Victor Tong
- License
- E10760
- Electrical engineer
- About the Board for Professional Engineers, Land Surveyors, and Geologists
- Look up E10760 at the Board for Professional Engineers
- Listed as
- engineer
- Firm
- Fw Associates
- Based in
- San Francisco
- On San Francisco permits
- Dec 2006 to Dec 2008
2 permits since 2000 (engineer on 2 permits): 2 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. The discipline is read from the letters before the number, as the Board for Professional Engineers, Land Surveyors, and Geologists lists them (its license types, read Oct 16, 2026), and for a C number from whether the permits list the license as an architect or as an engineer. How to read these records
Worked with
Every other licensed party on the same permits, by the role the city lists them under, with how many of those permits each is on.
- Contractors
- Angotti & Reilly Inc., Bloemendal Construction**See Notes***
- Architects
- Peter Grant Rockwell
Where they worked
- Single-family 0
- Multi-family (2-family, apartments) 0
- Commercial 1
- Other or unknown 1
One dot per permit, coloured by the building type the city or the assessor gives it. A dark circle is several permits close together: click it to zoom in.
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 22, 2008 | Completed final sign-off Oct 2009 | 50 Scott St | Angotti & Reilly Inc. | provide fire smoke dampers, access panels. light fixtures deleted, fire/smoke damaper access hatch added, hv supply grill shown. 1 hr ceiling and 1 hr access panels addes. 1 hr kitchen ceiling added, hv-1 cfm changed to 800. revise air supply, flue from uh-1 retouted, air volume @ registers revisedDetails
provide fire smoke dampers, access panels. light fixtures deleted, fire/smoke damaper access hatch added, hv supply grill shown. 1 hr ceiling and 1 hr access panels addes. 1 hr kitchen ceiling added, hv-1 cfm changed to 800. revise air supply, flue from uh-1 retouted, air volume @ registers revised | $25,000 |
| Dec 20, 2006 | Completed final sign-off Jun 2012 | 4750 Martin Luther King Dr | Bloemendal Construction**See Notes*** | renconstruct tower using historic material, reconstruct gallery, shotcrete concrete base, reconstruct cap,operating mechanism, install new sail stocks. note: this building is a sf landmark #210. certificate of appropriateness (no 2001.0732a) filed 7/24/01 granted 9/15/01.Details
renconstruct tower using historic material, reconstruct gallery, shotcrete concrete base, reconstruct cap,operating mechanism, install new sail stocks. note: this building is a sf landmark #210. certificate of appropriateness (no 2001.0732a) filed 7/24/01 granted 9/15/01. |