft ea. | $25,000 |
| Jan 19, 2016 | Never finaled issued Jun 2016, no final | 1618 Polk St | #7- update kitchen, new cabinets, floor tile, countertop, update bathroom, new shower stall, floor, tub. all in kind.Details
#7- update kitchen, new cabinets, floor tile, countertop, update bathroom, new shower stall, floor, tub. all in kind. | $15,000 |
| Jan 19, 2016 | Completed final sign-off Jun 2016 | 2388 48th Av | update kitchen, new cabinets, floor tile, countertop, update bathroom, new shower stall, floor, tub. all in kind.Details
update kitchen, new cabinets, floor tile, countertop, update bathroom, new shower stall, floor, tub. all in kind. | $15,000 |
| Dec 4, 2015 | Completed final sign-off Apr 2016 | 25 Glendale St | work in unit #7: remodel kitchen - cabinets, countertops, flooring, remodel bathroom - cabinets, tub, flooring, like for like.Details
work in unit #7: remodel kitchen - cabinets, countertops, flooring, remodel bathroom - cabinets, tub, flooring, like for like. | $15,000 |
| Nov 16, 2015 | Completed final sign-off Mar 2016 | 2 Church St | work in unit #5: update bathroom, kitchen countertop, cabinets, flooring, new electrical, update galvanized to copper plumbing, like for like.Details
work in unit #5: update bathroom, kitchen countertop, cabinets, flooring, new electrical, update galvanized to copper plumbing, like for like. | $20,000 |
| Jun 30, 2015 | Completed final sign-off Nov 2015 | 230 Oak St | #44- update kitchen in kind, new cabinets, counters. update bathroom in kind, new shower valve, tub. add sub panel in unit. no walls to be altered or removed. n/a ordinance #155-13Details
#44- update kitchen in kind, new cabinets, counters. update bathroom in kind, new shower valve, tub. add sub panel in unit. no walls to be altered or removed. n/a ordinance #155-13 | $15,000 |
| Feb 4, 2015 | Never finaled issued Feb 2015, no final | 1895 39th Av | remodel kitchen in kind - new cabinets, countertps, floors. remodel bathroom - inkind - new floor, wall tile, repair. no structural workDetails
remodel kitchen in kind - new cabinets, countertps, floors. remodel bathroom - inkind - new floor, wall tile, repair. no structural work | $20,000 |
| Dec 5, 2014 | Never finaled issued Dec 2014, no final | 1611 Vallejo St | remodel kitchen & bathroom. kitchen: replace cabinets, counters, flooring in-kind. bathroom: reaplce: shower valve, bathtub, tile, in-kind. no alteration of hell, window and door.Details
remodel kitchen & bathroom. kitchen: replace cabinets, counters, flooring in-kind. bathroom: reaplce: shower valve, bathtub, tile, in-kind. no alteration of hell, window and door. | $15,000 |
| Nov 24, 2014 | Never finaled issued Nov 2014, no final | 1390 Jackson St | remodel kitchen. remove and replace cabinets and countertops, floor tile in kind, bath remodel, sower tub floor and shower valve in kindDetails
remodel kitchen. remove and replace cabinets and countertops, floor tile in kind, bath remodel, sower tub floor and shower valve in kind | $31,400 |
| Nov 24, 2014 | Completed final sign-off Dec 2014 | 2266 Washington St | remodel bath wall and floor tile, new tub shower valve in kindDetails
remodel bath wall and floor tile, new tub shower valve in kind | $13,400 |
| Nov 24, 2014 | Never finaled issued Nov 2014, no final | 91 Lupine Av | retile bath, shower, floor ftile, new tub, shower valve in kindDetails
retile bath, shower, floor ftile, new tub, shower valve in kind | $13,400 |
| Nov 13, 2014 | Expired or cancelled expired Oct 2016 | 4908 03rd St | partially remodel 3 bedroom unit. all new electrical and bathroom and kitchen. plumbing as needed.Details
partially remodel 3 bedroom unit. all new electrical and bathroom and kitchen. plumbing as needed. | $20,000 |
| Oct 30, 2014 | Completed final sign-off Dec 2014 | 230 Castro St | unit 2: comply with his nov 201401071 dated 10/16/2014. remove tile, sheetrock, install fan, mold removal in bathroomDetails
unit 2: comply with his nov 201401071 dated 10/16/2014. remove tile, sheetrock, install fan, mold removal in bathroom | $5,000 |
| Sep 24, 2014 | Completed final sign-off Oct 2014 | 604 Webster St | remodel kitchen and 2 bathrooms in kind.Details
remodel kitchen and 2 bathrooms in kind. | $20,000 |
| Sep 19, 2014 | Completed final sign-off Sep 2014 | 7015 California St | units 203 & 303: bathroom repair & remodel in kind, to comply with non-201492611Details
