Back to bathroom remodel contractors
2 H
- Based in
- San Francisco
- On San Francisco permits
- Mar 2006 to Jan 2025
- Last 24 months
- 1 permit filed
40 permits since 2000: 31 completed, 2 in progress, 5 never finaled, 2 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 10 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 13, 2025 | In progress issued Sep 2025 | 1622 19th Av | at 1st flr: remodel 1st floor area to new standard unit with (n) living room, (n) bedroom, (n) kitchen and (n) bathroom.Details
at 1st flr: remodel 1st floor area to new standard unit with (n) living room, (n) bedroom, (n) kitchen and (n) bathroom. | $125,000 |
| Jun 7, 2024 | In progress issued Jun 2024 | 1622 19th Av | at 2/f. remodel (e) kitchen, bath, (n) master bath, and (n) exterior stairs to rear yard. to comply with nov# 202420943.Details
at 2/f. remodel (e) kitchen, bath, (n) master bath, and (n) exterior stairs to rear yard. to comply with nov# 202420943. | $189,000 |
| May 21, 2015 | Completed final sign-off Jan 2016 | 149 Berkeley Wy | master bath renovation, partition existing family room, add bath to family roomDetails
master bath renovation, partition existing family room, add bath to family room | $50,000 |
| Mar 28, 2013 | Completed final sign-off Aug 2013 | 201 Divisadero St | remodel kitchen: new cabinets, fixtures, floor. remodel bathroom, new tile walls, plumbing fixtures, floor. instlal sub panel in unit, new outlets, switches, lights, smoke detectors in unit with co detectors.Details
remodel kitchen: new cabinets, fixtures, floor. remodel bathroom, new tile walls, plumbing fixtures, floor. instlal sub panel in unit, new outlets, switches, lights, smoke detectors in unit with co detectors. | $19,000 |
| Dec 13, 2012 | Completed final sign-off Jan 2013 | 3321 21st St | unit #9: replace drywall in bathrm with 5/8" bathrm remodeling for units 9&3, fire rated gypsum. new gfci outlet, new light, new wall and floor tile, repl toilet and wall sink in kind. floor plan unchanged (e) bath tub remains, unit #3: repl bathrm ceiling drywall gypsum, repl toilet, sink &Details
unit #9: replace drywall in bathrm with 5/8" bathrm remodeling for units 9&3, fire rated gypsum. new gfci outlet, new light, new wall and floor tile, repl toilet and wall sink in kind. floor plan unchanged (e) bath tub remains, unit #3: repl bathrm ceiling drywall gypsum, repl toilet, sink & | $10,000 |
| Oct 6, 2010 | Completed final sign-off Apr 2011 | 1709 Sanchez St | replace bath tub, toilet, vanity, tile, fixtures etc. in kind.replace thermostatic valve. add sink for vanity (dual sink) add bathroom fan & switch. work on 2nd floor bathroom. no wall changes, one bathroom, no structural work, no (n) lighting.Details
replace bath tub, toilet, vanity, tile, fixtures etc. in kind.replace thermostatic valve. add sink for vanity (dual sink) add bathroom fan & switch. work on 2nd floor bathroom. no wall changes, one bathroom, no structural work, no (n) lighting. | $9,000 |
| Sep 22, 2010 | Completed final sign-off May 2011 | 577 Belvedere St | 1st fl-replace front & wood garage dr, remodel bedroom, add bath within (e) envelope, add exterior deck. 2nd fl-rebuilt stairs in kind, provide 1hr property line wall @ stairs, remodel kitchen & bath on 3rd fl, provide deck @ lightwell, remodel kitchen & bathDetails
1st fl-replace front & wood garage dr, remodel bedroom, add bath within (e) envelope, add exterior deck. 2nd fl-rebuilt stairs in kind, provide 1hr property line wall @ stairs, remodel kitchen & bath on 3rd fl, provide deck @ lightwell, remodel kitchen & bath | $200,000 |
| Jul 26, 2010 | Completed final sign-off Nov 2010 | 201 Divisadero St | unit#818 - kitchen: replace cabinetry, counters, floor, fixtures. bathroom: replace sink, toilet, bathtub convert to shower stall, new floor and tile. kitchen & bath floor plan to remain the same. no structural work. wall & ceiling repairs, new paint, electrical: new sub-service panel,Details
unit#818 - kitchen: replace cabinetry, counters, floor, fixtures. bathroom: replace sink, toilet, bathtub convert to shower stall, new floor and tile. kitchen & bath floor plan to remain the same. no structural work. wall & ceiling repairs, new paint, electrical: new sub-service panel, | $21,000 |
| Jul 27, 2009 | Completed final sign-off Sep 2009 | 1740 Quint St | kitchen and bath remodel. no structlural. kitch: replace cabinets, counters, fixtures, floor, new lights 140 sf min. 50% kchn light watt to be high efficency lights. bath: replace fixtures. including tub, shower pan, new tile 45 sf. all work on 2nd floor.Details
kitchen and bath remodel. no structlural. kitch: replace cabinets, counters, fixtures, floor, new lights 140 sf min. 50% kchn light watt to be high efficency lights. bath: replace fixtures. including tub, shower pan, new tile 45 sf. all work on 2nd floor. | $34,926 |
| May 13, 2009 | Completed final sign-off Jun 2009 | 2431 Filbert St | bath remodel-replace fixtures-toilets, sinks, tub, shower, tiling, new lighting, switches, outlets, etc. 2 bathrooms. no plumbing or structure work/in-kind.Details
bath remodel-replace fixtures-toilets, sinks, tub, shower, tiling, new lighting, switches, outlets, etc. 2 bathrooms. no plumbing or structure work/in-kind. | $11,000 |
| Dec 27, 2007 | Completed final sign-off Jan 2008 | 2418 Funston Av | work to comply with notice of violation#200725235. repair smoke detectors. repair bathroom sink. paint living room ceiling, window ledges.Details
work to comply with notice of violation#200725235. repair smoke detectors. repair bathroom sink. paint living room ceiling, window ledges. | $800 |
| Aug 7, 2007 | Never finaled issued Aug 2007, no final | 40 Thrift St | remodel (e) downstaris bath. remove / replace fixtures. new finishes. no alterations to walls or structure. new lighting to be flourescent.Details
remodel (e) downstaris bath. remove / replace fixtures. new finishes. no alterations to walls or structure. new lighting to be flourescent. | $6,500 |
| Apr 26, 2006 | Completed final sign-off Oct 2006 | 1507 26th Av | build out (e) garage rear into office and living space with two new bathrooms @ rear of garage.Details
build out (e) garage rear into office and living space with two new bathrooms @ rear of garage. | $35,000 |
| Mar 31, 2006 | Expired or cancelled expired Nov 2006 | 758 Brunswick St | garage remodel- n ew exercise room & bathroom and add sliding door at rear of bldg.Details
garage remodel- n ew exercise room & bathroom and add sliding door at rear of bldg. | $6,000 |