William Commer
- Listed as
- architect, engineer
- On San Francisco permits
- Nov 2005 to Sep 2026
16 permits since 2000 (architect on 15 permits, engineer on 1 permit): 8 completed, 1 in progress, 6 never finaled, 1 expired or cancelled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 10, 2026 | In progress filed Sep 2026, not yet issued | 580 Valencia St | interior tenant remodeling. no change in use, egress or occupancy. no storefront or exterior work. work includes rearranging internal non load bearing walls, millwork removal; new walls and floor finishes. relocation of (e) power + data receptacles and addition of new receptacles. in kind light...Details
interior tenant remodeling. no change in use, egress or occupancy. no storefront or exterior work. work includes rearranging internal non load bearing walls, millwork removal; new walls and floor finishes. relocation of (e) power + data receptacles and addition of new receptacles. in kind light... | $250,000 | |
| May 29, 2024 | Completed final sign-off Mar 2025 | 2238 Fillmore St | Charger Construction And Design Inc | tenant improvemnt. no change in use occupancy orDetails
tenant improvemnt. no change in use occupancy or | $129,270 |
| Apr 27, 2023 | Never finaled issued Jul 2023, no final | 3251 20th Av | Retail Contracting Group Inc | int ti for lenscrafters at stonestown 2nd lv. demo, structural, & mep included. new restrooms & drinking foundtain.Details
int ti for lenscrafters at stonestown 2nd lv. demo, structural, & mep included. new restrooms & drinking foundtain. | $400,000 |
| Mar 8, 2023 | Never finaled issued May 2023, no final | 900 North Point St | Johnson United Inc Dba United Sign Syste | lettering on awning "the original chocolate shop: and "home of the world famous hot fudge sundae"Details
lettering on awning "the original chocolate shop: and "home of the world famous hot fudge sundae" | $2,000 |
| Mar 8, 2023 | Never finaled issued May 2023, no final | 900 North Point St | Johnson United Inc Dba United Sign Syste, Swinerton Builders | 1st fl - replace (e) awning with metal canopy and light box; no changes to historical materials, plaza paving, or furnishings. no flashing lights or noise generating features. replace eixsting entry door with new door and new threshold, no changes (e) masonryDetails
1st fl - replace (e) awning with metal canopy and light box; no changes to historical materials, plaza paving, or furnishings. no flashing lights or noise generating features. replace eixsting entry door with new door and new threshold, no changes (e) masonry | $20,000 |
| Dec 23, 2022 | Completed final sign-off Sep 2023 | 900 North Point St | Swinerton Builders | t.i ghirardell tenant space with in clock tower bldg 3/f and 4/f. interior only. no exterior work. work includes new partitions, lighting, millwork.Details
t.i ghirardell tenant space with in clock tower bldg 3/f and 4/f. interior only. no exterior work. work includes new partitions, lighting, millwork. | $666,750 |
| Aug 24, 2022 | Never finaled issued Dec 2022, no final | 900 North Point St | Swinerton Builders | clock tower: demo of partitions only per ab-017. space (3rd and 4th floor) to remain vacant- stair to remain. remaining build out to be under sep permit. no exterior work under this permit.Details
clock tower: demo of partitions only per ab-017. space (3rd and 4th floor) to remain vacant- stair to remain. remaining build out to be under sep permit. no exterior work under this permit. | $660,750 |
| Jan 7, 2022 | Never finaled issued Jan 2022, no final | 900 North Point St | Swinerton Builders | ti: temporary installation of euipment and fixtures relocated from (e) space on the property to installation of new vct flooring.Details
ti: temporary installation of euipment and fixtures relocated from (e) space on the property to installation of new vct flooring. | $25,000 |
| Sep 16, 2021 | Completed final sign-off May 2023 | 900 North Point St | Swinerton Builders | 3rd fl, ghirardelli chocolate co. tenant improvement includes non struc partitions, new millwork, finishes & lighting. add 3 new heat pumps. incl mep modifications. fire alarm/sprinklers under sep permits.Details
3rd fl, ghirardelli chocolate co. tenant improvement includes non struc partitions, new millwork, finishes & lighting. add 3 new heat pumps. incl mep modifications. fire alarm/sprinklers under sep permits. | $666,750 |
| Jan 14, 2021 | Completed final sign-off Aug 2021 | 2128 Chestnut St | Ssw Construction Corp | t.i. remove/replace sales area display fixtures. remove/replace cash desk, sales area flooring, & wall base. paint sales area walls. new sales area lighting, electrical work for new lighting & display fixtures.Details
t.i. remove/replace sales area display fixtures. remove/replace cash desk, sales area flooring, & wall base. paint sales area walls. new sales area lighting, electrical work for new lighting & display fixtures. | $168,000 |
| Feb 13, 2020 | Never finaled issued Mar 2021, no final | 3251 20th Av | Hardesty And Associates | space 212: new finishes, store fixtures, casework, lighting, electrical and mechanical. fire sprinkler and alarm deferred review.Details
space 212: new finishes, store fixtures, casework, lighting, electrical and mechanical. fire sprinkler and alarm deferred review. | $140,000 |
| Sep 17, 2015 | Completed final sign-off Mar 2016 | 845 Market St | West Coast Development | #307 - interior only ti to existing godiva retail store 1076Details
#307 - interior only ti to existing godiva retail store 1076 | $225,000 |
| Aug 30, 2013 | Completed final sign-off Jan 2014 | 51 Grant Av | ti to existing vacant store in cluding new ada bathroom, new stairs to basement, accessible path to elevator in basement. no exterior work.Details
ti to existing vacant store in cluding new ada bathroom, new stairs to basement, accessible path to elevator in basement. no exterior work. | $250,000 | |
| Jun 26, 2013 | Completed final sign-off Sep 2013 | 3251 20th Av | space #148 new tenant improvement "uniqlo" (10,586 sf), framing, framing, finishes, elec, mech, plumbing.Details
space #148 new tenant improvement "uniqlo" (10,586 sf), framing, framing, finishes, elec, mech, plumbing. | $1,447,000 | |
| Sep 12, 2012 | Completed final sign-off Sep 2013 | 845 Market St | interior non-structural tenant improvement to space fe-13b at concourse level.Details
interior non-structural tenant improvement to space fe-13b at concourse level. | $40,000 | |
| Nov 10, 2005 | Expired or cancelled expired Aug 2008 | 865 Market St | Market Contractors Ltd | space #204 - ti for existing retail space 2,467 sq ftDetails
space #204 - ti for existing retail space 2,467 sq ft | $338,000 |