Ricky Mason
- Listed as
- architect
- Firm
- Gehricke+Mason Architects
- On San Francisco permits
- Mar 2016 to Jan 2021
8 permits since 2000 (architect on 8 permits): 5 completed, 3 never finaled.
This is the city’s permit record, not a license check: the role and the number come from what was written on each permit (the number spelled one way). It does not show whether the license is current. How to read these records
Most recent permits
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jan 23, 2021 | Never finaled issued Feb 2022, no final | 1922 09th Av | Finbarr Collins Construction Inc. | convert portion of 1st fl to habitable space; remodel converted space & (e) habitable space for use as 1-bedrm,1-bath,fitness,laundry; remodel int'r staircase. demolish int'r raised fl & wall framing & finish; reinforce foundation; wood framing int'r & ext'r walls/ceiling/floor assemblies, ext'rDetails
convert portion of 1st fl to habitable space; remodel converted space & (e) habitable space for use as 1-bedrm,1-bath,fitness,laundry; remodel int'r staircase. demolish int'r raised fl & wall framing & finish; reinforce foundation; wood framing int'r & ext'r walls/ceiling/floor assemblies, ext'r | $200,000 |
| Jul 28, 2020 | Completed final sign-off Dec 2020 | 4657 19th St | G&C Construction Services Inc. | revise permit #2019-1219-0057: 4659-remove wall partitions, replace ceiling dropped header w/ flush header & 1-window & door at rear wall w/ double patio doors & add gas burning fireplace & electrical high efficiancy led low voltage lighting fixtures & switches & receptacles.Details
revise permit #2019-1219-0057: 4659-remove wall partitions, replace ceiling dropped header w/ flush header & 1-window & door at rear wall w/ double patio doors & add gas burning fireplace & electrical high efficiancy led low voltage lighting fixtures & switches & receptacles. | $75,000 |
| Feb 25, 2020 | Completed final sign-off Apr 2020 | 316 Juanita Wy | revision to pa 2018-0427-7668 change layout of laundry & mechanical rooms by relocating the laundry room to the closet room. add new doorsDetails
revision to pa 2018-0427-7668 change layout of laundry & mechanical rooms by relocating the laundry room to the closet room. add new doors | ||
| Apr 27, 2018 | Completed final sign-off Apr 2020 | 316 Juanita Wy | Baytown Construction | to comply with nov #201842114 & 201841841, alteration to (e) home, including removing walls, finishes, doors, replacing windows, in - kind, new plumbing, remodel the three floors and update the layout of the house, structural reinforcement, demolish stairs in basement & reframing,Details
to comply with nov #201842114 & 201841841, alteration to (e) home, including removing walls, finishes, doors, replacing windows, in - kind, new plumbing, remodel the three floors and update the layout of the house, structural reinforcement, demolish stairs in basement & reframing, | $150,000 |
| May 5, 2017 | Completed final sign-off Jul 2018 | 7 Seward St | G&C Construction Services Inc. | remodel 1 bathroom/shower, add bathroom with shower, remodel kitchen, new wiring/plumbing. side windows into alleway to be casement type.Details
remodel 1 bathroom/shower, add bathroom with shower, remodel kitchen, new wiring/plumbing. side windows into alleway to be casement type. | $85,000 |
| Jan 17, 2017 | Never finaled issued Dec 2017, no final | 414 12th Av | to comply with nov #201643721. attic: add 3 dormers, skylight, new bathroom, new bedroom, roof deck over extg roof below, double doors. 2nd floor: steel beam, removal of walls, interior remodel, folding doors, relocate rear stairway. 1st fl: remodel extg area, remodel 2 bathrooms, add 2 closets.Details
to comply with nov #201643721. attic: add 3 dormers, skylight, new bathroom, new bedroom, roof deck over extg roof below, double doors. 2nd floor: steel beam, removal of walls, interior remodel, folding doors, relocate rear stairway. 1st fl: remodel extg area, remodel 2 bathrooms, add 2 closets. | $300,000 | |
| Oct 14, 2016 | Never finaled issued Aug 2017, no final | 333 Potrero Av | comply w/nov #201601741 - repair wall dryrotted < 50%. repair dryrotted floors & exterior sidings < 50%. repair cracks in foundation with expoxy dowls. & epoxy rebars. revision to pa# 2016-0810-4730: convert work room to bedroom & relocate bathroom for both units. replace windows w/wood clDetails
comply w/nov #201601741 - repair wall dryrotted < 50%. repair dryrotted floors & exterior sidings < 50%. repair cracks in foundation with expoxy dowls. & epoxy rebars. revision to pa# 2016-0810-4730: convert work room to bedroom & relocate bathroom for both units. replace windows w/wood cl | $10,000 | |
| Mar 15, 2016 | Completed final sign-off Jul 2017 | 1908 09th Av | Baytown Construction | limited to bldg exterior alteration at west front elevation to repair siding and stair guard and hand rail. replace extg door with window. roofing at portch. replace extg light fixtures.Details
limited to bldg exterior alteration at west front elevation to repair siding and stair guard and hand rail. replace extg door with window. roofing at portch. replace extg light fixtures. | $25,000 |