units 203 & 303: bathroom repair & remodel in kind, to comply with non-201492611 | $7,000 |
| May 5, 2014 | Never finaled issued May 2014, no final | 339 Lyon St | #2- remodel (e) kitchen and bath in kind. no walls to be moved. remove damaged ceilings in accordance with nov and repair in kind. comply with nov201454281. in addition to dbi inspection final inspection by cacDetails
#2- remodel (e) kitchen and bath in kind. no walls to be moved. remove damaged ceilings in accordance with nov and repair in kind. comply with nov201454281. in addition to dbi inspection final inspection by cac | $15,000 |
| May 9, 2013 | Never finaled filed May 2013, never issued | 2 Cerritos Av | revision to appl #2009.03.18.4336 - revised plans to outside deck stairs at rear. to comply w/nov 200990245 & nov 19981446. legalize (e) bathroomDetails
revision to appl #2009.03.18.4336 - revised plans to outside deck stairs at rear. to comply w/nov 200990245 & nov 19981446. legalize (e) bathroom | |
| May 6, 2013 | Completed final sign-off Oct 2013 | 2070 Fell St | work in apt. #10: kitchen remodel, retile bathroom, minor alteration to wall. see attached plans.Details
work in apt. #10: kitchen remodel, retile bathroom, minor alteration to wall. see attached plans. | $15,000 |
| Dec 12, 2012 | Never finaled issued Dec 2012, no final | 339 Lyon St | to comply with nov 201279142 - kitchen remodel in kin, cabinets, countertop, flooring, upgrading plumbing, electrical to code, bathroom remodelin kind - tub, tile, vanity, toiletDetails
to comply with nov 201279142 - kitchen remodel in kin, cabinets, countertop, flooring, upgrading plumbing, electrical to code, bathroom remodelin kind - tub, tile, vanity, toilet | $10,000 |
| Nov 5, 2012 | Completed final sign-off Dec 2012 | 1732 Washington St | revision to app# 201210222584, add a partial bathroom ,repair update bathroom w/new vanity , light fixtures, new shower valve , re-tile unit #12Details
revision to app# 201210222584, add a partial bathroom ,repair update bathroom w/new vanity , light fixtures, new shower valve , re-tile unit #12 | $2,500 |
| Aug 12, 2010 | Completed final sign-off Oct 2010 | 4220 Cesar Chavez St | #212- remodel kitchen and one bathroom in kind. no structural work. kitchen: repalce counter & cabinet. bathroom: replace plumbing fixtures and retile floor and walls. no new lighting, no change to exhaust system. no window & no door, no wal work on this permit.Details
#212- remodel kitchen and one bathroom in kind. no structural work. kitchen: repalce counter & cabinet. bathroom: replace plumbing fixtures and retile floor and walls. no new lighting, no change to exhaust system. no window & no door, no wal work on this permit. | $12,000 |
| Jun 15, 2010 | Completed final sign-off Sep 2010 | 1618 Polk St | apt. # 17. kitchen and bath remodel in kind. no wall removal. electrical, electgrical: 40 plus oulets, plumbing. no change to exhaust system. kitchen: at least 50% high efficacy (by wattage); bath: high efficacy or occupancy sensorDetails
apt. # 17. kitchen and bath remodel in kind. no wall removal. electrical, electgrical: 40 plus oulets, plumbing. no change to exhaust system. kitchen: at least 50% high efficacy (by wattage); bath: high efficacy or occupancy sensor | $10,000 |
| Nov 19, 2009 | Never finaled issued Nov 2009, no final | 950 Rivera St | 1st floor area alteration, remove illegal bathroom and bedroom, remodel existing bath, relocate existing electrical meter, new windows and doorsDetails
1st floor area alteration, remove illegal bathroom and bedroom, remodel existing bath, relocate existing electrical meter, new windows and doors | $50,000 |
| Oct 8, 2009 | Completed final sign-off Mar 2010 | 1530 Green St | remodel kitchen in kind, remodel bathroom in kind. kitchen:new cabinets, countertops, flooring. bathroom:new tile om shower and floor, new counter topDetails
remodel kitchen in kind, remodel bathroom in kind. kitchen:new cabinets, countertops, flooring. bathroom:new tile om shower and floor, new counter top | $14,000 |
| May 7, 2008 | Expired or cancelled expired Jan 2011 | 3208 Buchanan St | upgrade bathroom / kitchen area - in kind.Details
upgrade bathroom / kitchen area - in kind. | $18,000 |
| Oct 31, 2007 | Completed final sign-off Feb 2008 | 1732 Washington St | remodel/update kitchen and bathroom in unit #5, upgrade lighting.Details
remodel/update kitchen and bathroom in unit #5, upgrade lighting. | $20,000 |