Peter Grant Rockwell
- Listed as
- architect, designer
- Firm
- Peter G. Rockwell Aia
- On San Francisco permits
- Oct 2006 to Jun 2016
5 permits since 2000 (architect on 4 permits, designer on 1 permit): 5 completed.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 28, 2016 | Completed final sign-off Jan 2017 | 2783 Diamond St | install new bathroom on ground floor includiing electrical, plumbing and ventilation. remove existing stairs to basement (2), relocate stairs.Details
install new bathroom on ground floor includiing electrical, plumbing and ventilation. remove existing stairs to basement (2), relocate stairs. | $7,500 | |
| Sep 25, 2015 | Completed final sign-off Feb 2016 | 130 Miraloma Dr | Sablosky Construction | replace countertops. new sink and range hood, 1/2 bathDetails
replace countertops. new sink and range hood, 1/2 bath | $10,000 |
| Dec 22, 2008 | Completed final sign-off Oct 2009 | 50 Scott St | Angotti & Reilly Inc. | revision to 200610104538 r1: relief dampers added at window o. ceiling plan revised to reflect mechanical changes. kitchen 1 hr ceiling deleted. access panel relocated to revised fire smoke damper location. combustion airduct added @ rehersal room west wall. return air grill added @ rehersal rm westDetails
revision to 200610104538 r1: relief dampers added at window o. ceiling plan revised to reflect mechanical changes. kitchen 1 hr ceiling deleted. access panel relocated to revised fire smoke damper location. combustion airduct added @ rehersal room west wall. return air grill added @ rehersal rm west | $23,000 |
| Dec 22, 2008 | Completed final sign-off Oct 2009 | 50 Scott St | Angotti & Reilly Inc. | provide fire smoke dampers, access panels. light fixtures deleted, fire/smoke damaper access hatch added, hv supply grill shown. 1 hr ceiling and 1 hr access panels addes. 1 hr kitchen ceiling added, hv-1 cfm changed to 800. revise air supply, flue from uh-1 retouted, air volume @ registers revisedDetails
provide fire smoke dampers, access panels. light fixtures deleted, fire/smoke damaper access hatch added, hv supply grill shown. 1 hr ceiling and 1 hr access panels addes. 1 hr kitchen ceiling added, hv-1 cfm changed to 800. revise air supply, flue from uh-1 retouted, air volume @ registers revised | $25,000 |
| Oct 10, 2006 | Completed final sign-off Oct 2009 | 50 Scott St | renov extg facility to incl reconfigurate building layout,seismic upgrade improv to bldg entrance faucility for ada compliance. replace heating,plmg elec sys.wk consists selec demo. add 2 elevators.add a grand staircase on east,2 story add at nw w/ new exit stairwy,site wk,curbramp wk&misc renov.Details
renov extg facility to incl reconfigurate building layout,seismic upgrade improv to bldg entrance faucility for ada compliance. replace heating,plmg elec sys.wk consists selec demo. add 2 elevators.add a grand staircase on east,2 story add at nw w/ new exit stairwy,site wk,curbramp wk&misc renov. |