Block 0832, lot 005
230 Oak St
- City’s use
- Multi-Family Residential
- Built
- 1929
- Stories
- 3
- Units
- 22
- Rooms
- 20 bathrooms
- Building
- 15,100 sq ft
- Lot
- 6,599 sq ft
- Zoning
- HAYES
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
33 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 20, 2020 | Never finaled issued Feb 2020, no final | 230 Oak St | street spaceDetails
street space | ||
| Feb 22, 2019 | Never finaled issued Feb 2019, no final | 230 Oak St | street spaceDetails
street space | ||
| Oct 9, 2018 | Completed final sign-off Jan 2022 | 230 Oak St | Steelcore Builders Inc | ref 201608054353 structural work onlyDetails
ref 201608054353 structural work only | |
| May 10, 2018 | Completed final sign-off Jun 2018 | 230 Oak St | Rosconn Construction | repair dry-rot hand-rail and put back same, not visible from street, less than 50%Details
repair dry-rot hand-rail and put back same, not visible from street, less than 50% | $2,800 |
| Mar 8, 2018 | Never finaled issued Mar 2018, no final | 230 Oak St | streetspaceDetails
streetspace | ||
| Oct 16, 2017 | Never finaled issued Aug 2019, no final | 230 Oak St | Steelcore Builders Inc | add unit. demo(e) garage doors and slab, construct 2(n) residences, construct(n) walls, cabinets, applicances, plumbing fixtures and finshes, (n) elect and communication lightign and ventilation. under ordinance #162-16Details
add unit. demo(e) garage doors and slab, construct 2(n) residences, construct(n) walls, cabinets, applicances, plumbing fixtures and finshes, (n) elect and communication lightign and ventilation. under ordinance #162-16 | $200,000 |
| Jul 12, 2017 | Completed final sign-off Dec 2017 | 230 Oak St | Malagic Construction | unit 25: replace kitchen cabinets/countertop, install tile on kitchen/bathroom floors & bathroom wall, no structural work, no wall or fixture changeDetails
unit 25: replace kitchen cabinets/countertop, install tile on kitchen/bathroom floors & bathroom wall, no structural work, no wall or fixture change | $30,000 |
| Aug 5, 2016 | Completed final sign-off Jan 2022 | 230 Oak St | Steelcore Builders Inc | seismic stregthening measure to comply with the sf soft story ordinance. design per iebc appendix a4. maher naDetails
seismic stregthening measure to comply with the sf soft story ordinance. design per iebc appendix a4. maher na | $171,100 |
| Jun 30, 2015 | Completed final sign-off Nov 2015 | 230 Oak St | Acme Builders | #44- update kitchen in kind, new cabinets, counters. update bathroom in kind, new shower valve, tub. add sub panel in unit. no walls to be altered or removed. n/a ordinance #155-13Details
#44- update kitchen in kind, new cabinets, counters. update bathroom in kind, new shower valve, tub. add sub panel in unit. no walls to be altered or removed. n/a ordinance #155-13 | $15,000 |
| Aug 15, 2014 | Never finaled issued Aug 2014, no final | 230 Oak St | street spaceDetails
street space | ||
| Jan 28, 2014 | Completed final sign-off Aug 2014 | 230 Oak St | Malagic Construction | to obtain final inspection for work approved under pa# 201203025300. all work is complete.Details
to obtain final inspection for work approved under pa# 201203025300. all work is complete. | |
| Nov 27, 2013 | Completed final sign-off Aug 2014 | 230 Oak St | Malagic Construction | to obtain final inspection for work approved under pa#201009241554. all work is complete. (unit #26)Details
to obtain final inspection for work approved under pa#201009241554. all work is complete. (unit #26) | |
| Nov 27, 2013 | Completed final sign-off Aug 2014 | 230 Oak St | Malagic Construction | to obtain final inspection for work approved under pa#200710125229. all work is complete. (unit #32)Details
to obtain final inspection for work approved under pa#200710125229. all work is complete. (unit #32) | |
| Nov 27, 2013 | Completed final sign-off Aug 2014 | 230 Oak St | Malagic Construction | unit #20: to obtain final inspection for work approved under pa#200710125230. all work is complete.Details
