Roberto Campoamor
- Listed as
- architect, authorized agent-others, engineer
- Firm
- Campoamor Architects
- Based in
- Berkeley
- On San Francisco permits
- Aug 2000 to May 2023
13 permits since 2000 (architect on 10 permits, authorized agent-others on 2 permits, engineer on 1 permit): 11 completed, 2 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| May 31, 2023 | Completed final sign-off Jul 2025 | 210 Locust St | P 3 Construction & Remodeling Inc | new wine rm w/ refriguation in lower lvl/ reconfigure walls, 3 (n) french doors @ back of house. walkable skylight on 2rd fl hallway. 3rd fl: demo closet to open room. reconfigure small area of roof @ deck for new french doors. new fireplace & guardrail @ 2nd fl interior stairsDetails
new wine rm w/ refriguation in lower lvl/ reconfigure walls, 3 (n) french doors @ back of house. walkable skylight on 2rd fl hallway. 3rd fl: demo closet to open room. reconfigure small area of roof @ deck for new french doors. new fireplace & guardrail @ 2nd fl interior stairs | $195,000 |
| Feb 2, 2022 | Completed final sign-off Apr 2024 | 2240 Beach St | S F G Construction Co. | revision to pa# 201911268222. consisting of reduced 1st fl footprint by 60 sqft & the 2nf fl by 24 sqft. eliminating 3 windows & 3 skylights. all notes & dimensions on the approved plans to remain except as shown on proposed drawings.Details
revision to pa# 201911268222. consisting of reduced 1st fl footprint by 60 sqft & the 2nf fl by 24 sqft. eliminating 3 windows & 3 skylights. all notes & dimensions on the approved plans to remain except as shown on proposed drawings. | |
| Mar 18, 2021 | Never finaled issued Dec 2022, no final | 962 Clayton St | Ventana 76 | new skylights and stair access to roof deckDetails
new skylights and stair access to roof deck | $65,000 |
| Nov 26, 2019 | Completed final sign-off Sep 2024 | 2240 Beach St | S F G Construction Co. | remodel & addition to existing residence. new first floor unit at rear, remodel second floor with addition at rear (2nd unit)**maher 14Details
remodel & addition to existing residence. new first floor unit at rear, remodel second floor with addition at rear (2nd unit)**maher 14 | $450,000 |
| Apr 17, 2017 | Completed final sign-off Jan 2019 | 150 Woodland Av | Seth Bernstein | convert (e) ground floor storage room & garage into new bedroom, bathroom & den with adj. deck. shorten (e) lower floor deck & insert a new spiral stair access to it. new terrace to support stair. excavate level area for parking 1 car @ (e) drive way.Details
convert (e) ground floor storage room & garage into new bedroom, bathroom & den with adj. deck. shorten (e) lower floor deck & insert a new spiral stair access to it. new terrace to support stair. excavate level area for parking 1 car @ (e) drive way. | $95,000 |
| Jun 9, 2009 | Completed final sign-off Oct 2009 | 155 Day St | Pete Humphrey Carpentry Inc | convert existing study into bedroom, replace (e) glazed windows at front facade with new wood double glazed windows in (e) openings. extend interior niche and shelf at foyer.Details
convert existing study into bedroom, replace (e) glazed windows at front facade with new wood double glazed windows in (e) openings. extend interior niche and shelf at foyer. | $5,000 |
| Sep 18, 2008 | Completed final sign-off Jul 2010 | 4850 17th St | E Sykes Construction | revision to app #200710104991 s1. the roof line height will be reduced by one foot from 37'- 6" to 36' - 6"Details
revision to app #200710104991 s1. the roof line height will be reduced by one foot from 37'- 6" to 36' - 6" | |
| Mar 31, 2008 | Never finaled issued Sep 2008, no final | 962 Clayton St | Ventana 76 | horizontal extention of ex. sunroom, bedroom and kitchen. remodel ex. kitchen, sunroom, main bedroom, study and master bathroom.Details
horizontal extention of ex. sunroom, bedroom and kitchen. remodel ex. kitchen, sunroom, main bedroom, study and master bathroom. | $150,000 |
| Oct 10, 2007 | Completed final sign-off Jul 2010 | 4850 17th St | E Sykes Construction | horizontal extension to existing building at: 1. 3/fl - new study & bathroom. 2. 2/fl - new breakfast room and remodeled (e) kitchen. 3. 1/fl - extend length of (e) garage & storage area under new 1st floor deck.Details
horizontal extension to existing building at: 1. 3/fl - new study & bathroom. 2. 2/fl - new breakfast room and remodeled (e) kitchen. 3. 1/fl - extend length of (e) garage & storage area under new 1st floor deck. | $200,000 |
| Dec 7, 2006 | Completed final sign-off Dec 2007 | 4321 23rd St | Ventana 76 | remodel of kitchen & 2 bathrooms. reroof dinning room. add 2nd floor closet over existing footprint @ side of house, 60 sqft.Details
remodel of kitchen & 2 bathrooms. reroof dinning room. add 2nd floor closet over existing footprint @ side of house, 60 sqft. | $100,000 |
| Apr 27, 2006 | Completed final sign-off Nov 2006 | 40 Dorland St | additional work to appl#200601313455 for voluntary partial seismic upgrade.Details
additional work to appl#200601313455 for voluntary partial seismic upgrade. | $12,000 | |
| Feb 15, 2005 | Completed final sign-off May 2006 | 59 Clipper St | Ventana 76 | horizontal 04addition of new living room and den at back of residence.Details
horizontal 04addition of new living room and den at back of residence. | $75,000 |
| Aug 8, 2000 | Completed final sign-off Apr 2001 | 547 Lombard St | comply with notice of violation #200004018 issued by his(legalize guest rm bthrm/connect stairsDetails
comply with notice of violation #200004018 issued by his(legalize guest rm bthrm/connect stairs | $1,500 |