Back to kitchen remodel contractors
2 H
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Jan 2025
- Last 24 months
- 1 permit filed
40 permits since 2000: 31 completed, 2 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 6 completed, 2 in progress. Typically 0 days from filing to permit and 103 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2025 | In progress issued Sep 2025 | 1622 19th Av | at 1st flr: remodel 1st floor area to new standard unit with (n) living room, (n) bedroom, (n) kitchen and (n) bathroom.Details
at 1st flr: remodel 1st floor area to new standard unit with (n) living room, (n) bedroom, (n) kitchen and (n) bathroom. | $125,000 |
| Jun 7, 2024 | In progress issued Jun 2024 | 1622 19th Av | at 2/f. remodel (e) kitchen, bath, (n) master bath, and (n) exterior stairs to rear yard. to comply with nov# 202420943.Details
at 2/f. remodel (e) kitchen, bath, (n) master bath, and (n) exterior stairs to rear yard. to comply with nov# 202420943. | $189,000 |
| Mar 28, 2013 | Completed final sign-off Aug 2013 | 201 Divisadero St | remodel kitchen: new cabinets, fixtures, floor. remodel bathroom, new tile walls, plumbing fixtures, floor. instlal sub panel in unit, new outlets, switches, lights, smoke detectors in unit with co detectors.Details
remodel kitchen: new cabinets, fixtures, floor. remodel bathroom, new tile walls, plumbing fixtures, floor. instlal sub panel in unit, new outlets, switches, lights, smoke detectors in unit with co detectors. | $19,000 |
| Oct 6, 2011 | Completed final sign-off Jan 2012 | 2634 Octavia St | #2- kitchen remodel: replace cabinets, fixtures, new pluming, electrical, add island and bar area with addition sink. electrical: replace 50 amp sub panel with new same brand, add 10 outlets. kitchen exhaust seperate permit. no structural work. no change on wall & openings.Details
#2- kitchen remodel: replace cabinets, fixtures, new pluming, electrical, add island and bar area with addition sink. electrical: replace 50 amp sub panel with new same brand, add 10 outlets. kitchen exhaust seperate permit. no structural work. no change on wall & openings. | $15,000 |
| Sep 22, 2010 | Completed final sign-off May 2011 | 577 Belvedere St | 1st fl-replace front & wood garage dr, remodel bedroom, add bath within (e) envelope, add exterior deck. 2nd fl-rebuilt stairs in kind, provide 1hr property line wall @ stairs, remodel kitchen & bath on 3rd fl, provide deck @ lightwell, remodel kitchen & bathDetails
1st fl-replace front & wood garage dr, remodel bedroom, add bath within (e) envelope, add exterior deck. 2nd fl-rebuilt stairs in kind, provide 1hr property line wall @ stairs, remodel kitchen & bath on 3rd fl, provide deck @ lightwell, remodel kitchen & bath | $200,000 |
| Jul 26, 2010 | Completed final sign-off Nov 2010 | 201 Divisadero St | unit#818 - kitchen: replace cabinetry, counters, floor, fixtures. bathroom: replace sink, toilet, bathtub convert to shower stall, new floor and tile. kitchen & bath floor plan to remain the same. no structural work. wall & ceiling repairs, new paint, electrical: new sub-service panel,Details
unit#818 - kitchen: replace cabinetry, counters, floor, fixtures. bathroom: replace sink, toilet, bathtub convert to shower stall, new floor and tile. kitchen & bath floor plan to remain the same. no structural work. wall & ceiling repairs, new paint, electrical: new sub-service panel, | $21,000 |
| Jul 27, 2009 | Completed final sign-off Sep 2009 | 1740 Quint St | kitchen and bath remodel. no structlural. kitch: replace cabinets, counters, fixtures, floor, new lights 140 sf min. 50% kchn light watt to be high efficency lights. bath: replace fixtures. including tub, shower pan, new tile 45 sf. all work on 2nd floor.Details
kitchen and bath remodel. no structlural. kitch: replace cabinets, counters, fixtures, floor, new lights 140 sf min. 50% kchn light watt to be high efficency lights. bath: replace fixtures. including tub, shower pan, new tile 45 sf. all work on 2nd floor. | $34,926 |
| Jan 24, 2007 | Completed final sign-off Apr 2007 | 140 Church St | replace (1) front window w/ (new) wood frame unti to match existing . replace (1) rear ext. door, repair broken glazing, damaged plaster wall, paint, new kitchen cbinets w/countertop. comply with nov#200682756.Details
replace (1) front window w/ (new) wood frame unti to match existing . replace (1) rear ext. door, repair broken glazing, damaged plaster wall, paint, new kitchen cbinets w/countertop. comply with nov#200682756. | $12,000 |