S F G Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Feb 2022
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 2, 2022 | Completed final sign-off Apr 2024 | 2240 Beach St | revision to pa# 201911268222. consisting of reduced 1st fl footprint by 60 sqft & the 2nf fl by 24 sqft. eliminating 3 windows & 3 skylights. all notes & dimensions on the approved plans to remain except as shown on proposed drawings.Details
revision to pa# 201911268222. consisting of reduced 1st fl footprint by 60 sqft & the 2nf fl by 24 sqft. eliminating 3 windows & 3 skylights. all notes & dimensions on the approved plans to remain except as shown on proposed drawings. | |
| Nov 26, 2019 | Completed final sign-off Sep 2024 | 2240 Beach St | remodel & addition to existing residence. new first floor unit at rear, remodel second floor with addition at rear (2nd unit)**maher 14Details
remodel & addition to existing residence. new first floor unit at rear, remodel second floor with addition at rear (2nd unit)**maher 14 | $450,000 |
| Feb 16, 2018 | Completed final sign-off Jan 2019 | 474 17th Av | kitchen and bathroom renovation.Details
kitchen and bathroom renovation. | $36,000 |
| Aug 3, 2017 | Completed final sign-off Jan 2019 | 474 17th Av | 3rd floor - renovation of existing bathroom, new electrical + lighting, fixtures, new plumbing fixtures, new washer dryer. new unit skylight to replace existing no visible from street.Details
3rd floor - renovation of existing bathroom, new electrical + lighting, fixtures, new plumbing fixtures, new washer dryer. new unit skylight to replace existing no visible from street. | $35,000 |
| May 23, 2014 | Completed final sign-off Aug 2014 | 517 Hickory St | replace (e) exterior stairs.Details
replace (e) exterior stairs. | $10,000 |
| Oct 18, 2013 | Completed final sign-off May 2014 | 517 Hickory St | new in line gear driven elevator servicing garage, 1st, 2nd fl. remove interior partition at e kitchen and install new cabinets. relocate furnace, water heater as required.Details
new in line gear driven elevator servicing garage, 1st, 2nd fl. remove interior partition at e kitchen and install new cabinets. relocate furnace, water heater as required. | $100,000 |
| Jun 21, 2013 | Completed final sign-off Aug 2014 | 214 Coleridge St | roof deck. replace (e) torch down roof w/ walkable membrane @ (e) roof. replace (e) windows w/ doors for accessDetails
roof deck. replace (e) torch down roof w/ walkable membrane @ (e) roof. replace (e) windows w/ doors for access | $20,000 |
| Oct 19, 2012 | Completed final sign-off Mar 2013 | 535 Florida St | interior tenant improvement of (e) restaurant into new commercial kitchen & restaurant. work includes new partitions, fixtures, finishes, equipment. m.e.p, fire protection under seperate permits. no exterior work.Details
interior tenant improvement of (e) restaurant into new commercial kitchen & restaurant. work includes new partitions, fixtures, finishes, equipment. m.e.p, fire protection under seperate permits. no exterior work. | $300,000 |
| Aug 16, 2012 | Completed final sign-off Mar 2013 | 535 Florida St | interior soft demo only on ground & 2nd floors, no construction, space vacant, per ab-017Details
interior soft demo only on ground & 2nd floors, no construction, space vacant, per ab-017 | $10,000 |
| Jul 13, 2009 | Completed final sign-off Sep 2009 | 2667 37th Av | existing metal deck & stairs to be "take down"-disassemble to re-galvanized each pieces and re-assemble back in-kind. no structural changes. as per #200303180064.Details
existing metal deck & stairs to be "take down"-disassemble to re-galvanized each pieces and re-assemble back in-kind. no structural changes. as per #200303180064. | $8,000 |
| Jun 11, 2009 | Completed final sign-off May 2010 | 214 Coleridge St | horizontal rear addition to include an on site garage, new bath, & new bedroom. (variance #2008-0929v).Details
horizontal rear addition to include an on site garage, new bath, & new bedroom. (variance #2008-0929v). | $100,000 |
| Oct 30, 2007 | Completed final sign-off Dec 2008 | 514 Jersey St | replace front stair with wood & conc. retaining wall previous permit at this address is app #200607186940s1Details
replace front stair with wood & conc. retaining wall previous permit at this address is app #200607186940s1 | $4,000 |
| Oct 30, 2007 | Completed final sign-off Dec 2008 | 516 Jersey St | replace conc. retaining wall @ frontDetails
replace conc. retaining wall @ front | $1,000 |
| Sep 13, 2007 | Completed final sign-off Apr 2008 | 101 Tiffany Av | kitchen remodel. replace cbinets door and applances in (e) places. reconnect electrical, gas, water pipes. 50% wattage has to be high efficiency & switched seperately.Details
kitchen remodel. replace cbinets door and applances in (e) places. reconnect electrical, gas, water pipes. 50% wattage has to be high efficiency & switched seperately. | $20,000 |
| Jun 12, 2007 | Completed final sign-off Jun 2007 | 524 Jersey St | renew pa#200508291477 for final inspection.Details
renew pa#200508291477 for final inspection. | |
| Jun 21, 2006 | Completed final sign-off Aug 2006 | 2234 Beach St | new cabinets, appliances, sink @ upper unit kitchen.Details
new cabinets, appliances, sink @ upper unit kitchen. | $40,000 |