Block 5671, lot 013
350 Winfield St
- City’s use
- Single Family Residential
- Built
- 1906
- Stories
- 3
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 2,103 sq ft
- Lot
- 1,794 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
6 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 14, 2021 | Completed final sign-off May 2022 | 350 Winfield St | rev pa# 202008202261; replace (e) wood burining fire place living room with gas fire place elec & gas work roughin alredy inspectedDetails
rev pa# 202008202261; replace (e) wood burining fire place living room with gas fire place elec & gas work roughin alredy inspected | $2,000 | |
| Aug 20, 2020 | Completed final sign-off Jul 2022 | 350 Winfield St | relocate power room, provide (2) rear new alum windows. provide (n) shearwalls at rear elevation. revision to pa# 202001313304Details
relocate power room, provide (2) rear new alum windows. provide (n) shearwalls at rear elevation. revision to pa# 202001313304 | $5,000 | |
| Jan 31, 2020 | Completed final sign-off May 2022 | 350 Winfield St | 1) at 2nd floor remove load bearing walls, nw stl beam, 2)at 2nd floor turn bath into toilet rm. 3) remodel kitchen. 4)replace extg interior spiral stairs. 5)remove extg windows and door at rear yard elevation and replace with new 6) at 1st floor expand toilet room into bath. 7)nw deck at rearDetails
1) at 2nd floor remove load bearing walls, nw stl beam, 2)at 2nd floor turn bath into toilet rm. 3) remodel kitchen. 4)replace extg interior spiral stairs. 5)remove extg windows and door at rear yard elevation and replace with new 6) at 1st floor expand toilet room into bath. 7)nw deck at rear | $55,000 | |
| Sep 13, 2019 | Never finaled issued Sep 2019, no final | 350 Winfield St | street spaceDetails
street space | ||
| Sep 5, 2019 | Completed final sign-off Oct 2019 | 350 Winfield St | L & B Construction | painting inside the house. replace bathroom floor tileDetails
painting inside the house. replace bathroom floor tile | $5,000 |
| Apr 22, 2008 | Completed final sign-off Jan 2009 | 350 Winfield St | Streiffer Burnham Const., Inc. | convert a portion of ex. garage to new office, new bedroom, new half bath and new mechanical room. install a new spiral stairs to connect the ground floor to the 2nd floor.Details
convert a portion of ex. garage to new office, new bedroom, new half bath and new mechanical room. install a new spiral stairs to connect the ground floor to the 2nd floor. | $60,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- L & B Construction, Streiffer Burnham Const., Inc.
- Architects
- Jorge Carbonell, Michael Hennessey
- Engineers
- Fareed Himmati
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.