Back to bathroom remodel contractors
Acco Engineered Systems Inc. Dba Acco En
- Based in
- Pasadena
- On San Francisco permits
- May 2000 to Oct 2026
- Last 24 months
- 39 permits filed
469 permits since 2000: 245 completed, 27 in progress, 147 never finaled, 50 expired or cancelled.
Of the 147 never-finaled permits, 15 are 3 to 5 years old, 57 are 5 to 10 years old, 75 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 2 completed, 1 in progress. Typically 2 days from filing to permit and 379 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 9, 2025 | In progress issued Apr 2025 | 2 Embarcadero Center | deferred mechanical for permit 202405242925. lobby level / suite 2210-2211: ti change of use from retail to office. mechanical on 2nd level and rooftop: demo out existing fan coils chilled and heater water piping, new vrf systems, new fans for ventilation air, bathroom exhaustDetails
deferred mechanical for permit 202405242925. lobby level / suite 2210-2211: ti change of use from retail to office. mechanical on 2nd level and rooftop: demo out existing fan coils chilled and heater water piping, new vrf systems, new fans for ventilation air, bathroom exhaust | $300,000 |
| Dec 19, 2018 | Completed final sign-off Jul 2019 | 222 02nd St | 1st floor: installation of (n) wshp to serve small retail space. will tie into (e) cw lines will run (n) duct to serve space, will install (n) ef to serve (n) bathroom (2) fsd's will be added to maintain raiting of (e) spaces, booster pump will be added to help with pump head baseDetails
1st floor: installation of (n) wshp to serve small retail space. will tie into (e) cw lines will run (n) duct to serve space, will install (n) ef to serve (n) bathroom (2) fsd's will be added to maintain raiting of (e) spaces, booster pump will be added to help with pump head base | $20,000 |
| Aug 21, 2018 | Completed final sign-off Apr 2020 | 888 Howard St | install (6) new 4 pipe fan coil units, install (5) new vav terminal boxes including ductwork & thermostat, provide exhause to bathrooms tying it to existing exhuast fan. reference pa# 2018-0327-4716 for related building permitDetails
install (6) new 4 pipe fan coil units, install (5) new vav terminal boxes including ductwork & thermostat, provide exhause to bathrooms tying it to existing exhuast fan. reference pa# 2018-0327-4716 for related building permit | $90,000 |