Back to kitchen remodel contractors
S F G Construction Co.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2006 to Feb 2022
- Last 24 months
- 0 permits filed
16 permits since 2000: 16 completed.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
5 kitchen remodel permits: 5 completed. Typically 20 days from filing to permit and 114 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 16, 2018 | Completed final sign-off Jan 2019 | 474 17th Av | kitchen and bathroom renovation.Details
kitchen and bathroom renovation. | $36,000 |
| Oct 18, 2013 | Completed final sign-off May 2014 | 517 Hickory St | new in line gear driven elevator servicing garage, 1st, 2nd fl. remove interior partition at e kitchen and install new cabinets. relocate furnace, water heater as required.Details
new in line gear driven elevator servicing garage, 1st, 2nd fl. remove interior partition at e kitchen and install new cabinets. relocate furnace, water heater as required. | $100,000 |
| Oct 19, 2012 | Completed final sign-off Mar 2013 | 535 Florida St | interior tenant improvement of (e) restaurant into new commercial kitchen & restaurant. work includes new partitions, fixtures, finishes, equipment. m.e.p, fire protection under seperate permits. no exterior work.Details
interior tenant improvement of (e) restaurant into new commercial kitchen & restaurant. work includes new partitions, fixtures, finishes, equipment. m.e.p, fire protection under seperate permits. no exterior work. | $300,000 |
| Sep 13, 2007 | Completed final sign-off Apr 2008 | 101 Tiffany Av | kitchen remodel. replace cbinets door and applances in (e) places. reconnect electrical, gas, water pipes. 50% wattage has to be high efficiency & switched seperately.Details
kitchen remodel. replace cbinets door and applances in (e) places. reconnect electrical, gas, water pipes. 50% wattage has to be high efficiency & switched seperately. | $20,000 |
| Jun 21, 2006 | Completed final sign-off Aug 2006 | 2234 Beach St | new cabinets, appliances, sink @ upper unit kitchen.Details
new cabinets, appliances, sink @ upper unit kitchen. | $40,000 |