Block 0805, lot 019
796 Hayes St
- City’s use
- Multi-Family Residential
- Built
- 1885
- Stories
- 3
- Units
- 3
- Rooms
- 8 bedrooms, 6 bathrooms
- Building
- 3,585 sq ft
- Lot
- 2,700 sq ft
- Zoning
- RH3
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
23 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 15, 2022 | Completed final sign-off Oct 2022 | 796 Hayes St | replace (e) beams w/ new beams/joist in the second fl. comply w/ nov 202290526.Details
replace (e) beams w/ new beams/joist in the second fl. comply w/ nov 202290526. | $10,000 | |
| Nov 15, 2021 | Never finaled issued Jun 2023, no final | 604 Webster St | new roof deck & stairs above garageDetails
new roof deck & stairs above garage | $15,000 | |
| Apr 8, 2021 | Never finaled issued May 2021, no final | 796 Hayes St | rebuild dry rotted and damaged exterior stairs (see plans)Details
rebuild dry rotted and damaged exterior stairs (see plans) | $5,000 | |
| Dec 24, 2019 | Never finaled issued Dec 2019, no final | 604 Webster St | repair rear stairs tread and risers in kind. replace handrail in kind. work less than 50%Details
repair rear stairs tread and risers in kind. replace handrail in kind. work less than 50% | $1,000 | |
| Sep 24, 2014 | Completed final sign-off Oct 2014 | 604 Webster St | Acme Builders | remodel kitchen and 2 bathrooms in kind.Details
remodel kitchen and 2 bathrooms in kind. | $20,000 |
| Sep 10, 2013 | Never finaled issued Sep 2013, no final | 796 Hayes St | Tom Can Construction | remove illegal unit @ garage level, remove kitchen & shower, return to legal use as a utility room, return full bath to a half bath which approved under appl# 200505243292. cap all utilities @ source.Details
remove illegal unit @ garage level, remove kitchen & shower, return to legal use as a utility room, return full bath to a half bath which approved under appl# 200505243292. cap all utilities @ source. | $5,000 |
| Jun 25, 2012 | Never finaled issued Jun 2012, no final | 796 Hayes St | street spaceDetails
street space | ||
| Nov 10, 2008 | Completed final sign-off Jan 2009 | 798 Hayes St | to comply with complaint# 200876494, item# 2. top floor ceilings at front stairway. install sheetrock to maintain smoke & fire rating 5/8 type x (sheet rock)Details
to comply with complaint# 200876494, item# 2. top floor ceilings at front stairway. install sheetrock to maintain smoke & fire rating 5/8 type x (sheet rock) | $500 | |
| May 24, 2005 | Completed final sign-off Jan 2006 | 796 Hayes St | at storage utility area prowch new w.c & vanity, add two windows at this area.Details
at storage utility area prowch new w.c & vanity, add two windows at this area. | $8,000 | |
| Mar 14, 2002 | Completed final sign-off May 2002 | 796 Hayes St | renew:20011064973 for final inspection onlyDetails
renew:20011064973 for final inspection only | ||
| Mar 1, 2002 | Completed final sign-off Mar 2002 | 796 Hayes St | renew 9923266's for final inspection.Details
renew 9923266's for final inspection. | ||
| Oct 2, 2001 | Completed final sign-off Jan 2002 | 796 Hayes St | 3rd floor provide new kchn and bth/remove non-bearing walls and replaceDetails
3rd floor provide new kchn and bth/remove non-bearing walls and replace | $25,000 | |
| Jun 8, 2001 | Completed final sign-off Mar 2002 | 796 Hayes St | revisoin to 9923266 change from commercial to residential for interior work only interior layoutDetails
revisoin to 9923266 change from commercial to residential for interior work only interior layout | $5,000 | |
| Feb 7, 2001 | Completed final sign-off Nov 2001 | 796 Hayes St | Ruby Plumbing & Electrical | minor change for fire sprinklers per app #200005049051Details
minor change for fire sprinklers per app #200005049051 | |
| Jan 11, 2001 | Expired or cancelled cancelled Oct 2002 | 796 Hayes St | revision tp app#9923266/relocate front entryDetails
revision tp app#9923266/relocate front entry | ||
| Nov 6, 2000 | Completed final sign-off Mar 2002 | 796 Hayes St | new entry stairs @ sidewalkDetails
new entry stairs @ sidewalk | $4,000 | |
| Aug 30, 2000 | Completed final sign-off Jan 2001 | 796 Hayes St | renew expired appl #200004187555Details
renew expired appl #200004187555 | ||
| Aug 30, 2000 | Completed final sign-off Mar 2002 | 796 Hayes St | renewal of application 200003144301Details
renewal of application 200003144301 | ||
| May 4, 2000 | Completed final sign-off Nov 2001 | 796 Hayes St | install fire sprinkler system throughout the buildingDetails
install fire sprinkler system throughout the building | $12,000 | |
| Apr 25, 2000 | Completed final sign-off May 2000 | 796 Hayes St | replace tub with stall shower, relocate plumbing for washing machineDetails
replace tub with stall shower, relocate plumbing for washing machine | $500 | |
| Apr 18, 2000 | Expired or cancelled expired Jan 2001 | 796 Hayes St | lower ceiling in hall & part of kitichen to box in heating ductsDetails
lower ceiling in hall & part of kitichen to box in heating ducts | $500 | |
| Mar 14, 2000 | Expired or cancelled expired Jan 2001 | 796 Hayes St | remove 2 chimneys ont 2nd and 3rd floor/relocate kchnDetails
remove 2 chimneys ont 2nd and 3rd floor/relocate kchn | $4,000 | |
| Mar 2, 2000 | Completed final sign-off Mar 2002 | 796 Hayes St | new bthrm at second floorDetails
new bthrm at second floor | $6,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Acme Builders, Ruby Plumbing & Electrical, Tom Can Construction
- Architects
- William Pashelinsky (2), Williams Pashelinsk
- Engineers
- Darren Wong
- Authorized agent-otherss
- William Pasholinsky
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.