L & B Construction
- Based in
- Oakland
- On San Francisco permits
- Sep 2019 to Dec 2023
- Last 24 months
- 0 permits filed
6 permits since 2000: 4 completed, 2 never finaled.
Of the 2 never-finaled permits, 2 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 12, 2023 | Completed final sign-off Sep 2024 | 2602 Sacramento St | apt#2- 2/f interior remodel, remodel (e) kitchen & bathroom, new lighting & outlets, new insulation & finishes.Details
apt#2- 2/f interior remodel, remodel (e) kitchen & bathroom, new lighting & outlets, new insulation & finishes. | $112,000 |
| Oct 31, 2023 | Completed final sign-off Feb 2024 | 3033 Turk St | unit# 3: remodel (e) apartment on 3/f, includes the following: remodel part of the living room to bedroom, remodel (e) bathroom and kitchen, new wall & ceiling finishes & new light fixtures & outlets.Details
unit# 3: remodel (e) apartment on 3/f, includes the following: remodel part of the living room to bedroom, remodel (e) bathroom and kitchen, new wall & ceiling finishes & new light fixtures & outlets. | $83,000 |
| Dec 30, 2022 | Completed final sign-off Dec 2023 | 780 Goettingen St | add 1 new laundry rm, bedroom & full bathroom @ ground fl. replace e furnace with heat pump. replace 2 post and footings. replace slab at ground floor at new bdrm.Details
add 1 new laundry rm, bedroom & full bathroom @ ground fl. replace e furnace with heat pump. replace 2 post and footings. replace slab at ground floor at new bdrm. | $50,000 |
| Sep 27, 2022 | Never finaled issued Sep 2022, no final | 618 Thornton Av | revision to approved bpa#202206307548. 2/f: remodel kitchen, bathroom & bedroom. infill interior stairs, add (1) bathroom & exterior stairway rear per planDetails
revision to approved bpa#202206307548. 2/f: remodel kitchen, bathroom & bedroom. infill interior stairs, add (1) bathroom & exterior stairway rear per plan | $46,300 |
| Jun 30, 2022 | Never finaled issued Jul 2022, no final | 618 Thornton Av | g/: remodel bedroom, add 1 bedroom, kitchenette, 1 bathroom & side door at gf.Details
g/: remodel bedroom, add 1 bedroom, kitchenette, 1 bathroom & side door at gf. | $40,000 |
| Sep 5, 2019 | Completed final sign-off Oct 2019 | 350 Winfield St | painting inside the house. replace bathroom floor tileDetails
painting inside the house. replace bathroom floor tile | $5,000 |