David Leiffer
- License
- 34319
- Board not determined from the city's record: no role or letter places this number
- About the state's license search
- Search the state's license records (not the contractors board)
- Listed as
- engineer
- On San Francisco permits
- Sep 2021 to Feb 2026
3 permits since 2000 (engineer on 3 permits): 2 completed, 1 in progress.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Swinerton Builders (2), Able Maintenance Inc
- Architects
- William Commer (2)
- Engineers
- John Ferguson (2), Leon So
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 3
- Other or unknown 0
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 3, 2026 | In progress filed Feb 2026, not yet issued | 3300 Cesar Chavez St | Able Maintenance Inc | fuel system replacement (no tanks). remove and install new piping, summp, udc's. use existing dispensers. install new tls450+Details
fuel system replacement (no tanks). remove and install new piping, summp, udc's. use existing dispensers. install new tls450+ | $795,000 |
| Dec 23, 2022 | Completed final sign-off Sep 2023 | 900 North Point St | Swinerton Builders | t.i ghirardell tenant space with in clock tower bldg 3/f and 4/f. interior only. no exterior work. work includes new partitions, lighting, millwork.Details
t.i ghirardell tenant space with in clock tower bldg 3/f and 4/f. interior only. no exterior work. work includes new partitions, lighting, millwork. | $666,750 |
| Sep 16, 2021 | Completed final sign-off May 2023 | 900 North Point St | Swinerton Builders | 3rd fl, ghirardelli chocolate co. tenant improvement includes non struc partitions, new millwork, finishes & lighting. add 3 new heat pumps. incl mep modifications. fire alarm/sprinklers under sep permits.Details
3rd fl, ghirardelli chocolate co. tenant improvement includes non struc partitions, new millwork, finishes & lighting. add 3 new heat pumps. incl mep modifications. fire alarm/sprinklers under sep permits. | $666,750 |