unit #20: to obtain final inspection for work approved under pa#200710125230. all work is complete. | |
| Sep 4, 2013 | Never finaled issued Sep 2013, no final | 230 Oak St | street spaceDetails
street space | ||
| Jul 2, 2013 | Completed final sign-off Oct 2013 | 230 Oak St | Malagic Construction | unit #21 - remove partition wall by kitchen + bedroom, replace old kitchen cabinets with new, counter, flooring, bath tile. no structural work.Details
unit #21 - remove partition wall by kitchen + bedroom, replace old kitchen cabinets with new, counter, flooring, bath tile. no structural work. | $25,000 |
| Mar 2, 2012 | Expired or cancelled expired Sep 2013 | 230 Oak St | M H M Construction | remodel unit #40: remove non-load bearing walls, doors, appliances and fixtures to remodel. kitchen, bath, and bedroom. replace lighting with high efficacy lighting. plmbg and electrical as necessary.Details
remodel unit #40: remove non-load bearing walls, doors, appliances and fixtures to remodel. kitchen, bath, and bedroom. replace lighting with high efficacy lighting. plmbg and electrical as necessary. | $18,000 |
| Oct 11, 2011 | Completed final sign-off Nov 2011 | 230 Oak St | M H M Construction | unit #43: kitchen remodel removed and replace cabinets, counter, sink, repl liting with high energy efficient liting smoke detectors, no change to vent system, no window or door work no structural work, plumbing and elect as needed, provide carbon monoxide detector/sensors per sfbc 420.1 lightingDetails
unit #43: kitchen remodel removed and replace cabinets, counter, sink, repl liting with high energy efficient liting smoke detectors, no change to vent system, no window or door work no structural work, plumbing and elect as needed, provide carbon monoxide detector/sensors per sfbc 420.1 lighting | $9,000 |
| Oct 3, 2011 | Completed final sign-off Dec 2011 | 230 Oak St | Shelter | #24- kitchen & bathroom remodel-kitchen: replace cabinets, sink, lights & all fixtures/appliances. bathroom: replace vanity, toilet, tub, sink, lights & receptacles/fixtures. plumbing throughout as needed, no structural work. no adding or moving any wallsDetails
#24- kitchen & bathroom remodel-kitchen: replace cabinets, sink, lights & all fixtures/appliances. bathroom: replace vanity, toilet, tub, sink, lights & receptacles/fixtures. plumbing throughout as needed, no structural work. no adding or moving any walls | $18,000 |
| Apr 13, 2011 | Completed final sign-off May 2011 | 230 Oak St | M H M Construction | apt. #43: repair bathroom after water flood damage in unit #43. work will only be done in bathroom only. walls, sheetrock, tiles, toilet and sink same location. unit 43 - 4th floor (work in unit # 43; repair work: with 5/8" type xDetails
apt. #43: repair bathroom after water flood damage in unit #43. work will only be done in bathroom only. walls, sheetrock, tiles, toilet and sink same location. unit 43 - 4th floor (work in unit # 43; repair work: with 5/8" type x | $5,000 |
| Apr 13, 2011 | Completed final sign-off May 2011 | 230 Oak St | M H M Construction | unit # 33: repair bathroom after water flood damage unit below. work will only be done in bathroom only. walls, sheetrock, tiles, toilet and sink same location. unit 33 - 3rd floor (work in unit # 33; repair work: with 5/8" type xDetails
unit # 33: repair bathroom after water flood damage unit below. work will only be done in bathroom only. walls, sheetrock, tiles, toilet and sink same location. unit 33 - 3rd floor (work in unit # 33; repair work: with 5/8" type x | $5,000 |
| Dec 20, 2010 | Completed final sign-off Mar 2011 | 230 Oak St | M H M Construction | #30- kitchen - remove/replace cabinets, sink, lights, all fixtures & appliances. bathroom - remove/replace vanity, toilet, tub, sink, lights & receptacles and fixtures. plumbing throughout as needed. no structrual work.Details
#30- kitchen - remove/replace cabinets, sink, lights, all fixtures & appliances. bathroom - remove/replace vanity, toilet, tub, sink, lights & receptacles and fixtures. plumbing throughout as needed. no structrual work. | $18,000 |
| Oct 22, 2010 | Completed final sign-off Dec 2010 | 230 Oak St | M H M Construction | relocate kitchen and bath remodel. new bus panel and new 4 kitchen circuits. 1 bath circuitDetails
relocate kitchen and bath remodel. new bus panel and new 4 kitchen circuits. 1 bath circuit | $27,000 |
| Sep 24, 2010 | Never finaled issued Sep 2010, no final | 230 Oak St | Econoquality Inc | close off door opening in bedroom in unit #26. revision to bpa#201009100622.Details
close off door opening in bedroom in unit #26. revision to bpa#201009100622. | $2,000 |
| Sep 10, 2010 | Completed final sign-off Nov 2010 | 230 Oak St | Econoquality Inc | unit #26-kitchen & bathroom remodel, no moving or adding wallsDetails
unit #26-kitchen & bathroom remodel, no moving or adding walls | $18,000 |
| Dec 16, 2008 | Completed final sign-off Feb 2009 | 230 Oak St | On-Site Maintenance | owrk @ unit#22. upgrade kitchen + bath. no structural cabinets, counter, tile.Details
owrk @ unit#22. upgrade kitchen + bath. no structural cabinets, counter, tile. | $25,000 |
| Sep 30, 2008 | Expired or cancelled withdrawn Dec 2008 | 230 Oak St | Palmera Construction Co | work @ apt#22. remodling kitchen includes cabinet, floor, countertop and appliances. also remodel bathroom includes new sink, toilet, bath tub and floor. paint whole apartments.Details
work @ apt#22. remodling kitchen includes cabinet, floor, countertop and appliances. also remodel bathroom includes new sink, toilet, bath tub and floor. paint whole apartments. | $21,000 |
| May 16, 2008 | Completed final sign-off Oct 2008 | 230 Oak St | F B E And Sons General Const | work @ apt# 35 only. kitchen & bathroom remodel. no structural work. no lighting work. remove & replace cabinet, counter, floor & wall tiles. replace window bathroom. lightwell in kind. same location.Details
work @ apt# 35 only. kitchen & bathroom remodel. no structural work. no lighting work. remove & replace cabinet, counter, floor & wall tiles. replace window bathroom. lightwell in kind. same location. | $15,000 |
| Oct 18, 2007 | Never finaled issued Oct 2007, no final | 230 Oak St | street space permitDetails
street space permit | ||
| Oct 12, 2007 | Never finaled issued Oct 2007, no final | 230 Oak St | On-Site Maintenance | #20- change on appl#200710044520 from #2 to #20 no other work.Details
#20- change on appl#200710044520 from #2 to #20 no other work. | |
| Oct 12, 2007 | Expired or cancelled expired Feb 2011 | 230 Oak St | On-Site Maintenance | #32- kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor. exhaust termination 3'min. from property line & bldg. opening.Details
#32- kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor. exhaust termination 3'min. from property line & bldg. opening. | $21,000 |
| Oct 4, 2007 | Never finaled issued Oct 2007, no final | 230 Oak St | On-Site Maintenance | unit#2.kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor exhaust termination 3' min from pl & bldg openings.Details
unit#2.kitchen/bathroom remodel in kind. no structural changes. no window door or wall alterations. kitchen at least 50% of lighting wattage must be fluorescent. bath fluorescent or motion controlled sensor exhaust termination 3' min from pl & bldg openings. | $21,000 |
| Oct 6, 2006 | Completed final sign-off Nov 2006 | 230 Oak St | R U Construction Co | work @ unit# 10. replace (e) kitchen cabinet & install granite counter top. install colture marmol enclosure around the tub. new linoleum in unit# 10. new kitchen sink & faucet. 1 bath & 1 kitchen remodel. non structural work.Details
work @ unit# 10. replace (e) kitchen cabinet & install granite counter top. install colture marmol enclosure around the tub. new linoleum in unit# 10. new kitchen sink & faucet. 1 bath & 1 kitchen remodel. non structural work. | $10,000 |